Amend 119 to License NPF-21,adding one-time Extension to Requirement for Testing Response Times of Actuation Channels for Containment Isolation
ML17290A693
Person / Time
Site: Columbia 
Issue date: 10/15/1993
From: Adensam E
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17290A694 List:
References
NUDOCS 9310200297
Download: ML17290A693 (7)


Text

~g Argy

+~

~o nO C

0 C!

" '+

~

o~

+a*++

UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON,D. C. 20555 WASHINGTON PUB C

OWER SUPPL YSTE

~0!

II 50-3!

MENOMENT TO CILI Y 0 ERATING LICENS Amendment No. 119 License No. NPF-21 The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by the Washington Public Power Supply System (licensee) dated October 2,

1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; 2.

D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part Sl of the Commission's regulations and all applicable requirements have been satisfied.

Accordingly, the license is amended by changes to the Technical Speci-fications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. NPF-21 is hereby amended to read as follows:

esiOAO0a97 e3iOa6l I

PDR ADOCK- 05000397 P

P..DR~

(2) e ca e

a nd v

o me t t c 3.

The Technical Specifications contained in Appendix A, as revised through Amendment No.

119 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

This amendment is effective as of the date of issuance.

FOR THE NUCLEAR REGULATORY CONMISSION Elinor G. Adensam, Assistant Director for Regions IV k V Reactors Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

October 15, 1993

1

TT CHHENT 0

C S

CKET 0.

0-397 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages.

The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.

The corresponding overleaf pages are also provided to maintain document completeness.

QEHOVE

~INSER 3/4 3-11 3/4 3-11

<I

S R

SURVEILLANCE RE UIR MENTS 4.3.2.1 Each isolation actuation instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL FUNCTIONAL TEST and CHANNEL CALIBRATION operations for the OPERATIONAL CONDITIONS and at the frequencies shown in Table 4.3.2.1-l.

4.3.2.2 LOGIC SYSTEM FUNCTIONAL TESTS and simulated automatic operation of all channels shall be performed at least once per l8 months.

4.3.2.3 The ISOLATION SYSTEM RESPONSE TIME of each isolation trip function shown in Table 3.3.2-3 shall be demonstrated to be within its limit at least once per 18 months.*

Each test shall include at least one channel per trip system such that all channels are tested at least once every N times 18 months, where N is the total number of redundant channels in a specific isolation trip system.

  • Response time testing of the Isolation Actuation Instrumentation

Response

Times for Isolation Groups 3 and 4, as specified in Technical Specification Table 3.3.2-1, is not a requirement for OPERABILITY until entry into a COLD SHUTDOWN condition no later than startup from the Spring I994 Refueling Outage.

WASHINGTON NUCLEAR UNIT 2 3/4 3-11 Amendment No.

119

V ll l

l l