ML17286A592
| ML17286A592 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 01/31/1991 |
| From: | John Baker, Hutchison L WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GO2-9-021, GO2-9-21, NUDOCS 9102250013 | |
| Download: ML17286A592 (7) | |
Text
ACCELERATED DI BUTION DEMONSTRATION SYSTEM
~
w'EGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR: 9102250013 DOC. DATE: 91/01/31 NOTARIZED:
NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.B.
Washington Public Power Supply System BAKER,J.W.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000397
SUBJECT:
Monthly operating rept for Jan 1991 for Washington Nuclear Plant Unit 2.W/910205 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR I
ENCL t
SIZE:
TITLE: Monthly Operating Report (per Tech Specks NOTES RECIPIENT ID CODE/NAME PD5 LA ENG,P.L.
INTERNAL: ACRS AEOD/DSP/TPAB NRR D+QQ~L.
0 E
E 0
EXTERNAL EGGG BRYCE iJ
~ H NSIC COPIES LTTR ENCL 3
3 1
1 10 10 1
1 1
1 1
1 1
1 1
1'ECIPIENT ID CODE/NAME PD5 PD AEOD/DOA IRM TECH ADV NRR/DOEA/OEAB RGN5 NRC PDR COPIES LTTR ENCL 1
1 1
1 2
2 1
1 1
1 1
1 Q~ /I/P ii ~Y79 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 26 ENCL 26
WASHINGTONPUBLIC POWER SUPPLY SYSTEM P.O. Bm 96'8 ~ 3000 George Wasbtngron Way ~ Richland, Washington 99352-0968
~ (509) 372-5000 G02-9-021 Docket No. 50-397 February 5, 1991 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Dear Sir:
Subject:
NUCLEAR PLANTNO. 2 MONTHLYOPERATING REPORT JANUARY 1991 Transmitted herewith is the Monthly Operating Report for January 1991 as required by our Technical Specifications 6.9.1.6.
Very truly yours, Zr J.W. Baker WNP-2 Plant Manager (MD 927M)
JWB:LBH:bap Enclosure cc:
Mr. J.B. Martin, NRC Region V Mr. C. Sorensen, NRC Resident Inspector (901A)
Ms. Dottie Sherman, ANI, Farmington CT Mr. J.T. Wheelock, INPO Mr. W.H. Lovelace, NRC, Washington D.C.
9102250013 910131
~ PDR ADOCK 05000397 R
PDR pf Pr
OPERATING DATA REPORT WNP-2 01-Feb-91 1.
DOCKET: 50-397 2.
REPORTING PERXOD:
Jan-91 3.
UTILXTY CONTACT:
OUTAGE + ON-LINE HOURS LEONARD HUTCHISON (509) 377-2486 744 4.
LXCENSED THERMAL POWER (MWt):
5.
NAMEPLATE RATING (GROSS MWe):
6.
DESIGN ELECTRICAL RATXNG (NET MWe):
7.
MAXIMUMDEPENDABLE CAPACITY (GROSS MWe):
8.
MAXIMUM DEPENDABLE CAPACXTY (NET MWe):
9.
IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:
None.
3323 1200.9 1100 1140 1095 1 0 ~
POWER TO WHICH RESTRICTED I IF ANY (NET MWe) 11.
REASONS FOR RESTRICTIONS, IF ANY:
None
~
12.
REPORT PERIOD HOURS 13.
HOURS REACTOR CRITICAL 14.
RX RESERVE SHTDWN HRS 15.
HRS GENERATOR ON LINE 16.
UNIT RESERVE SHUTDOWN HOURS 17.
GROSS THERMAL ENERGY (MWH) 18 'ROSS ELECTRICAL ENERGY (MWH) 19.
NET ELECTRICAL ENERGY (MWH) 20.
UNXT SERVICE FACTOR 21.
UNIT AVAILABILITYFACTOR 22.
UNIT CAPACITY FACTOR (MDC NET) 23.
UNIT CAPACITY FACTOR (DER NET) 24.
UNIT FORCED OUTAGE RATE 25.
FORCED OUTAGE HOURS MONTH 744 744.0 0.0 744.0 0.0 2450660 825840 797521 100.0%
100.0~0 97.9%
97.4%
0.0%
0.0 YEAR CUMULATIVE 744 53768.2 744.0 39728.2 0.0 340.4 744.0 38346.8 0.0 381.7 2450660 108799685 825840 36227480 797521 34825691 100 '+o 71 '~o 100 '~o 72 '+0 97.9~o 59.2~o 97 '~o 58.9>o
- 0. 0>o
- 8. 1>o 0.0 3401.2 26.
SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, DURATION):
Refueling outage (R6) starting 4/13/91 for, 51 days.
- 27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:
DOCKET NO.:
50-397 UNITNAME:
WNP-2 DATE:
FEBRUARY '1, 1991.
COMPLETED BY:
LB HUTCHISON TELEPHONE:
(509) 377-2486
UNIT SHUTDOWNS / REDUCTIONS 0
0 NO.
DATE TYPE HOURS REASON METHOD LER NO SYSTEM COMPONENT CAUSE &CORRECTIVE ACTIONTO PREVENT RECURRENCE None.
gtiMMARV WNP-2 operated routinely during January with no outages or significant power reductions.
TYPE REASON METHOD SYSTEM & COMPONENT F-FORCED S-SCHED A-EQUIP FAILURE B-MAINTOR TEST C-REFUELING D-REGULATORYRESTRICTION E-OPERATOR TRAINING&
LICENSE EXAM F-ADMIN G-OPER ERROR H-OTHER 1-MANUAL 2-MANUALSCRAM 3-AUTO SCRAM 4-CONTINUED 5-REDUCED LOAD 9-OTHER EXHIBITF &H INSTRUCTIONS FOR PREPARATION OF DATAENTRY SHEET LICENSEE EVENT REPORT (LER) FILE (NUREG -0161)
~
~
C C
A RAGE DAILYUNITPOWER LE MONTH:
JANUARY 1991 DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-397 WNP-2 JANUARY 1991 LBHUTCHISON (509) 377-2486 DAYAVERAGE DAILYPOWER LEVEL (MWe-NET)
DAYAVERAGEDAILYPOWER LEVEL (MWe-NET) 1074 17.
1080 2.
1074 18.
1069 3.
1076 19.
1088 4,
1078 20.
1088 5.
1082 21 ~
1084 1082 22.
1086 1079 23.
1084 8.
1081 1079 1079 1083 10.
1079 26.
1079 987 27.
1077 12.
968 28.
1041 13.
1061 29.
1075 14.
1066 30.
1078 15.
1075 31.
1076 16.
1079 INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILYUNIT POWER LEVELIN MWe-NET FOR EACH DAYIN THE REPORTING MONTH. COMPUTE TO THE NEAREST WHOLE MEGAWATT.
THESE FIGURES WILLBE USED TO PLOT A GRAPH FOR EACH REPORTING MONTH. NOTE THATWHEN MAXIMUMDEPENDABLECAPACITYIS USED FOR THE NETELECTRICALRATINGOF THE UNIT,THRE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER LEVEL EXCEEDS THE 1009o LINE (OR THE RESTRICTED POWER LEVELLINE). IN SUCH CASES, THE AVERAGEDAILYUNITPOWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAINTHE APPARENT ANOMALY.
November 19, 1990 DISTRIBUTION:
Wocket File PDV r/f/
DFoster DocKET Nots).50-397 To attached addresses sUBJEOT:
NPPSS NUCLEAR PROJECT UNIT2%-. Environmental Reports 1
The following documents concerning our review of the subject, facility are transmitted for your, information.";,
.'ESCRIPTION OF DOCUMENT Notice of Receipt of Application Draft/Final Environmental Statement
- Notice of Availability of Draft/Final Environmerital Statement
-Safety Evaluation Report, or Supplement No.
- .'ATED
'nvironmental Assessment and Finding of No Significant Impact Notice of Issuance of Environmental Assessment J
J
~
-. = Notice of Consideration of Issuance of Facility.Operating, License-or.Amendment;to Facility Operating License:
Biweekly Notice; Applications and Amendments to Operating Licenses S
p..-
Involvin No Si nifIcant Hazards Conditions.... ~,..."
See Page(sl Exemption Construction Permit No. CPPR-Facility Operating License No.
Order
"~
, Amendment No.
,Amendment No.
~
J XX Monthly Operating Report forAU 8
Se t 5 Revised Au 1990 Annual/Semi. Annual Report:
transmitted by Letter /31/90.
E-transmitted by Letter J'
Oth<<Fort/ards NPDES Waste Dischar e Permit...b State of IIA 900910 0/4/90.
Enclosures:
As Stated Office of Nuclear Reactor Regulation Doris J; Foster, Licensing Asst.
/l Project Directorate Y
Division of Reactor projects III/IY/V CC:
OFFICE>
SUANAMEW LA:PDV Foster:d
'"" ll/l9/90 NAG FOAM 318 (to/80) NACM 0240 OFFICIAL RECORD COPY
ADDRESSES:
Chief Division Ecological Services Bureau of Sport Fisheries and Wildlife U.S. Department of the Interior Washington, D.C.
20240 Dr. William Cunningham FDA Research Chemist National Institute of Standards 5 Technology Reactor Building 235, Room B108 Gaithersburg, Maryland 20899 U.S. Environmental Protection Agency Region X Office Attention:
Regional Radiation Representative 1200 6th Avenue
- Seattle, Washington 98101