ML17289A464

From kanterella
Jump to navigation Jump to search
Amend 101 to License NPF-21,revising TS 6.2.2 to Require Either OM or Assistant OM to Hold Current SRO License
ML17289A464
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/06/1992
From: Gagliardo J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17289A465 List:
References
NUDOCS 9204150157
Download: ML17289A464 (8)


Text

~S REgII, (4

P0 Cy 0

C O

I C

CO Cy

(%

Cy

++*++

UNITEDSTATES NUCLEAR REGULATORY COMMISStON WASHINGTON, D. C. 20555 WASHINGTON PUBLIC POWER SUPPLY SYSTEM DOCKET NO. 50-397 NUCLEAR PROJECT NO.

2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 1pi License No.

NPF-21 The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by the Washington Public Power Supply System (licensee) dated January 23,

1991, and supplemented by letter dated November 29,
1991, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2 ~

Accordingly, the license is amended by changes to the Technical Speci-fications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No.

NPF-21 is hereby amended to read as follows:

\\ E

~ k r

~

9204150i57 920406 PDR ADOCK 05000397 p

Hc

~

~

(g V

JI. J. ~ '.'3'C' e J>>

H.

C I

I "HH I-I

~

~,!

~ I

~

11 I

1 I

~4

~ I HCI

~

~

Cp

\\

~

~

I

~ 1 C hC C

C OH,'l "1

'I H

HA%/J 2 ~

1 I.,I I

~ >>

~

4 ~ 1

/1 ~"

~ IC 1

OCh+

4 V3 4

~

I

(2) Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.

101 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This amendment is effective as of the date of issuance and must be fully implemented within 30 days of the date of issuance.

F T

NUCLEAR REGULATORY COMMISSION

Attachment:

Changes to the Technical Specifications Date of Issuance:

April 6, 1992 J

mes Ga liardo, Acting Director P

je Directorate V

Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation

I

\\

~

y p

~

Ww P

~

ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO. "Di TO FACILITY OPERATING LICENSE NO.

NPF-21 DOCKET NO. 50-397 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages.

The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.

The corresponding overleaf pages are also provided to maintain document completeness.

REMOVE INSERT 6-3 6-3

t 1

JA4 t

C' q

gp> ~

+4 1

E J

r

~

ADMINISTRATIVE CONTROLS A

UNIT STAFF (continued) 4.

Except during extended shutdown periods, the use of overtime should be considered on an individual basis and not for the entire staff on a shift.

Any deviation from the above guidelines shall be authorized by the Plant Manager or his deputy, or higher levels of management, in accordance with established procedures and with documentation of the basis for granting the deviation.

Controls shall be included in the procedures such that individual overtime shall be reviewed month'ly by the Plant Manager or his designee to assure that excessive hours have not been assigned.

Routine deviation from the above guidelines is not authorized.

f.

The Shift Managers and Control Room Supervisors-shall hold a senior reactor operator license.

In addition, the Operations Manager or the Assistant Operations Manager shall also hold a senior reactor operator license.

The Reactor Operators shall hold either a senior reactor operator license or a reactor operator license.

WASHINGTON NUCLEAR - UNIT 2 6-3 Amendment No. 81, 101

THIS PAGE INTENTIONALLYBLANK J

~

~

WASHINGTON NUCLEAR - UNIT 2 6-4 Amendment No. 63