Monthly Operating Rept for Nov 1993 for Wppss 2.W/931208 Ltr
ML17290A814
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/30/1993
From: Embree D, Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-93-284, NUDOCS 9312150023
Download: ML17290A814 (6)


Text

ACCELERATED DISTRIBUTION DEMONSTVTION SYSTEM REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS)

'CCESSION NBR:9312150023 DOC.DATE: NOTARIZED: NO DOCKET FACXL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILXATION EMBREE,D.G. Washington Public Power Supply System PARRISH,J.V. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFXLIATION

SUBJECT:

Monthly operating rept for Nov 1993 for WPPSS 2. /931208 ltr. D DXSTRIBUTION CODE: IE24D COPIES RECEIVED LTR ENCL SIZE:

TXTLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPXES RECIPIENT COPIES ID"CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PDV LA 3 3 PDV PD 1 1 CLIFFORD,J 1 1 D INTERNAL'CRS 10 10 AEOD/DOA 1 1 D AEOD/DS P/TPAB 1 1 RR OEAB 1 1 NRR/DRX L/RPE 8 1 1 REG FILE 01 1 1 RGN5 1 1 EXTERNAL: EGGG BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

'A A

0 l

ai WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 December 8, 1993 G02-93-284 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Dear Sirs:

Subject:

NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT NOVEMBER, 1993 Transmitted herewith is the Monthly Operating Report for the month of November 1993 as required by our Technical Specifications 6.9.1.6.

Sincerely,

. V. Parrish Assistant Managing Director, Operations (MD 1023)

JVP:DGE CC: Mr. W.H. Lovelace, NRC, Washington, DC Mr. B.H. Faulkenburry, NRC Region V Mr. R.C. Barr, NRC Resident Inspector (901A)

Ms. D. Sherman, ANI Library

, Mr. J.T. Wheelock, INPO Mr. C. Bergesen, Utility Data Institute Mr. J.T. Irish, BPA (399) 9312150023 931130 PDR 'DOCK 05000397 R PDR

OPERATING STATUS REPORT for WNP-2 Date: December 1, 1993 Docket: 50-397

2. Reporting Period: NOVEMBER 1993 Outage + On-Line Hours: 720.0
3. Utility

Contact:

David G. Embree (509) 377-8448 4 Licensed Thermal Power (MW, ): 3323

5. Nameplate Rating (Gross MW, ): 1200.9
6. Design Electrical Rating (Net MW,): 1120
7. Maximum Dependable Capacity (Gross MW,): 1132*
8. Maximum Dependable Capacity (Net MW, ): 1086*
9. Ifchanges occur above since last report, give reasons:
  • Re-calculated MDC for most restrictive month due to environmental effects, back to Jan. 1, 1993.
10. Power to which restricted, ifany (Net MW,): n/a 11 ~ Reasons for restrictions, if any: n/a MONTH YEAR CUMULATIVE
12. Report Period Hours 720.0 8,016.0 78,584.2
13. Hours Reactor Critical 720.0 6,217.5 55,366.2
14. Rx Reserve Shutdown Hours 0.0 0.0 340.4
15. Hours Generator On-Line 720.0 6,015.3 53,323.0
16. Unit Reserve Shutdown Hours 0.0 0.0 381.7
17. Gross Thermal Energy (MVH) 2,384,392 19,135,479 156,300,129
18. Gross Electrical Energy (MWH) 831,970 6,604,560 52,453,650
19. Net Electrical Energy (MPH) 801,771 6,308,052 50,258,471
20. Unit Service Factor 100.0% 75.0% 67.9%
21. Unit Availability Factor 100.0% 75.0% 68.3%
22. Unit Capacity Factor (MDC Net) 102.5% 72.5% 58.5%
23. Unit Capacity Factor (DER Net) 99.4% 70.3% 58.1%
24. Unit Forced Outage Rate 0.0% 9.2% 12.9%
25. Forced Outage Hours 0.0 612.0 7,885.3
26. Shutdowns scheduled over the next 6 months (type, date, duration):

Refueling Outage, April 15, 1994, 60 Days.

27. If currently shutdown estimated startup date: n/a Note: Cumualtive Unit Capacity Factors (MDC 8c DER) are calculated with weighted averages.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-397 UNIT: WNP-2 DATE: December 1, 1993 COMPLETED BY: D. G. Embree TELEPHONE: (509) 377-8448 REPORT PERIOD: NOVEMBER 1993 AVERAGE DAILYPOWER LEVEL AVERAGE DAILYPOWER LEVEL DAY (Net MWe) DAY (Net MWe) 1115 16 1116 1113 17 1114 1102 18 1114 1117 19 1114 1119 20 1120 1029 21 1110 1120 22 1117 1121 23 1118 1120 24 1120 10 1117 25 1120 1120 26 1118 12 1116 27 1119 13 1118 28 1121 14 1119 29 1118 15 30 1112 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: December 1, 1993 COMPLETED BY: D.G. Embree TELEPHONE: (509) 377-844 REPORT PERIOD: NOVEMBER 1993 No. Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Pievent Recurrence NONE SUIUIMARY: WNP-2 operated near full power during the month with no outages or significant power reductions (>20%).

TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure E - Operator Training & 1 - Manual NUREG<161 Exhibits F & H S - Scheduled B - Maintenance or Test License Examination 2- Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction G - Operational Error 4 - Continued H - Olher 5 - Reduced Load 9 - Other