GO2-91-153, Forwards Rev 7 to Washington Nuclear Plant 2 Licensed Operator Requalification Program Corrective Action Plan, Per NRC Request at 910802 Exit Meeting

From kanterella
(Redirected from ML17286B006)
Jump to navigation Jump to search
Forwards Rev 7 to Washington Nuclear Plant 2 Licensed Operator Requalification Program Corrective Action Plan, Per NRC Request at 910802 Exit Meeting
ML17286B006
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/16/1991
From: Oxsen A
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML17286B007 List:
References
GO2-91-153, NUDOCS 9108260002
Download: ML17286B006 (2)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM e

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9108260002 DOC.DATE: 91/08/16 NOTARIZED: NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION OXSEN,A.L.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION MARTIN,J.B.

Region 5 (Post 820201)

SUBJECT:

Forwards Rev 7 to "Washington Nuclear Plant 2 Licensed Operator Requalification Program Corrective Action Plan,"

per NRC request at 910802 exit meeting.

DISTRIBUTION CODE:

M003D COPIES RECEIVED:LTR J ENCL J SIZE:

TITLE: Operator Requalification Program NOTES:

DOCKET 05000397 D

S RECIPIENT ID CODE/NAME PD5 LA ENG, P. L.

INTERNAL: ACRS ERR/DLPQ/LHFB11 EXTERNAL: NRC PDR COPIES LTTR ENCL 1

0 1

1 6

6 1

1 1

.1 1

1 RECIPIENT ID.CODE/NAME PD5 PD AEOD/DOA NRR/DLPQ/LOLB10 RGN5 l-NSIC COPIES LTTR ENCL 1

1 1

. 1 1

1 1

1 1

1 D

D D

NOTE TO ALL"RIDS" RECIPIENTS:

D PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELliv!INATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 16 ENCL 15

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968

~ 3000 George Washington Way

~ Richland, Washington 99352 August 16, 1991 G02-91-153 Docket No. 50-397 Mr. J.B. Martin, Administrator U.S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, Ca. 94596

Dear Mr. Martin:

Subject:

NUCLEAR PLANT NO. 2, OPERATING LICENSE NPF-21 LICENSED OPERATOR REQUALIFICATIONPROGRAM CORRECTIVE ACTIONPLAN.

During the NRC exit meeting held at WNP-2 on Friday, August 2, 1991, Mr. L.F. Millerof your staff requested that the latest revision of the WNP-2 Licensed Operator Requalification

~ Program Corrective Action Plan be submitted to your office. A copy of the latest Plan revision (Rev. 7) is attached for your review.

As discussed with Mr. Miller, the Plan is a "living" document and thus, this does not necessarily represent the final version of the Plan.

The Plan contains short term, intermediate term and long term actions which the Supply System considers necessary to correct identified problems with the requalification program.

Short term actions represent those items which we have deemed necessary to complete prior to plant restart from the current outage.

An earlier revision of the Plan was shared with you and your staff at the July 2, 1991 management meeting in your offices.

We believe that the current revision incorporates your input at that meeting and subsequent discussions with members of your staff and thus also represents those actions which the NRC considers restart issues.

Intermediate and long term actions will be completed after restart on the schedule indicated.

Should you have any questions on this material, please contact me.

Very truly yours,-

A. L. Oxsen, Deputy Managing Director cc:

PL Eng/NRC LF Miller/NRC Document Control Desk/NRC 9l0826000=" 9l08l6 PDFl ADOCK 05000397 V

PDR NS Reynolds/Winston Ec Strawn DL Williams/BPA/399 NRC Site Inspector/901A