~p,g RECT (4
Pp.0 Cy
++*++
UNITED STATES NUCLEAR REGULATORYCOMMISSION REGION V 1450 MARIALANE WALNUTCREEK, CALIFORNIA94596-5368 October 5, 1992 NOTICE OF SIGNIFICANT OPEN MEETING Name of Licensee:
Name of Facility:
Docket Number:
Washington Public Power Supply System Washington Nuclear Project No.
2 (WNP-2) 50-397 Date and Time of Meeting:
Location of Meeting:
Purpose of Meeting:
NRC Attendees:
Licensee Attendees:
October 15, 1992, 8:30 a.m.
(Meeting previously scheduled for October 6, 1992)
Region V Office, Walnut Creek, California Meeting to Discuss the 1992 WNP-2 Refueling Outage and Current Plant Operations Issues J.
B. Martin, Regional Administrator, Region V
K.
E. Perkins, Director, Division of Reactor Safety and Projects S.
A. Richards, Deputy Director, Division of Reactor Safety and Projects L. F. Hiller, Chief, Reactor Safety Branch P.
H. Johnson, Chief, Reactor Projects Section 1
J.
H. Reese, Chief, Radiological Protection Branch J.
W. Clifford, NRR Project Manager W.
P.
Ang, Acting Senior Resident Inspector D. L. Proulx, Resident Inspector D.
E. Corporandy, Project Inspector A. L. Oxsen, Deputy Managing Director J.
V. Parrish, Assistant Managing Director for Operations J.
C. Gearhart, Director, guality Assurance J.
W. Baker, WNP-2 Plant Manager D. J. Pisarcik,
- Manager, Health Physics R.
L. Koenigs,
- Manager, Design Engineering R. L. Webring, Plant Technical Manager D. S.
Feldman, Assistant Maintenance Manager J.
E. Wyrick, Outage Manager G.
C. Sorensen, Regulatory Programs Manager 9211020035 921005 PDR
- DOCK 05000397 P
PDR Note:
Attendance at this meeting by individuals other than those listed above should be made known by October 12, 4:00 p.m. via a telephone call to Phil pc<<
1t I
II 1
l 4
1
Note:
Attendance at this meeting by individuals other than those listed above should be made known by October 12, 4:00 p.m. via a telephone call to Phil
- Johnson, (510) 975-0300.
Approved:
K.
E. Perkins, Director Division of Reactor Safety and Projects Distribution:
J.
- Roe, NRR J. Partlow, NRR Regional Coordinator RV, OEDO M. Virgilio, NRR T. quay, NRR L. Plisco, NRR/LPEB G. Cook, RV D. Kunihiro, RV NRC Attendees Listed Above CC:
A. L. Oxsen, WPPSS G.
C. Sorensen, WPPSS J
~
C. Gearhart, WPPSS J.
W. Baker, WPPSS A. G. Hosier, WPPSS Winston
& Strawn G.
E. Doupe, Esq.
State of Washington
]
I il)t li t
bcc:
Docket Files Project Inspector H. Smith J.
Bianchi J. Zollicoffer REPGP v
~
~P P johnston Moibaon SRighards KPeykins yP/5 /92 (8/$ /92 14k/5 /92 i8/5 /92
~US
- COP, QU S
COPY g
S COP S
COP YES NO YES 'O YES NO YES NO 0
OR YES NO
I I