ML17290A208
| ML17290A208 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 04/05/1993 |
| From: | Miller L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17290A209 | List: |
| References | |
| NUDOCS 9304200060 | |
| Download: ML17290A208 (6) | |
See also: IR 05000397/1993009
Text
FORD I
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS),
ACCESSION NBR:9304200060
DOC.DATE: 93/04/05
NOTARIZED: NO
DOCKET I
ACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public
Powe
05000397
AUTH.NAME
AUTHOR AFFILIATION
MILLER,L.F.
Region
5 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
SORENSEN,G.C.
Washington Public Power Supply System
SUBJECT:
Forwards
insp rept 50-397/93-09
on 930301-05.No violations
or deviations
noted.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
+lS
RECIPIENT
ID CODE/NAME
ONDD PD
INTERNAL: ACRS
AEOD/DSP/TPAB
DEDRO
NRR/DRCH/HHFB
NRR/DRSS/PEPB
NRR/PMAS/ILPB2
OE DIR
EG
02
RGN5
FILE
01
TERNAL: EGGG/BRYCE,J.H.
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
CLIFFORD,J
AEOD/DEIB
AEOD/TTC
NRR/DORS/OEAB
NRR/DRIL/RPEB
NRR/PMAS/ILPB1
NUDOCS-ABSTRACT
OGC/HDS1
RES MORISSEAU,D
NRC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
NOTE TO ALL RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOh! P 1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR .
23
ENCL
23
~S Ato>
P0
Cy
n0
PVl
o
t7 +>>*++
UNITED STATES
NUCLEAR REGULATORYCOMMISSION
REGION V
1450 MARIALANE
WALNUTCREEK. CAUFORNIA94596-5368
APR OS
<993
Docket No. 50-397
'icense
No. NPF-21
Washington Public Power Supply System
P. 0.
Box 968
3000 George
Way
Richland,
Attention:
Hr.
G.
C. Sorensen,
Hanager,
Regulatory
Programs
SUBJECT:
NRC
INSPECTION
OF WASHINGTON NUCLEAR PROJECT,
UNIT 2,
INSPECTION
REPORT 50-397/93-09
This letter refers to the routine
announced
inspection
conducted
by Hr. C.
Clark of this office during the period of Harch 1-5,
1993, of activities
authorized
by
NRC License
No. NPF-21,
and to the discussion
of his findings
held with Hr. J.
Baker and other members of your staff on Harch 5,
1993.
Areas
examined during this inspection
are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
No violations or deviations of NRC requirements
were identified within the
scope of this inspection.
In accordance
with 10 CFR 2.790(a),
a copy of this letter
and the enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sin erely,
. F. Hiller,
, Chief,
Reactor Safety Branch
Enclosure:
Inspection
Report
No. 50-397/93-09
93042000b0
930405
ADQCK 05000397
8
gl
'
lj
CC:
Nr. J.
W. Baker,
WNP-2 Plant Hanager
G.
E.
C.
Doupe,
Esq.,
Hr. Warren A.. Bishop,
Chairman,
Energy Facility Site Evaluation Council
Hr. Alan G. Hosier,
Licensing Hanager,
Hr. J.
V. Parrish,
Assistant
Hanaging Director for Operations,
Hr. James
C. Gearhart,
Director, equality Assurance,
Chairman,
Benton County Board of Commissioners
H. H. Philips,
Esq.,
Winston
& Strawn
APP OS
1S93
bcc w/enclosure:
P. Johnson
Project Inspector
Resident
Inspector
G.
Cook
B. Faulkenberry
J. Martin
Docket File
bcc w/o enclosure:
M. Smith
J. Zollicoff
J. Bianchi
c ~~M
C. Clark
3 /I9/93
er
P.
John
on
MAng
L. Hiller
3 /Zg/93
3 /8/93
3 /g~/93
ST COPY]
[REQUEST
OP
'[REQUEST Jdg?Y
[REQUEST 4
YES /
NO
]
[YES / (NO
]
[YES /
~N(5
]
[YES /
0
]
SEND
TO DCS
YES
NO 0
SEND
TO
YES
NO 0
190015
>c~ I