Forwards Insp Rept 50-397/92-03 on 920124-0308 & Notice of Violation
ML17289A456
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/30/1992
From: Richards S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17289A457 List:
References
NUDOCS 9204140009
Download: ML17289A456 (4)


See also: IR 05000397/1992003

Text

~y,g IlKCy

~C

Vp

+

0

Cy

i~

n

C

O

0

4p

0

kp*y4

UNITED STATES

NUCLEAR REGULATORYCOMMISSION

REGION V

1450 MARIALANE

WALNUTCREEK, CAUFORNIAS4596-5368

MAR 30

<992

.Docket No.

50-397

Washington Public Power Supply System

P. 0.

Box 968

Richland,

Washington

99352

Attention:

Mr. G.

C. Sorensen

Manager, .Regulatory

Programs

Subject:

NRC Inspection

Report

No. 50-397/92-03

This refers to the inspection

conducted

by Messrs.

R.

C. Sorensen

and

D. L. Proulx of this office on January

24

March 8,

1992 of activities

authorized

by NRC Operating

License

No. NPF-21,

and to the discussion of

findings held by the inspectors

with Mr. J.

Baker and other members of the

Supply System's staff at the conclusion of the inspection.

Areas examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted

of selective

examinations of procedures

and representative

records,

interviews with

personnel

and observations

by the inspectors.

Based

on the results of this inspection, it appears

that certain of your

activities were not conducted

in full compliance with NRC requirements,

as set

forth in the enclosed

Notice of Violation (Notice).

These violations involved

a weakness

in your safety evaluation -for a test to be performed

on the

containment

atmospheric

control system,

and the failure of your staff to

operate

the control rod drive system in accordance

with the Technical.

Specifications

(TS).

The violation concerning

the special test of the containment

atmospheric

control

(CAC) system involved approval

by the Plant Operations

Committee

(POC)

of the performance of a special test which would have violated the require-

ments of your Technical Specifications.

Furthermore,

members of your staff

indicated that the test would have

been performed

had it not been questioned

by the

NRC resident

inspector.

This issue indicates that the safety evalua-

tion for this test

was too narrowly focused

on operability of the

CAC system,

without adequate

consideration of its possible

impact on other safety

features.

Citation of this violation in the enclosed

Notice is intended to

emphasize

the NRC's expectation that

POC reviews appropriately

address

such

concerns.

Although your staff identified the

TS violation concerning

improper operation

of the control rod drive system, it is being cited because

other criteria for

a non-cited violation,

as stated

in paragraph

V.G. 1 of 10 CFR Part 2, Appen-

dix C, were not satisfied.

In particular,

a Problem Evaluation

Request

(PER)

9204140009

920330

PDR

ADOCK 05000397

8

PDR

j.I=pl

was not initiated

as required to provide for appropriate corrective actions

and assessment

of reportability,

and the issue

would likely not have

been

reported without the inspector's

intervention.

You, are required to respond to this letter and should .follow the instructions

specified in the enclosed

Notice when preparing your response.

In your-

response,

you should document the specific actions taken

and any additional

actions you plan to prevent recurrence.

After reviewing your response

to this

Notice, including your proposed corrective actions

and the results of future

inspections,

the

NRC will determine whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

In accordance

with 10 CFR 2.790(a),

a copy of this letter, the enclosure,

and

your response will be placed in the

NRC Public Document

Room.

The response

directed

by this letter and the accompanying

Notice are not

subject to the clearance

procedures

of the Office of Management

and Budget

as

required

by the Paperwork Reduction Act of 1980,

PL 96-511.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

S. A. Richards,

Chief

Reactor Projects

Branch

Enclosures:

1.

Notice of Violation

2.

Inspection

Report

No. 50-397/92-03

cc:

A. L. Oxsen,

Deputy Managing Director

J.

V. Parrish,

Assistant

Managing Director for Operations

L. L. Grumme, Acting Director, Licensing

and Assurance

J.

W. Baker,

WNP-2 Plant Manager

A.

G. Hosier,

WNP-2 Licensing Manager

G.

E. Doupe,

Esq.

Winston

h Strawn

State of Washington

1

l

1

bcc w/copy of enclosures

I and 2:

Docket File

Project Inspector

Resident

Inspector

B. Faulkenberry

J. Hartin

R.

Huey

P. Johnson

W. Dean,

NRR

G.

Cook

bcc w/enclosure I only:

H. Smith

J. Bianchi

J. Zollicoffer

YES

NO

Q

S

ES

NO

REGION

V

~~,. ~ski,

3/Zk/9.2

3/Z4/92

P

h

on

3/26'92

RHuey

3/21/92

Q

S

OP

C

ES

NO

YES

NO

SRichards

3/5o/92

S

YES

NO

0

PD

YES

NO