ML17290A970

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-397/94-03 on 940124-27.No Violations Noted
ML17290A970
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/04/1994
From: Reese J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17290A971 List:
References
NUDOCS 9402230065
Download: ML17290A970 (4)


See also: IR 05000397/1994003

Text

FORD 1

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ip

ACCESSION NBR:9402230065

DOC.DATE: 94/02/04

NOTARIZED: NO

FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public

Powe

AUTH.NAME

AUTHOR AFFILiATION

REESEiJ.H.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

PARRISH,J.V.

Washington Public Power Supply System

DOCKET

05000397

RECIPIENT

ID CODE/NAME

PDV PD

COPIES

LTTR ENCL

1

1

RECIPIENT

ID CODE/NAME

CLIFFORD,J

COPIES

LTTR ENCL

1

1

SUBJECT:

Forwards insp rept 50-397/94-03

on 940124-27.No violations

noted.

DISTRIBUTION CODE:

IE06D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: Environ

& Radiological

(50 DKT)-Insp Rept/Notice of Violation

NOTES:

D

R spons

S/

F

INTERNAL: ACRS

AEOD/TTC

NRR/DREP/PRPB10

NRR/PMAS/ILRB12

EG~E

02

RGN5

DRSS/RPB

RGN4/FIPS

l TERNAL: EGGG SIMPSON,F

NSIC

2

2

1

1

2

2

1

1

1

1

1

1

1

1

1

1

2

2

1

1

AEOD/DSP

NMSS/SGTB

4E4

NRR/DRIL/RPEB10

NUDOCS-ABSTRACT

OGC/HDS1

RES

RGN5

FILE

01

NRC

PDR

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

NOTE TO ALL RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM P 1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION

LISTS FOR DOCUMENTS YOU DON'T NEED!

'TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

23

ENCL,

23

~G

~p,g REGS

O~

aCy

A

+>>*++

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1450 MARIALANE

WALNUTCREEK, CALIFORNIA94596-5368

Docket 50-397

.

License

NPF-21

Washington Public Power Supply System

(WPPSS)

P.O.

Box 968

3000 George

Washington

Way

Richland,

Washington

99352

, Attention:

Hr. J.

V. Parrish

Assistant

Hanaging Director, Operations

SUBJECT:

NRC INSPECTION

REPORT 50-397/94-03

During the period of January

24-27,

1994, Hr. K. Brewer of this office

conducted

a routine inspection of activities authorized

by NRC License

Number

NPF-21, for Washington Nuclear Project

2 (WNP-2).

At the conclusion of the

inspection,

Hr. Brewer discussed

our findings with members of your staff

identified in the enclosed report.

Areas

examined during this inspection

are described

in the enclosed report.

Within these

areas,

the inspection consisted of selective

examinations of

procedures

and representative

records,

interviews with personnel,

independent

measurements,

and observations

by the inspector of activities in progress.

No violations of NRC requirements

were identified within the scope of this

inspection.

In accordance

with 10 CFR 2.790(a) of the NRC's "Rules of Practice,"

a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be glad to

discuss

them with you.

S'ely,

Enclosures:

Inspection

Report 50-397/94-03

Jam

c

. Reese,

Chi

ities Radiological Protection

Branch

~~ C) )q rj I~

9402230065

940204

PDR

ADOCK 05000397

8

PDR

~EB 0 4

1gg4

cc w/enclosure:

D. Coleman,

Acting Hanager,

Regulatory

Programs,

WPPSS

J.

W. Swailes,

WNP-2 Plant Hanager,

WPPSS

Hr. A.

G. Hosier, Licensing Hanager,

WPPSS

G.

E.

Doupe,

Esq.,

WPPSS

Chairman,

Benton County Board of Commissioner s

H. H. Phillips, Esq.,

Winston

5 Strawn

Warren A. Bishop,

Energy Facility Site Evaluation Council

Fc.B C4

<Ggg

cc w/enclosure:

D. Coleman, Acting Hanager,

Regulatory

Programs,

WPPSS

J.

W. Swailes,

WNP-2 Plant Hanager,

WPPSS

Hr. A. G. Hosier, Licensing Hanager,

WPPSS

G.

E. Doupe,

Esq.,

WPPSS

Chairman,

Benton County Board of Commissioners

H. H. Phillips, Esq.,

Winston 5 Strawn

Warren A. Bishop,

Energy Facility Site Evaluation Council

bcc w/ enclosures:

Docket File

Resident

Inspector

Project Inspector

G.

Cook

R. Huey

K. Perkins

B. Hurray,

RIV

D. Sullivan,

ILPB (Electronic Copy)

bcc w/o enclosures:

H. Smith

KBrewer

JReese

</<84

RE(VEST

COPY

ES

NO

RE(VEST

COPY

E

NO

SEND TO

PDR

SEND TO DCS

YES

NO

YES

NO