Forwards Insp Rept 50-397/92-28 on 920713-0823 & Notice of Violation
ML17289A903
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/18/1992
From: Richards S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17289A904 List:
References
NUDOCS 9210090040
Download: ML17289A903 (6)


See also: IR 05000397/1992028

Text

R<eo~

0

Cy

IIA

O~

~>>*+~

UNITED STATES

NUCLEAR REGULATORYCOMMISSION

REGION V

1450 MARIALANE

WALNUTCREEK. CALIFORNIA94596-5368

'eptember

18,

1992

Docket No.

50-397

Washington Public Power Supply System

P. 0.

Box 968

Richland,

Washington

99352

Attention:

Mr. G.

C. Sorensen

Hanager,

Regulatory

Programs

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC

INSPECTION

REPORT

NO. 50-397/92-28)

This refers to the inspection

conducted

by Messrs.

R.

C. Sorensen

and

D. L. Proulx of this office on July

13 through August 23,

1992 of activities

authorized

by

NRC Operating

License

No. NPF-21,

and to the discussions

of

findings held by the inspectors

with Hr. J.

Baker and other members of the

Supply System staff at the conclusion of the inspection.

Areas

examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examina-

tions of procedures

and representative

records,

interviews with personnel,

and

observations

by the inspectors.

Based

on the results of this inspection, it appears

that certain of your

activities were not conducted

in full compliance with NRC requirements,

as set

forth in the enclosed

Notice of Violation (Notice).

This violation indicates

a weakness

in your ability to maintain proper posting for radiation areas.

Paragraph

4 of the enclosed

report discusses

your actions in response

to two

reactor

scrams

which resulted

from failures of safety/relief valve 3B.

While

we were concerned

that your cause

assessment

following the first failure was

not sufficiently thorough,

we wish to recognize

the extensive

root cause

assessment,

confirmatory testing,

and corrective actions which you undertook

following the

second

reactor

scram

on July 11,

1992.

You are required to respond to this letter and should follow the instructions

specified in the enclosed

Notice when preparing your response.

In your

=

response,

you should

document the specific actions taken

and

any additional

actions

you plan to prevent recurrence.

After reviewing your response

to this

- Notice, including your proposed corrective actions

and the results of future

inspections,

the

NRC will determine

whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

92100'70040

920918

PDR

ADOCK,05000397

PDR

0

/)

I

In accordance

with 10 CFR 2.790(a),

a copy of this letter,

the enclosure,

and

your response will be placed in the

NRC Public Document

Room.

The response

directed

by this letter

and the accompanying

Notice are not

subject to the'learance

procedures

of the Office of Management

and Budget

as

required

by the Paperwork Reduction Act of 1980,

Pub.

L.96-511.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

S.

A. Richards,

Chief

Reactor

Projects

Branch

Enclosures:

1.

Notice of Violation

2.

Inspection

Report

No, 50-397/92-28

cc:

A. L. Oxsen,

Acting Managing Director

J.

V. Parrish,

Assistant

Managing Director for Operations

J.

C. Gearhart,

guality Assurance

Director

J., W. Baker,

WNP-2 Plant Manager

A.

G. Hosier,

WNP-2 Licensing Manager

G.

E. Doupe,

Esq.

Winston

& Strawn

State of Washington

gPP.I.8

1S92

bcc w/copy of enclosures

I and 2:

Docket File

Project Inspector

Resident

Inspector

B. Faulkenberry

J. Hartin

R. Huey

P. Johnson

R. Assa,

NRR

G.

Cook

bcc w/enclosure

I only:

H. Smith

J. Bianchi

J. Zollicoffer

REGI

N V

C

t.d'or

sen

X

~9/I( /92

~/I4/92

s'n

9//k

2

Huey

9/~7/92

SRichards

9/g /92

REQUEST

Y

KST COPY

ST

COPY

YES

NO

S

)

NO

ES

NO

EST

COPY

ES

NO

ST

COPY

YES

NO

TO

PDR

YES

NO

f

I

, l