ML17289A931

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-397/92-29 on Stated Date.No Violations Noted
ML17289A931
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/29/1992
From: Pate R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17289A932 List:
References
NUDOCS 9210230005
Download: ML17289A931 (6)


See also: IR 05000397/1992029

Text

~

~

CPS REGS

0

Wp

~p Oq

00

e

+i),

+

0

+>>*<<"

UNITED STATES

NUCLEAR REGULATORYCOMMISSION

REGION V

1450 MARIALANE

WALNUTCREEK, CALIFORNIA94596-5368

O'Ep z 8 ~gyp

Docket No. 50-397

Washington Public Power Supply System

P.O.

Box 968

3000 George

Washington

Way

Richland,

Washington

99352

Attention:

Hr .

G.

C. Sorensen,

Hanager

Regulatory

Programs

SUBJECT:

NRC

INSPECTION

This letter refers to the inspection

conducted

by Mr. A. Hcgueen of this

office on August 31 - September

4,

1992, of activities authorized

by

NRC

License

No. NPF-21, at the Washington Nuclear Project, Unit 2.

It also refers

to the discussion of our preliminary inspection findings held by the inspector

with yourself and other members of your staff identified in the enclosed

inspection report

on September

4,

1992.

Further, this letter refers to the

subsequent

meeting

conducted

at Region

V on September

8,

1992, at your request

to discuss

Supply System

Emergency

Preparedness

issues

and initiatives.

Areas

examined during this inspection

included activities related to emergency

preparedness

as described

in the enclosed

inspection report.

Within these

areas,

the .inspection consisted

of selective

examination of procedures

and

representative

records,

interviews with facility and contract personnel,

and

observations

of activities in progress.

I

No violations of NRC requirements

were identified within the scope of this

inspection.

~ In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

9210230005

920929

PDR

ADQCK 05000397

8

-

,

PDR

-

I

II

-

Should you have

any questions

concerning this letter,

we will be glad to

discuss

them with you.

Sincerely,

ober

J.

ate, Chief

Safeguards,

Emergency

Preparedness

and

Non-Power Reactor

Branch

Enclosure:

Inspection

Report

No. 50-397/92-29

cc w/enclosure:

J.

W. Baker,

WNP-2 Plant Manager

A. G. Hosier,

WNP-2 Licensing Manager

J.

C. Gearhart,

Director, guality.Assurance

G.

E. Doupe,

Esq.,

WPPSS

J.

V. Parrish,

Assistant

Managing Director for Operations

A. Lee Oxsen,

Deputy Managing Director

= State of Washington

~

~

~

M. H. Philips, Esq., Attorney

Terry Strong,

DOH

R. Donovan,

FEMA,

RX

-

li,

II

h

fj'

-

bcc w/enclosure

Docket File

Resident

Inspector

Project Inspector

G. Cook.

B. Faulkenberry

J. Hartin

bcc w/o enclosures:

M. Smith

J. Zollicoffer

Regi

/ann

AHc ueen

9//Q/92

RPate gg

9/2f/92

S

YES

NO

0

YES

NO

0

YES

NO

r'