Forwards Insp Rept 50-397/93-35 on 930920-24.No Violations or Deviations Noted
ML17290A723
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/22/1993
From: Miller L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Vandenburg C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17290A724 List:
References
NUDOCS 9311090060
Download: ML17290A723 (8)


See also: IR 05000397/1993035

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CCESSION NBR:9311090060

DOC.DATE: 93/10/22

NOTARIZED:

NO

DOCKET

.'ACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public

Powe

05000397

AUTH.NAME

AUTHOR AFFILIATION

MILLER,L.P.

Region

5 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

VANDENBURG,C.

Washington Public Power Supply System

SUBJECT:

Forwards insp rept 50-397/93-35

on 930920-24.No violations

or deviations

noted.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

RECIPIENT

ID CODE/NAME

PDV PD

INTERNAL: ACRS

AEOD/DSP/ROAB

AEOD/TTC

NRR/DORS/OEAB

NRR/DRIL/RPEB

NRR/PMAS/ILPBl

NUDOCS-ABSTRACT

OGC/HDS1

RES/HFB

EXTERNAL: EG&G/BRYCE,J.H.

NSIC

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

CLIFFORD,'J

AEOD/DEIB

AEOD/DSP/TPAB

DEDRO

NRR/DRCH/HHFB

NRR/DRSS/PEPB

NRR/PMAS/ILPB2

02

RGN5

FILE

01

NRC PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

NOTE TO ALL RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM P 1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION

LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

24

ENCL

24

1

+pa REC~+

o

C

0g

~n ++*<<+

Docket No. 50-397

License

No.

NPF-21

UNITED STATES

NUCLEAR REGULATORYCOMMISSION

REGION V

1450 MARIALANE

WALNUTCREEK, CALIFORNIA94596-5368

QQ'f p

2, f993

Mashington Public Power Supply System

P.O. Box'68

3000 George

Mashington

Way

Richland,

Mashington

Attention:

Hr. J.

V. Parrish,

Assistant

Hana9ing Director, Operations

SUBJECT:

NRC

INSPECTION OF MASHINGTON NUCLEAR PROJECT,

UNIT 2,

INSPECTION

REPORT

NO. 50-397/93-35

This letter refers to the routine

announced

inspection

conducted

by Hessrs.

H,

J.

Royack

and H. K. Payne of this office during the period of September

20-24,

1993, of activities authorized

by

NRC License

No. NPF-21,

and to the

discussion of their findings held with you and members of your staff on

September

24,

1993.

Areas

examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted

of selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

The,results, of this inspection indicated that you have

implemented

comprehensive

check valve inservice testing

(IST) and check valve reliability

programs to test

and visually inspect

check valves required to perform

a

safety function.

We found that you have provided support for these efforts

through funding and management

involvement.

Hanagement

expectations

were

evidenced

in reviews of procedures

and programs.

However, there remains

areas

in procedures

and guidelines

where your expectations

for the implementation of

portions of the programs

were not clearly defined.

Your continued efforts to

provide

a clear definition of your management

expectations

is encouraged.

No violations or deviations of NRC requirements

were identified within the

scope of this inspection.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

93ii0900hO 93i022

PDR

ADOCK 05000397

8,

PDR

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Since ely,

L..

Mi1 1 er, Jr ., Chi ef,

Reactor Safety Branch

Enclosure:

. Inspection

Report No. 50-397/93-35

cc w/enclosure:

Mr. J.

K. Swailes,

WNP-2 Plant Manager

G.

E.

C. Doupe,

Esq.,

WPPSS

Mr. Warren A. Bishop,

Chairman,

Energy Facility Site Evaluation Council

Mr. Alan G. Hosier, Licensing Manager,

WPPSS

Chairman,

Benton County Board of Commissioners

M. H. Philips, Jr.,

Esq.,

Winston

8 Strawn

4i

bcc w/enclosure:

C. VanDenburgh

Project Inspector

Resident

Inspector

G.

Cook.

B. Faulkenberry

Chief, Hechanical

Engineering

Branch, Division of Engineering Technology,

NRR

Docket File

bcc w/o enclosure:

H. Smith

E. Hakovsky

J. Bianchi

H Payn

10//g /93

EST COPY]

YES /

NO

H Royack

P Johnson """

WAlg

LHiller

10

93

10/>y/93

10/ Po/93

10/~93

E(U

T COPY]

[R

VEST COPY]

[RE(VEST SOP- ]

ST COPY]

[YES /

NO

]

S /

NO

]

[YES /

NO

]

YES

/

NO

]

END TO PDR]

[YES'

NO

]

SF 8 D TC'C5

/es /vo

O8OOOO