Forwards Insp Rept 50-397/90-31 on 901203-910113 & Notice of Violation & Deviation
ML17286A596
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/12/1991
From: Zimmerman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Oxsen A
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17286A598 List:
References
NUDOCS 9103010034
Download: ML17286A596 (5)


See also: IR 05000397/1990031

Text

UNITEO STATES

NUCLEAR REGULATORY COIVIIVIISSION

REGION V

1450 MARIALANE,SUITE 210

WALNUTCREEK, CALIFORNIA94596

fEB i R

1SSl

Docket No.

50-397

Washington Public Power Supply System

P. 0.

Box 968

Richland,

Washington

99352

Attention:

Hr. A. L. Oxsen

Deputy Managing Director

Gentlemen:

.Subject:

NRC Inspection

This refers to the inspection

conducted

by Messrs.

R.

C. Sorensen

and

C. 0. Townsend of this office on December 3,

1990 - January

13,

1991 of

activities authorized

by

NRC Operating

License

No. NPF-21,

and to the

discussion of findings held by the inspectors

with, Hr. J.

Baker

and other

members of the Supply System staff at the conclusion of the inspection.

Areas

examined during this inspection

are described

in the enclosed

inspec-

tion report.

Within these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel

and observations

by the inspectors.

Based

on the results of this inspection, it appears

that certain of your

activities were not conducted

in full compliance with NRC requirements,

as

set forth in the Notice of Violation, enclosed

herewith

as Appendix A.

These

violations involved insufficient corrective actions in response

to the

. May 1990 diesel

generator

bearing failure,

and performance of a surveillance

test without establishing

the specific conditions prescribed

by the Technical,

Specifications.

You are required to respond to this letter and should follow the instructions

specified in the enclosed

Notice when preparing your response.

In your

response,

you should document the specific actions taken

and any additional

actions you plan to prevent recurrence.

The violation involving diesel

generator

bearing oil leakage

and monitoring

is of particular concern to us in view of the significant bearing failure and

fire which you experienced

in Hay 1990.

As discussed

in paragraph

4 of the

enclosed

inspection report,

our inspectors

identified

a low bearing oil level

condition associated

with the Division I Emergency Diesel Generator,

which

had existed since the previous

day and

was not corrected for approximately

two days after its initial discovery

by plant personnel.

Further examination

of this issue identified two previous occasions

on which oil was

added after

comparable

delays,

without appropriate tracking of oil additions to monitor

the rate of oil leakage.

Your staff also

had not established

appropriate

910301 0030 910212

PDR

AQDCK 05$9M97

G

PDR

l

t

II

-2-

FEB 12

t99)

acceptance

criteria specifying the minimum bearing oil level required for the

diesel

generator to be considered

operable.

These observations

indicate that

your staff has not responded sufficiently to the lessons

lear'ned

from the Hay

1990 bearing failure and fire, particularly in view of the narrow range of

acceptable

bearing oil level.

In your response

to the above Notice, please

address

the actions you plan to take to effectively resolve this concern.

Based

on the results of this inspection, it also appears

that certain of your

activities did not fully meet'a

commitment

made to the

NRC,

as set forth in

the Notice of Deviation, enclosed

herewith

as Appendix B.

You are requested

to provide,a response to'his Notice, as stated in Appendix B, Notice of

Deviation.

In accordance

with 10 CFR 2.790(a),

a copy of this letter, the enclosures,

'nd your responses

will be placed in the

NRC Public Document

Room.

The responses

directed/r'equested

by this letter and the accompanying

Notices

are not subject to the clearance

procedures

of the Office of Hanagement

and

Budget

as required

by the Paperwork

Reduction Act of 1980,

PL 96-511.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

R.

P.

Eimmerman, Director

Division of Reactor Safety

and Projects

Enclosures:

l.

Appendix A, Notice of Violation

2.

Appendix B, Notice of Deviation

3.

Inspection

Report

No. 50-397/90-31

cc:

G.

C. Sorensen,

Hanager,

Regulatory

Programs

G. D. Bouchey, Director, Licensing

and Assurance

J.

W. Baker,

WNP-2 Plant Hanager

A. G. Hosier,

WNP-2 Licensing Hanager

G.

E. Doupe,

Esq.,

Winston 5 Strawn

State of Washington

14

bcc w/copy of enclosures

l.and 2:

Docket File

Project Inspector

Resident

Inspector

G.

Cook

B. Faulkenberry

J. Hartin

A. Johnson

P. Johnson

J.

Dyer,

NRR

P.

Eng,

NRR

bcc w/enclosure

1 only:

H. Smith

N. Western

LFHB

-3-

FEB

1 R

1993

REGION V

/

r

sen

T

n

d

2/I(/91

2/< </91

UEST

COPY

EST

COPY

YE

NO

ES

NO

PJ

ns

n

2/I 1 /91

EST

COPY

ES

NO

SRichards

KPerkins

2/)~/91

2/(~l

EST

COPY ]

R

EST

COPY

ES

NO

ES

NO

lp ). ii)

Jo nson

2/( Z/91

RZimmerma

2/pal

8 ST

COPY ]

EST

COPY ]

YES

NO

ES

NO

0

TO

PDR

]

YES

NO