Monthly Operating Rept for Mar 1993 for Washington Nuclear Plant 2.W/undated Ltr
ML17290A192
Person / Time
Site: Columbia 
Issue date: 03/31/1993
From: John Baker, Hutchison L
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-93-084, GO2-93-84, NUDOCS 9304150139
Download: ML17290A192 (10)


Text

ACCEI ERATQig DOCVMENTDIST VTION SYSTEM REGULATE'NFORMATION DISTRIBUTIO YSTEM (RIDS)

AC(;ESSION NBR:9304150139 DOC.DATE: 93/03/31 NOTARIZED:

NO DOCKET FACIAL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.B.

Washington Public Power Supply System BAKER,J.W.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Mar 1993 for Washington Nuclear Plant 2.W/undated ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT ID CODE/NAME ONDD LA CLIFFORD,J COPIES RECIPIENT LTTR ENCL.

ID CODE/NAME 3

3 ONDD PD 1

1 COPIES LTTR ENCL 1

1 INTERNAL: ACRS AEOD/DSP/TPAB NRR/DRIL/RPEB RGNS 10 10 1

1 1

1 1

1 AEOD/DOA R~Q OEAB REG FILE 01 1

1 1

1 1

1 EXTERNAL: EGGG BRYCEiJ.H NSIC 1

1 1

1 NRC PDR 1

1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT TIIE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T HEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL 24

I

)l

'V P l t"

T F

P t

WASHINGTONPUBLIC POWER SUPPLY SYSTEM P.O. Box968 ~ 3000 George Washington Way ~ Rtcbland, 1Wasblngton 99352C96'8

~ (509) 372-5000 Docket.No. 50-397 G02-93-084 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Dear Sir:

Subject:

NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT MARCH, 1993 Transmitted herewith is the Monthly Operating Report for the month ofMarch, 1993 as required by our Technical Specifications 6.9.1.6.

Very truly yours, W. Baker

-2 Plant Manager (MD 927M)

LBH/hh CC:

Mr. W. H. Lovelace, NRC, Washington, DC Mr. J. B. Martin, NRC Region V Ms. Dottie Sherman, ANI, Farmington, CT Mr. R. C. Barr, NRC Resident Inspector (901A)

Mr. J. T. Wheelock, INPO Mr. F. Yost, UtilityData Institute 9304150139 930331 j ',PDJR ",'DOCK 05000397 8',",DR

p f

a) 1 P

< g"q ~

k II I

',=1)VC'J ss hc'Pf y

~

I IE I

tp "p t

II

'l P

g g

i

~ ~ '

il uBOOBI

OPERATING DATAREPORT WNP-2 DATE:

Apri1 1, 1993 DOCKET: 50-397 2.

REPORTING PERIOD:

Mar-93 OUTAGE + ON-LINEHOURS:

744 3.

4.

5.

6.

7."

8.

Leonard Hutchison (509) 377-2486 UTILITYCONTACT:

LICENSED THERMALPOWER (MWt):

NAMEPLATERATING (GROSS MWe):

DESIGN ELECTRICALRATING (NET MWe):

MAXIMUMDEPENDABLE CAPAClTY (GROSS MWe):

MAXIMUMDEPENDABLE CAPACITY (NET MWe):

3323 1200,9 1120 1165 1112 IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:

NONE 10.

POWER TO WHICH RESTRICTED, IF ANY (NET MWe);

.5 o 12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

TRIP DECLARED IN PERABLE YEAR 2,160.0 1,712.3 0.0 1,622.3 0.0 5,098,946 1,772,000 1,682,832 75.1%

75.1%

70.1%

69.6%

19.5%

392.5 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, DURATION:

REFUELIN UTAGE R8 S HEDULED FOR APRIL 30 1 9 FOR 45 DAYS.

CUMULATIVE 72,728.2 50,860.9 340.4 48,930.0 381.7 142,263,596 47,621,090 45,633,251 67.3%

67.8%

57.4%

57.0%

13.5%

7,665.8 MONTH 744.0 744.0 0.0 744.0 0.0 2,430,333 847,530 808,855 100.0%

100.0%

97.8%

97.1%

0.0%

0.0 REPORT PERIOD HOURS HOURS REACTOR CRITICAL RX RESERVE SHUTDOWN HOURS HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMALENERGY (MWH)

GROSS ELECTRICALENERGY (MWH)

NET ELECTRICALENERGY (MWH)

UNIT SERVICE FACTOR UNIT AVAILABILITYFACTOR UNIT CAPACITYFACTOR (MDC NET)

UNIT CAPACITYFACTOR (DER NET)

UNIT FORCED OUTAGE RATE FORCED OUTAGE HOURS REASONS FOR RESTRICTIONS, IF ANY:

ADMINITRATIVELYSET LIMIT N THE MAXI MFRA TIONLIMITIN RITI ALP WER RATI T o D E T E

-RPT 27.

IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

, ~

U L'

's II I

pe t

'I A

~

I II

~

t J

DOCKET NO.:

50-397 UNITNAME:

WNP-2 DATE:

APRIL 9, 1993

$4 COMPLETED BY:

LB HUTCHISONT=

TELEPHONE:

(509) 377-24$

UNIT SFHJTDOWNS / REDUCTIONS REPORT PERIOD: MARCH, 1993 NO.

DATE TYPE HOURS REASON METHOD LER NO SYSTEM COMPONENT CAUSE &CORRECTIVE ACTION TO PREVENT RECURRENCE NONE

SUMMARY

WNP-2 operated near fullpower during March with no outages or significant power reductions.

TYPE F-FORCED S-SCHED REASON A-EQUIP FAILURE B-MAINTOR TEST C-REFUELING D-REGULATORYRESTRICTION E-OPERATOR TRAINING&

LICENSE EXAM F-ADMIN G-OPER ERROR H-OTHER METHOD 1-MANUAL 2-MANUALSCRAM 3-AUTO SCRAM 4-CONTINUED 5-REDUCED LOAD 9-OTHER SYSTEM &COMPONENT EXHIBITF &H INSTRUCTIONS FOR PREPARATION OF DATAENTRY SHEET LICENSEE EVENT REPORT (LER) FILE (NUREG %161)

P tl

i

~ EA A

RAGE DAILYUNITPOWER L EL MONTH:

MARCH, 1993 DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-397 WNP-2 MARCH, 1993 LB HUTCHISON (509) 377-2486 DAYAVERAGEDAILYPOWER LEVEL (MWe-NET)

DAYAVERAGE DAILYPOWER LEVEL (MWe-NET) 1108 17.

1105 1108 18.

1100 1109 19.

1097 1094 20.

1101 1050 21.

1099 1082 22.

1095 1090 23.

1090 1089 24.

1097 10.

1046 1002 1096 1094 12.

13.

14.

15.

16.

1063 1084 1101 1097 1094 1107 27.

28.

29.

30.

31.

1073 1093 1088 1085 1068 INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILYUNIT POWER LEVEL IN MWe-NET FOR EACH DAY IN THE REPORTING MONTH. COMPUTE TO THE NEAREST WHOLE MEGAWATT.

THESE FIGURES WILLBE USED TO PLOT A GRAPH FOR EACH REPORTING MONTH. NOTE THAT WHEN MAXIMUMDEPENDABLECAPACITYIS USED FOR THE NET ELECTRICALRATINGOF THE UNIT,THRE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER LEVEL EXCEEDS THE 100% LINE (OR THE RESTRICTED POWER LEVELLINE). IN SUCH CASES, THE AVERAGEDAILYUNITPOWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAINTHE APPARENT ANOMALY.

0 l

K I

'~ ~

~

'1 r