Forwards Insp Rept 50-397/92-05 on Stated Dates.No Violations Noted
ML17289A446
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/23/1992
From: Reese J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17289A447 List:
References
NUDOCS 9204100209
Download: ML17289A446 (6)


See also: IR 05000397/1992005

Text

1

4 yS REGy

(W~

+4

0

Cy

i~

00

IIA

O

/p +>>*<<+

Docket No.

50-.397

uNITED STATES

NUCLEAR REGULATORYCOMMISSION

REGION V

1450 MARIALANE

WALNUTCREEK, CAUFORNIA94596-5368

MAR 2 3 1992

Mashington Public Power Supply System

P.O.

Box 968

3000 George Mashington

May

Richland, Mashington

99352

Attention:

Mr.

G.

C.

Sorensen

Manager,

Regulatory'rograms

SUBJECT:

NRC INSPECTION

This letter refers to the inspection

conducted

by Mr. A. Mcgueen of this office

on February 24-28,

1992, of activities authorized

by

NRC License

No.

NPF-21, at

the Mashington Nuclear Project, Unit 2. It also refers to the discussion

of

our prelim>nary inspection findings held by the inspector with yourself and

other members of your staff identified in the enclosed

inspection report

on

February 28,

1992.

Further, this letter refers to subsequent

in-office

inspection of site emergency

plan implementing procedures

(EPIP)

and the

telephone

discussion

between

A. Mcgueen of this office and

D.

Larson of your

staff on March 6,

1992.

Areas

examined during this inspection

included activities related to emergency

preparedness

as described

in the enclosed

inspection report.

Mithin these

areas,

the inspection consisted

of selective

examination 'of procedures

and

representative

records,

inter'views with facility and contract personnel,

and

observations

of activities in progress.

No violations of NRC requirements

were identified within the scope of this

inspection.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

we will be glad to

discuss

them with you.

Si

erely

Enclosure:

Inspection

Report

No. 50-397/92-05

Ja

.

ese,

af

uards,

Emergency

Preparedness

and

Non-Power Reactor

Branch

920410020'P

920323

PDR.

ADOCK 05000397

8

PDR

~pO<

II

I

cc w/enclosure:

J.

M. Baker,

MNP-2 Plant Manager

A.

G. Hosier,

MNP-2 Licensing Manager

L.

L.

Grumme, Acting Director, Assurance

8 Licensing

G.

E.

Doupe,

Esq.,

MPPSS

A.

Lee Oxsen,

Deputy Managing Director

State of

Mashington'.

H. Philips, Esq., Attorney

R.

Donovan,

FEMA,

RX

0

I',

bcc w/enclosure

docket file

B. Faulkenberry-

J. Hartin

G.

Cook

Project Inspector

Resident

Inspector

Terry Strong,

DOH

bcc w/o enclosure:

H. Smith

J. Zollicoffer

Region V/kjh

A.

Hc ueen

3/ i

92

J

eese

/92

fi

III