Confirms Discussion on 910513 Between L Miller & J Sorensen of Util Re Mgt Meeting to Be Held Between NRC & Util at Region V Ofc
ML17286A762
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/13/1991
From: Perkins K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Oxsen A
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 9105210094
Download: ML17286A762 (10)


Text

~yg IlEQII (4

P I +

c I

IVl O

4y o

Cy

+>>*<<~

Docket No. 50-397 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V 1450 MARIALANE,SUITE 210 WALNUTCREEK, CALIFORNIA94596

/AY i 3 1991 Washington Public Power Supply System P.

O. Box 968 Richland, Washington 99352 Attention:

Mr. A. L. Oxsen Deputy Managing Director Gentlemen:

Subject,:

Management Meeting This will confirm the discussion on May 13, 1991 between Mr.

L. Miller of this office and Mr. J.

Sorensen of the Washington Public Power Supply System concerning a management meeting to be held between NRC and Supply System management representatives at the Region V Office in Walnut Creek, California, at 1:00 p.m.

on May 20, 1991.

The purpose of this meeting is to discuss further the root causes of the requalification program failure and an action plan for restart.

A copy of the proposed agenda for this meeting is enclosed.

Also enclosed is a copy of our internal meeting notice which lists the anticipated attendees at this meeting.

Sincerely,

Enclosure:

Copy of Agenda Copy of NRC Meeting Notice K. E. Perkins Jr.,

Deputy Director Division of Reactor Safety and Projects cc:

See next page 91052i0094 9i0513 PDR ADOCK 05000397 P

PDR

MAY > >

>99~

ccrc Mr. M. H. Philips, Esq.

Bishop, Cook, Purcell 6 Reynolds 1200 Seventeenth
Street, N.W.

Washington, DC 20036 Mr. G. E. Doupe, Esq.

Washington Public Power Supply System P.

O.

Box 968 3000 George Washington Way

Richland, Washington 99532 Mr. Curtis Eschels, Chairman Energy Facility Site Evaluation Council Mail Stop PY-11 Olympia, Washington 99504 Dr. G.

D. Bouchey, Director Licensing and Assurance Washington Public Power Supply System P.

O.

Box 968, MD280

Richland, Washington 99352 Mr. J.

W. Baker WNP-2 Plant Manager Washington Public Power Supply System P.

O. Box 968, MD 927M

Richland, Washington 99352

'l

MPy 1

3 109t RE ION V L. Miller.

5//7 /91 Kirscb 5//9/91 bcc (w/en'closure):

PDR Project Inspector Resident Inspector docket file G.

Cook B. Faulkenberry B. Martin M. Smith K Perkin 5/

/91 ST COPY ]

QS ST COPY UES COPY ]

NO YE NO ES NO EPD PDR

]

)

Enclosure 1

MANAGEMENT MEETING WITH WASHINGTON PUBLIC POWER SUPPLY SYSTEM May 20, 1991 1.

Purpose of Meeting -- J. Martin, Regional Administrator

2. Discussion of Root Cause NRC and. Supply System 3.

Discussion of Root Cause'actors Related to Training and Operators NRC and Supply, System 4.

Discussion of Action Plan for Restart NRC and Supply System 5.

Discussion of Schedule for Resolution of Issues (Short, Intermediate, and Long Term) NRC and Supply System 6.

Discussion of Outage Related Issues Not Associated with the Requalification Program NRC and Supply System 7.

Closing Remarks NRC and Supply System

1'ECgg/

Ct 1

~p

+<

o 0

V/

0 Cy

+a*t+

t UNITED STATES t NUCLEAR REGULATORY COMMISSION REGION V 1450 MARIALANE,SUITE 210 WALNUTCREEK, CALIFORNIA94596 MAY i 3'1991 NOTICE OF SIGNIFICANT LICENSEE MEETING Name of Licensee:

Name of Facility:

Docket Number:

Date and Time of Meeting:

Location of Meeting:

Purpose of Meeting:

'NRC Attendees:

Washington Public Power Supply System Washington Nuclear Project No.

2 (WNP-2) 50-397 May 20,

1991, 1:00 p.m.

Region V Office Walnut Creek, California Discuss root cause of re'qualification program 'failure and action plan for restart.

J. Martin, Region V Administrator J.

Dyer, Director, Project Directorate V, NRR R.'immerman, Director, Division of Reactor Safety and Projects, Region V D. F. Kirsch, Chief, Reactor Safety Branch, Region V

L. F. Miller Jr., Chief, Operations

Section, Region V T. Sundsmo,
Examiner, Region V Licensee Attendees:

C. M. Halvorson, Chairman of the Board P. Knight, Board Member, D.

W. Mazur, Managing Director A. L. Oxsen, Deputy Managing Director G.

D. Bouchey, Director, Licensing and Assurance J.

W. Baker, WNP-2 Plant Manager G.

C. Sorensen, Manager of Regulatory Programs D. Schumann, Root Cause Team Leader B. Barmettlor, Nuclear License. Training Manager MAY i 3 190'OTE:

Attendance at this meeting by NRC personnel other than those listed above should be made known by May 17, 1991 via telephone call to D. Kirsch, FTS 448-0290 or (415) 975-0290.

Division of Reactor Safety and Prospects cc (w/copy of licensee letter):

NRC Participants Listed Above B. Paulkenberry, RV J.

M. Taylor, EDO J. H. Sniezek, EDO T. E. Murley, NRR E. L. Jordan, AEOD F. J. Miraglia, Jr.,

NRR G. Holahan, NRR L. J. Chandler, OGC J. L. Caldwell, OEDO G. N. Cook, RV P. Eng, NRR M. J. Virgilio, NRR B. A. Boger, NRR W. Russell, NRR J. Roe, NRR J. Munro, NRR