Category:Letter
MONTHYEARML24032A4762024-02-0101 February 2024 Final Report of a Part 21 Evaluation Associated with Starter Contactors for the BFN Unit 1 High Pressure Coolant Injection Suppression Pool Inboard Suction Valve ML24023A2802024-01-23023 January 2024 Final Report of a Deviation or Failure to Comply Associated with a Relay in the Reactor Core Isolation Cooling Condensate Pump CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24016A3042024-01-16016 January 2024 Final Report of a Part 21 Evaluation Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472024-01-11011 January 2024 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 ML24022A1732024-01-0303 January 2024 Receipt and Availability of the Subsequent License Renewal Application ML23319A1992024-01-0303 January 2024 Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves ML23355A2062023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23348A3942023-12-14014 December 2023 Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve IR 05000259/20230102023-12-11011 December 2023 Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 ML23335A0722023-12-0101 December 2023 Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump ML23334A2492023-11-30030 November 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan2023-11-29029 November 2023 Submittal of Fifth 10-Year Interval Inservice Testing Program Plan ML23331A2532023-11-27027 November 2023 Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23325A1102023-11-21021 November 2023 Anchor Darling Double Disc Gate Valve Commitment Revision ML23320A2542023-11-16016 November 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump IR 05000259/20230032023-11-13013 November 2023 Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 IR 05000259/20230402023-11-0202 November 2023 Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment Letter ML23292A2532023-10-18018 October 2023 BFN 2024-301, Corporate Notification Letter (210-day Ltr) ML23282A0022023-10-0606 October 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23278A0122023-10-0505 October 2023 Updated Final Safety Analysis Report, Amendment 30 ML23271A1702023-09-28028 September 2023 Site Emergency Plan Implementing Procedure Revision ML23270A0702023-09-26026 September 2023 SLRA Pre-Application Meeting Summary 09-13-2023 ML23257A1232023-09-22022 September 2023 Administrative Changes to Technical Specification Pages Issued for License Amendment Nos. 332, 355, and 315 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23263B1042023-09-20020 September 2023 Special Report 260/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation ML23205A2132023-09-0808 September 2023 Issuance of Amendment Nos. 332, 355, and 315 Regarding the Revision of Technical Specifications to Adopt TSTF-566-A and TSTF-580-A, Rev. 1 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000259/20230052023-08-29029 August 2023 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2023005, 05000260/2023005 and 05000296/2023005 ML23233A0432023-08-18018 August 2023 Enforcement Action EA-22-122 Inspection Readiness Notification ML23219A1542023-08-17017 August 2023 Request to Use Later Edition of ASME Code for Operation and Maintenance and Alternative Requests BFN-IST-01 Through 05 for the Fifth 10-Year Interval Inservice Testing Program ML23228A1642023-08-16016 August 2023 Site Emergency Plan Implementing Procedure Revision ML23228A0202023-08-15015 August 2023 (BFN) Unit 1 - Special Report 259/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation IR 05000259/20230022023-08-10010 August 2023 Integrated Inspection Report 05000259/2023002, 05000260/2023002, 05000296/2023002 and 07200052/2023001 ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills ML23171A8862023-07-24024 July 2023 Issuance of Amend. Nos. 331, 354, and 314; 365 and 359 Regarding Adoption of TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23201A2182023-07-20020 July 2023 Registration of Use of Cask to Store Spent Fuel (MPC-298 and -299) ML23159A2552023-07-20020 July 2023 Proposed Alternative to the Requirements of the ASME Code Regarding Volumetric Inspection of Standby Liquid Control Nozzles ML23199A3072023-07-18018 July 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions IR 05000259/20233012023-07-18018 July 2023 NRC Operator License Examination Report Nos. 05000259/2023301, 05000260/2023301, and 05000296/2023301 2024-02-01
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML23335A0672023-10-31031 October 2023 Updated Final Safety Analysis Report (Fsar), Amendment 30, Public Use Redacted ML23278A0122023-10-0505 October 2023 Updated Final Safety Analysis Report, Amendment 30 ML22049B3242021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Appendix N, Unit 1 Cycle 14 Reload Analysis (July 2020) - Redacted ML21286A5542021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.2, Unacceptable Safety Results for Abnormal Operational Transients ML21286A5582021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section, 14.12 Analysis of the Primary Containment Response ML21286A5402021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.3, Training Programs ML21286A5442021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.4, Preoperational Test Program ML21286A5362021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Table of Contents ML21286A5312021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.9, Refueling Operations ML21286A5502021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.4, Approach to Safety Analysis ML21286A5372021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.8, Analytical Methods ML21286A5482021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.6, Iodine-131 Activity (Ci) by Location as Function of Time for CRDA ML21286A5262021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Figure 13.2, Organization and Responsibility ML21286A5242021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.20, Auxiliary Boiler System ML21286A5292021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.5, Startup and Power Test Program ML21286A5522021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.5, Analyses of Abnormal Operational Transients ML21286A5352021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.8, Analytical Methods, ML21286A5332021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.2, Organization and Responsibility ML21286A5462021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.6, Analysis of Design Basis Accidents ML21286A5672021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.11-1 Through Table 14.11-9 (Deleted) ML21286A5692021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.11 Analyses of Design Basis Accidents (Deleted) ML22049B3192021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Appendix 2.4A, Probable Maximum Flood (PMF) - Redacted ML21286A5652021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Plant Safety Analysis, Table of Contents ML21286A5602021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figures 14.10-1 Through 14.10-20 Deleted by Amendment 28 ML21286A5622021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.8, Fuel Rod and Fuel Bundle Details ML21286A5662021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.13-1, Results of BFN Atwsi Evaluation ML22049B3212021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.6, Instrument and Controls DC and AC Power System - Redacted ML21286A5592021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.9, Deleted ML21286A5552021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.5, Analyses of Abnormal Operational Transients ML21286A5472021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.4, Approach to Safety Analysis ML22049B3222021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.12, Heating, Ventilation, and Air Conditioning Systems - Redacted ML21286A5302021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Figure 13.5, Startup and Power Test Program ML21286A5382021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.10, Refueling Test Program ML22047A1602021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.2, Site Description - Redacted ML21286A5562021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Figure 13.6, Normal Operations ML21286A5392021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.6, Normal Operations ML21286A5222021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.25, Emergency High Pressure Makeup (Ehpm) System ML21286A5232021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.18, Plant Communications System ML21286A5492021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.1, Analytical Objective ML21286A5642021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.10, Deleted ML21286A5682021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.13, Anticipated Transients Without Scram with Instability (Atwsi) ML21286A5532021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Figure 13.4, Typical Preoperational Test Sequence ML21286A5452021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.8, Operational Review and Audits ML21286A5322021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.6, Analysis of Design Basis Accidents ML21286A5422021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.5, Analyses of Abnormal Operational Transients ML21286A5432021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Table 13.5, Startup and Power Test Program ML21286A5342021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.3, Unacceptable Safety Results for Accidents ML21286A5512021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.7, Records (Deleted) ML21286A5272021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Section 13.1, Organizational Structure of the Conduct of Operations ML21286A5282021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.4, Approach to Safety Analysis 2023-10-05
[Table view] |