Text
RECIPZENT
ID CODE/NAME
PDV PD
COPIES
LTTR ENCL
1
1
RECIPIENT
ID CODE/NAME
CLIFFORDiJ
COPIES
LTTR ENCL
1
1
L VIUE
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
! 'CCESSION NBR:9306240021
DOC.DATE: 93/06/09
NOTARIZED:
NO
j.
ACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe
UTH.NAME
AUTHOR AFFILIATION
ANDENBURGH,C.
Region
5 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
SORENSEN,G.C.
Washington Public Power
Supply System
SUBJECT:
Forwards
insp rept 50-397/93-13
on 930330-0510
6 notice of
violation.NRC concerned
that procedure
adherence
problems
continue to occur
a corrective actions for similar problems
identified by
NRC have not prevented
recurrence.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
DOCKET
05000397
D
S,/f
Q
i
R,
INTERNAL: ACRS
AEOD/DSP/TPAB
DEDRO
NRR/DRIL/RPEB
NRR/DRSS/PEPB
NRR/PMAS/ILPB2
OE DIR
Rf'"G~E
0 2
RGN5
FILE
01
EXTERNAL'GSrG/BRYCE gJ
~ H ~
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
AEOD/DEIB
AEOD/TTC
NRR/DRCH/HHFB
NRR/DRPW/OEAB
NRR/PMAS/ILPBl
NUDOCS-ABSTRACT
OGC/HDS1
RES MORISSEAUiD
NRC PDR
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
D'OTE
TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOh1 P 1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
23
ENCL
23
~ C
~p,R AEONS,Mp
~4
0
Cy
4r
fl0
Iy
++*++
Docket No.
50-397
UNITED STATES
NUCLEAR REGULATORYCOMMISSION
REGION V
1450 MARIALANE
WALNUTCREEK, CAUFORNIA94596-5368
June
9,
1993
Washington Public Power Supply System
P. 0.
Box 968
Richland,
99352
Attention:
Mr. G.
C. Sorensen
Manager,
Regulatory
Programs
Gentlemen:
SUBJECT:
(NRC INSPECTION
REPORT
NO. 50-397/93-13)
This refers to the inspection
conducted
by Messrs.
R. C. Barr,
D. L. Proulx,
and
W. L. Johnson of this office on March 30 through
May 10,
1993, of
activities authorized
by
NRC Operating
License
No. NPF-21,
and to the
discussions
of findings held by the inspectors with Mr. J.
Baker and other
members of the Supply System staff at the conclusion of the inspection.
Areas
examined during this inspection
are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examina-
tions of procedures
and representative
records,
interviews with personnel,
and
observations
by the inspectors.
Based
on the results of this inspection, it appears- that certain of your
activities were not conducted in full compliance with NRC requirements,
as set
forth in the enclosed
Notice of Violation (Notice) .
One violation consists of
several
examples of personnel
not following procedures.
Although these
examples
represented
administrative deficiencies,
we are concerned that
procedure
adherence
problems continue to occur
and that your corrective
actions for similar problems identi fied by the
NRC during the past
two years
have not been effective in preventing their recurrence';
As indicated in your
recent
response
to SALP Report No. 93-04, additional
management
attention in
this area
appears
warranted.
The second violation concerns
not maintaining
the plant's
drawings current with respect
to Thermolag configurations.
This
violation is significant because it uncovered
a potential deficiency in your
response
to
NRC Generic Letter 92-08, in that you would have failed to perform
cabling ampaci ty derating calculations for all the cabling protected
by
Thermolag
as previously committed.
You are required to respond to this letter and should follow the instructions
specified in the enclosed
Notice when preparing your response.
In your
response,
you should document the specific actions
taken
and any additional
actions
you plan to prevent recurrence.
After reviewing your response
to this
Notice, including your proposed corrective actions
and the results of future
inspection,
the
NRC will determine
whether further
NRC enforcement
action is
930624002i
930609
ADOCK 05000397
8
/<Ir8l
. necessary
to ensure
compliance with NRC regulatory requirements.
In accordance
with 10 CFR 2.790(a),
a copy of 'this letter, the enclosure,
and
your response will be placed in the
NRC Public Document
Room.
The response
directed
by this letter and the accompanying
Notice are not
subject to the clearance
procedures
of the Office of Management
and Budget
as
required
by the Paperwork Reduction Act of 1980,
Pub.
L.96-511.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
C. A. VanDenburgh,
C
ef
Reactor Projects
Branch
Enclosures:
1.
2.
Inspection
Report
No. 50-397/93-13
cc:
Hr. J.
W. Baker,
WNP-2 Plant Manager
G.
E.
C.
Doupe,
Esq.,
Hr. Warren A. Bishop,
Chairman,
Energy Facility Site Evaluation Council
Hr. Alan G. Hosier,
Licensing Manager,
Hr. J.
V. Parrish, Assistant
Managing Director for Operations,
Hr. James
C. Gearhart,
Director, guality Assurance,
Chairman,
Benton County Board of Commissioners
H. H. Philips, Esq.,
Winston
8. Strawn
'
bcc w/copy of enclosures:
Docket File
Project Inspector
Resident
Inspector
B. Faulkenberry
R.
Huey
C. VanDenburgh
P. Johnson
J. Clifford, NRR
G.
Cook
S. Richards
bcc w/enclosure
1:
M. Smith
J. Bianchi
J. Zollicoffer
REGION
V
r
non ~
r
1x
6/0 /93
6/ 1/93
6/
/93
PJ
n
6/ /3
RHuey
6/
/93
NO
C
NO
C
S
C
YES
NO
YES
NO
YES
C
NO
CVan
e
gh
6/q
3
YES
C
NO
NO
File Location:
G: )PSI )W2-93-13. PHJ
a30039
~ ~