ML17289A886
| ML17289A886 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 09/25/1992 |
| From: | Perkins K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| NUDOCS 9210060023 | |
| Download: ML17289A886 (5) | |
Text
~~S REG(g (4
~c 4V OO
- .. g 4
/p +**++
UNITED STATES NUCLEAR REGULATORYCOMMISSION REGION V 1450 MARIALANE WALNUTCREEK, CALIFORNIA94596-5368 SKP 3s
>+<
NOTICE OF SIGNIFICANT OPEN MEETING Name of Licensee:
Name of Facility:
Docket Number:
Washington Public Power Supply System Washington Nuclear Project No.
2 (WNP-2) 50-397 Date and Time of Meeting:
Location of Meeting:
Purpose of Meeting:
NRC Attendees:
October 6,
- 1992, 8:30 a.m.
Region V Office, Walnut Creek, California Meeting to Discuss the 1992 WNP-2 Refueling Outage and Current Plant Operations Issues K. E. Perkins, Director, Division of Reactor Safety and Projects S. A. Richards, Deputy Director, Division of Reactor Safety and Projects L. F. Hiller, Chief, Reactor Safety Branch P.
H. Johnson, Chief, Reactor Projects Section 1
J.
H. Reese, Chief, Radiological Protection Branch J.
W. Clifford, NRR Project Hanager W. P. Ang, Acting Senior Resident Inspector Licensee Attendees:
A. L. Oxsen, Deputy Managing Director J.
V. Parrish, Assistant Managing Director for Operations J.
W. Baker, WNP-2 Plant Manager J.
C. Gearhart, Director, guality Assurance D. J. Pisarcik,
- Manager, Health Physics C.
M. Powers, Director, Engineering R. Webring, Plant Technical Manager D. S. Assistant Maintenance Manager J.
E. Wyrick, Outage Manager G.
C. Sorensen, Regulatory Programs Manager 9210060023 920925 PDR ADOCK 05000397 P
tr I
Note:
Attendance at this meeting by individuals other than those listed above should be made known by October 2, 4:00 p.m. via a telephone call to Phil
- Johnson, (510) 975-0300.
Approved:
K. E. Perkins, Director Division of Reactor Safety and Projects Distribution:
J. Sniezek, EDO T. Hurley, NRR W. Russell, NRR B. Boger, NRR J. Partlow; NRR Regional Coordinator RV, OEDO H. Virgi1 i o, NRR T. quay, NRR L. Plisco, NRR/LPEB G. Cook, RV D. Kunihiro, RV NRC Attendees Listed Above CC:
A. L. Oxsen, WPPSS J.
C. Gearhart, WPPSS J.
W. Baker, WPPSS A. G. Hosier, WPPSS Winston
& Strawn G.
E. Doupe, Esq.
State of Washington
1 fl I
I f
t l
t lt f'
l t
bcc:
Docket Files Project Inspector H. Smith J.
Bianchi J. Zollicoffer REGION V
KJ ston PJo n
SRighards KPer)<ins 9/H'/92 9
/
2 9/%~/92 9++92 EST COPY EST COPY EST COPY REQUEST COPY YES NO