Forwards Insp Rept 50-397/93-31 on 930806-0906 & Notice of Violation.Cited Violation Involved Two Examples of Personnel Not Following Procedures
ML17290A712
Person / Time
Site: Columbia 
Issue date: 10/07/1993
From: Vandenburgh C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17290A713 List:
References
NUDOCS 9311020039
Download: ML17290A712 (7)


See also: IR 05000397/1993031

Text

l VRL) l

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CCESSION NBR:9311020039

DOC.DATE: 93/10/07

NOTARIZED: NO

DOCKET ¹

CIL:50-397

WPPSS Nuclear Project, Unit 2, Washington Public Powe

05000397

UTH.NAME

AUTHOR AFFILIATION

ANDENBURGH,C.

Region

5 (Post

820201)

RECIP.NAME

.

RECIPIENT AFFILIATION

PARRISH, J.V.

Washington Public Power Supply System

SUBJECT: Forwards

insp rept 50-397/93-31

on 930806-0906

& notice of

violation. Cited violation involved two examples of personnel

not following procedures.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

I

~o

S/

RECIPIENT

ZD CODE/NAME

PDV PD

INTERNAL: ACRS

AEOD/DSP/ROAB

AEOD/TTC

NRR/DORS/OEAB

NRR/DRIL/RPEB

NRR/PMAS/ILPBl

NUDOCS-ABSTRACT

OGC/HDS1

RES/HFB

EXTERNAL: EG&G/BRYCEiJ.H.

NSIC

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

CLIFFORDiJ

AEOD/DEIB

AEOD/DSP/TPAB

DEDRO

NRR/DRCH/HHFB

NRR/DRSS/PEPB

NRR/PMAS/ILPB2

RMG FILE

02

GN5 " FILE

Ol

NRC

PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

NOTE TO ALL RIDS

RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM PI-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION

LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

24

ENCL

24

V

,h

pe Rfcy

+y

~O

+a*++

UNITED STATES

NUCLEAR REGULATORYCOMMISSION

REGION V

1450 MARIALANE

WALNUTCREEK, CAUFORNIA94596-5368

Docket No.

50-397

October 7,

1993

Washington Public Power Supply System

P. 0.

Box 968

Richland,

Washington

99352

Attention:

Hr. J.

V. Parrish

Assistant

Hanaging Director for Operations

Gentlemen:

SUBJECT'OTICE

OF VIOLATION

(NRC INSPECTION REPORT

NO. 50-397/93-31)

This refers to the inspection

conducted

by Hessrs.

R.

C. Barr,

D. L. Proulx,

K. E. Johnston,

D.

E. Corporandy,

and H.

P.

Payne of this'office on August

3

through September

6,

1993, of activities authorized

by

NRC Operating

License

No. NPF-21,

and to the discussions

of findings held by the inspectors

with Hr.

J. Swailes

and other members of the Supply System staff at'he

conclusion of

the inspection;

Areas

examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examina-

tions of procedures

and representative

records,

interviews with personnel,

and

observations

by the inspectors.

Based

on the results of this inspection, it appears

that certain of your

activities were not conducted

in full compliance with NRC requirements,

as set

forth in the enclosed

Notice of Violation (Notice).

The cited violation

involved two examples of personnel

not following procedures.

In the first

example,

craftsmen did not stop to obtain

an approved deviation for a

procedure that could not be strictly followed,

and in the second

example,

craftsmen did not initiate a problem evaluation request

(PER) after observing

the incorrect assembly of a valve.

In addition, five non-cited violations

were noted.

These involved two instances

of inadequate

post-maintenance

testing,

two instances

of procedure

nonadherence

caused

by the lack of self-

checking

by I&C technicians,

and

an inadequate

surveillance

procedure.

In addition, this inspection identified three instances

in which it appeared

that Licensee

Event Reports

(LERs) did not contain

a full and clear discussion

of the events,

or when

a documented

analysis

could not be made available to

the inspector to support assertions

made in the

LERs.

We will continue our

reviews of these

LERs following your further review.

You are required to respond to this letter and should follow the instructions

specified in the enclosed

Notice when preparing your response.

In your

response,

you should document the specific actions

taken

and any additional

9311020039

931007

"

PDR

ADOCK 05000397

PBR,

+<0

C

0

actions you plan to prevent recurrence.

After reviewing your response

to this

Notice, including your proposed corrective actions

and the results of future

inspection,

the

NRC will determine whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

In accordance

with 10 CFR 2.790(a),

a copy of this letter, the enclosure,

and

your response will be placed in the

NRC Public Document

Room.

The response

directed

by this letter and the accompanying

Notice are not

subject to the clearance

procedures

of the Office of Hanagement

and Budget

as

required

by the Paperwork Reduction Act of 1980,

Pub.

L.96-511.

Should you have

any questions

concerning this inspection,

we will be pleased

to.discuss

them with you.

Sincerely,

Enclosure:

1.

Notice of Violation

2.

Inspection

Report

No. 50-397/93-31

C. A. VanDenburgh,

hief

Reactor Projects

Branch

cc:

W.

G. Counsil,

Hanaging Director

A. L. Oxsen,

Deputy Hanaging Director

J.

V. Parrish, Assistant

Hanaging Director for Operations

J.

C. Gearhart,

equality Assurance

Director

J.

W. Swailes,

WNP-2 Plant Hanager

A. G. Hosier,

WNP-2 Licensing Hanager

G.

E.

Doupe,

Esq.

Winston

8 Strawn

State of Washington

bcc w/copy of enclosures

1 and 2:

Docket File

Project Inspector

Resident

Inspector

B. Faulkenberry

S. Richards

R.

Huey

P. Johnson

J. Clifford, NRR

G. Cook

bcc w/enclosure

1 only:

M. Smith

J. Bianchi

J. Zollicoffer

REGI

V

KJo

ton 4~P

Co

10/

/93 '0/ / 3

10/

o

ndy

M ayne

ar

/ 3

10/7 /93

10/

/93

YES

NO

YES

NO

ES

NO

S

NO

ES

NO

PJ

ns

10/

/93

RHue

10/p'/93

CVanDen

u

10/

/93

ES

NO

ES

NO

YES

YES

NO

YES

NO

File Location:

G: )PSI)W2-93-31. PHJ