Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARGO2-99-180, Monthly Operating Rept for Sept 1999 for WNP-2.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for WNP-2.With GO2-99-170, Monthly Operating Rept for Aug 1999 for WNP-2.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for WNP-2.With ML17284A8691999-07-31031 July 1999 Monthly Operating Rept for July 1999 for WNP-2.With 990813 Ltr GO2-99-156, Monthly Operating Rept for July 1999 for WNP-2.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for WNP-2.With GO2-99-124, Monthly Operating Rept for June 1999 for WNP-2.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for WNP-2.With ML17292B7271999-06-30030 June 1999 Monthly Operating Rept for June 1999 for WNP-2.With 990707 Ltr ML17292B6961999-05-31031 May 1999 Monthly Operating Repts for May 1999 for WNP-2.With 990608 Ltr GO2-99-106, Monthly Operating Repts for May 1999 for WNP-2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for WNP-2.With GO2-99-089, Monthly Operating Rept for Apr 1999 for WNP-2.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for WNP-2.With ML17292B6391999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for WNP-2.With 990413 Ltr GO2-99-069, Monthly Operating Rept for Mar 1999 for WNP-2.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for WNP-2.With GO2-99-048, Monthly Operating Rept for Feb 1999 for WNP-2.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for WNP-2.With ML17292B5871999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for WNP-2.With 990311 Ltr GO2-99-028, Monthly Operating Rept for Jan 1999 for WNP-2.With1999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for WNP-2.With ML17292B5571999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for WNP-2.With 990210 Ltr ML17292B5351998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for WNP-2.With 990112 Ltr GO2-99-006, Monthly Operating Rept for Dec 1998 for WNP-2.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for WNP-2.With GO2-98-204, Monthly Operating Rept for Nov 1998 for WNP-2.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for WNP-2.With ML17284A8081998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for WNP-2.With 981110 Ltr GO2-98-188, Monthly Operating Rept for Oct 1998 for WNP-2.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for WNP-2.With GO2-98-174, Monthly Operating Rept for Sept 1998 for WNP-2.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for WNP-2.With GO2-98-166, Monthly Operating Rept for Aug 1998 for WNP-2.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for WNP-2.With GO2-98-144, Monthly Operating Rept for July 1998 for WNP-21998-07-31031 July 1998 Monthly Operating Rept for July 1998 for WNP-2 GO2-98-119, Monthly Operating Rept for June 1998 for WNP-21998-06-30030 June 1998 Monthly Operating Rept for June 1998 for WNP-2 GO2-98-096, Monthly Operating Rept for May 1998 for WNP-21998-05-31031 May 1998 Monthly Operating Rept for May 1998 for WNP-2 GO2-98-083, Monthly Operating Rept for Apr 1998 for WNP-21998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for WNP-2 ML17292B3371998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for WNP-2.W/980409 Ltr GO2-98-069, Monthly Operating Rept for Mar 1998 for WNP-21998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for WNP-2 GO2-98-055, Monthly Operating Rept for Feb 1998 for WNP-21998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for WNP-2 GO2-98-028, Monthly Operating Rept for Jan 1998 for WNP-21998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for WNP-2 ML17292B2471998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for WNP-2.W/980212 Ltr GO2-98-007, Monthly Operating Rept for Dec 1997 for WNP-21997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for WNP-2 GO2-97-220, Monthly Operating Rept for Nov 1997 for WNP-21997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for WNP-2 ML17292B1341997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for WNP-2.W/971205 Ltr GO2-97-205, Monthly Operating Rept for Oct 1997 for WNP-21997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for WNP-2 ML17292B1101997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for WNP-2.W/971111 Ltr ML17292B0851997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for WNP-2.W/971010 Ltr GO2-97-188, Monthly Operating Rept for Sept 1997 for WNP-21997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for WNP-2 ML17292B0511997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for WNP-2 GO2-97-152, Monthly Operating Rept for Jul 1997 for WNP-21997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for WNP-2 ML17292A9611997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for WNP-2.W/970807 Ltr ML17292A9331997-06-30030 June 1997 Monthly Operating Rept for June 1997 for WNP-2.W/970715 Ltr GO2-97-142, Monthly Operating Rept for June 1997 for WNP-21997-06-30030 June 1997 Monthly Operating Rept for June 1997 for WNP-2 ML17292A8971997-05-31031 May 1997 Monthly Operating Rept for May 1997 for WNP-2 ML17292A8531997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for WNP-2 GO2-97-070, Monthly Operating Rept for Mar 1997 for WNP-21997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for WNP-2 ML17292A8561997-03-31031 March 1997 Corrected MOR for Mar 1997 for WNP-2 GO2-97-048, Monthly Operating Rept for Feb 1997 for WNP-21997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for WNP-2 GO2-97-026, Monthly Operating Rept for Jan 1996 for WNP-21997-01-31031 January 1997 Monthly Operating Rept for Jan 1996 for WNP-2 ML17292A7011997-01-31031 January 1997 Monthly Operating Rept for Jan 1996 for WNP-2.W/970212 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17284A9001999-10-31031 October 1999 Rev 0 to COLR 99-15, WNP-2 Cycle 15,COLR GO2-99-177, LER 99-S01-00:on 990903,failure to Take Compensatory Measure within Required Time Upon Failure of Isolation Zone Microwave Unit,Was Noted.Caused by Personnel Error.Provided Refresher Training on Compensatory Measures.With1999-10-0101 October 1999 LER 99-S01-00:on 990903,failure to Take Compensatory Measure within Required Time Upon Failure of Isolation Zone Microwave Unit,Was Noted.Caused by Personnel Error.Provided Refresher Training on Compensatory Measures.With GO2-99-180, Monthly Operating Rept for Sept 1999 for WNP-2.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for WNP-2.With GO2-99-170, Monthly Operating Rept for Aug 1999 for WNP-2.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for WNP-2.With GO2-99-156, Monthly Operating Rept for July 1999 for WNP-2.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for WNP-2.With ML17284A8691999-07-31031 July 1999 Monthly Operating Rept for July 1999 for WNP-2.With 990813 Ltr ML17284A8331999-07-30030 July 1999 Safety Evaluation Supporting Proposed Alternative of Direct or Remote VT-1 Visual Exam of Pump Casing Welds Will Be Capable of Detecting Any Known Degradation in Carbon Steel Welds,Therefore Provides Assurance of Pressure Integrity ML17292B7421999-07-20020 July 1999 LER 99-001-00:on 990628,ESF Signal Closed All Eight MSIVs While Plant Was Shutdown.Caused by Failure of Relay RPS-RLY-K10D.Subject Relay Was Replaced & Tested on 990630. with 990720 Ltr 05000397/LER-1999-001, :on 990628,ESF Signal Closed All Eight MSIVs While Plant Was Shutdown.Caused by Failure of Relay RPS-RLY-K10D.Subject Relay Was Replaced & Tested on 990630. with1999-07-20020 July 1999
- on 990628,ESF Signal Closed All Eight MSIVs While Plant Was Shutdown.Caused by Failure of Relay RPS-RLY-K10D.Subject Relay Was Replaced & Tested on 990630. with
ML17292B7271999-06-30030 June 1999 Monthly Operating Rept for June 1999 for WNP-2.With 990707 Ltr GO2-99-124, Monthly Operating Rept for June 1999 for WNP-2.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for WNP-2.With GO2-99-106, Monthly Operating Repts for May 1999 for WNP-2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for WNP-2.With ML17292B6961999-05-31031 May 1999 Monthly Operating Repts for May 1999 for WNP-2.With 990608 Ltr GO2-99-089, Monthly Operating Rept for Apr 1999 for WNP-2.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for WNP-2.With ML17292B6391999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for WNP-2.With 990413 Ltr GO2-99-069, Monthly Operating Rept for Mar 1999 for WNP-2.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for WNP-2.With ML17292B6061999-03-25025 March 1999 Safety Evaluation Accepting Relief Request RV02 GO2-99-048, Monthly Operating Rept for Feb 1999 for WNP-2.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for WNP-2.With ML17292B5871999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for WNP-2.With 990311 Ltr GO2-99-028, Monthly Operating Rept for Jan 1999 for WNP-2.With1999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for WNP-2.With ML17292B5571999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for WNP-2.With 990210 Ltr ML17292B5621999-01-31031 January 1999 Rev 1 to COLR 98-14, WNP-2 Cycle 14 Colr. LD-99-003, Part 21 Rept Re XL-S96 CPR Correlation for SVEA-96 Fuel. Defect Applies Only to WNP-2,during Cycles 12,13 & 14 Operation.Evaluations of Defect Performed by ABB-CE1999-01-15015 January 1999 Part 21 Rept Re XL-S96 CPR Correlation for SVEA-96 Fuel. Defect Applies Only to WNP-2,during Cycles 12,13 & 14 Operation.Evaluations of Defect Performed by ABB-CE LD-99-002, Part 21 Rept Re Incorrect Modeling of BWR Lower Plenum Vol in Bison.Defect Applies Only to Reload Fuel Assemblies Currently in Operation at WNP-2.BISON Code Model for WNP-2 Has Been Revised to Correct Error1999-01-15015 January 1999 Part 21 Rept Re Incorrect Modeling of BWR Lower Plenum Vol in Bison.Defect Applies Only to Reload Fuel Assemblies Currently in Operation at WNP-2.BISON Code Model for WNP-2 Has Been Revised to Correct Error ML17292B5331999-01-15015 January 1999 Part 21 Rept Re XL-S96 CPR Correlation for SVEA-96 Fuel. Defect Applies Only to WNP-2,during Cycles 12,13 & 14 Operation.Evaluations of Defect Performed by ABB-CE GO2-99-006, Monthly Operating Rept for Dec 1998 for WNP-2.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for WNP-2.With GO2-99-041, WNP-2 1998 Annual Operating Rept. with1998-12-31031 December 1998 WNP-2 1998 Annual Operating Rept. with GO2-98-211, Washington Public Power Supply Sys 1998 Annual Rept. with1998-12-31031 December 1998 Washington Public Power Supply Sys 1998 Annual Rept. with ML17292B5351998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for WNP-2.With 990112 Ltr GO2-98-204, Monthly Operating Rept for Nov 1998 for WNP-2.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for WNP-2.With ML17284A8081998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for WNP-2.With 981110 Ltr GO2-98-188, Monthly Operating Rept for Oct 1998 for WNP-2.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for WNP-2.With 05000397/LER-1998-012, :on 980715,failure to Comply with Requirements of TS SR 3.8.4.7 Was Noted.Caused by Inadequate Work Practices.Training Session Was Held with Personnel.With1998-10-27027 October 1998
- on 980715,failure to Comply with Requirements of TS SR 3.8.4.7 Was Noted.Caused by Inadequate Work Practices.Training Session Was Held with Personnel.With
GO2-98-174, Monthly Operating Rept for Sept 1998 for WNP-2.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for WNP-2.With ML17284A7491998-09-10010 September 1998 WNP-2 Inservice Insp Summary Rept for Refueling Outage RF13 Spring,1998 ML17284A7561998-09-0303 September 1998 LER 98-013-00:on 980805,ESF Actuations Were Noted Due to Deenergization of Vital Electrical Bus SM-8.Caused by Inadequate Direction in Troubleshooting Plan.Will Conduct Training for Engineering Personnel.With 980903 Ltr 05000397/LER-1998-013, :on 980805,ESF Actuations Were Noted Due to Deenergization of Vital Electrical Bus SM-8.Caused by Inadequate Direction in Troubleshooting Plan.Will Conduct Training for Engineering Personnel.With1998-09-0303 September 1998
- on 980805,ESF Actuations Were Noted Due to Deenergization of Vital Electrical Bus SM-8.Caused by Inadequate Direction in Troubleshooting Plan.Will Conduct Training for Engineering Personnel.With
05000397/LER-1998-014, :on 980807,completion of TS 3.8.1.F Required Shutdown Due to Inoperability of EDG-2 Was Noted.Caused by Degraded Voltage Regulator for DG-2.Replaced Voltage Regulator & Associated Scrs.With1998-09-0202 September 1998
- on 980807,completion of TS 3.8.1.F Required Shutdown Due to Inoperability of EDG-2 Was Noted.Caused by Degraded Voltage Regulator for DG-2.Replaced Voltage Regulator & Associated Scrs.With
ML17284A7551998-09-0202 September 1998 LER 98-015-00:on 980808,discovered Reactor Coolant Pressure Boundary Leak During Shutdown Conditions.Caused by Leakage from Socket Weld (Fwb 63) on Elbow Connection.Failed Piping Connection Was Replaced.With 980902 Ltr 05000397/LER-1998-015, :on 980808,discovered Reactor Coolant Pressure Boundary Leak During Shutdown Conditions.Caused by Leakage from Socket Weld (Fwb 63) on Elbow Connection.Failed Piping Connection Was Replaced.With1998-09-0202 September 1998
- on 980808,discovered Reactor Coolant Pressure Boundary Leak During Shutdown Conditions.Caused by Leakage from Socket Weld (Fwb 63) on Elbow Connection.Failed Piping Connection Was Replaced.With
GO2-98-166, Monthly Operating Rept for Aug 1998 for WNP-2.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for WNP-2.With ML17284A7311998-08-17017 August 1998 LER 98-012-00:on 980716,determined That 24-month SR 3.8.4.7 Had Not Been Fulfilled within Specified Frequency.Caused by Inadequate Work Practices.License Requested & Received Enforcement Discretion Re Battery Svc test.W/980817 Ltr GO2-98-144, Monthly Operating Rept for July 1998 for WNP-21998-07-31031 July 1998 Monthly Operating Rept for July 1998 for WNP-2 05000397/LER-1998-006, :on 980520,discovered Discrepancies in Low Voltage Bus Calculations During Review of 10CFR50,App R Calculations for High Impedance Faults.Caused by Inadequate Work Practices.Implemented Procedural Changes1998-07-23023 July 1998
- on 980520,discovered Discrepancies in Low Voltage Bus Calculations During Review of 10CFR50,App R Calculations for High Impedance Faults.Caused by Inadequate Work Practices.Implemented Procedural Changes
05000397/LER-1998-011, :on 980617,ECCS Pump Room Flooding Was Noted Due to FP Sys Pipe Break.Caused by Inadequate Design of FP Sys.Detailed Review of FP Sys Design Was Conducted1998-07-17017 July 1998
- on 980617,ECCS Pump Room Flooding Was Noted Due to FP Sys Pipe Break.Caused by Inadequate Design of FP Sys.Detailed Review of FP Sys Design Was Conducted
05000397/LER-1998-010, :on 980615,TS Required Shutdown Due to Inoperability of TIP Sys Isolation Valve Was Noted.Caused by Improper Installation of TIP Tubing.Reattached Affected Tubing & Inspected Other TIP Tubing1998-07-15015 July 1998
- on 980615,TS Required Shutdown Due to Inoperability of TIP Sys Isolation Valve Was Noted.Caused by Improper Installation of TIP Tubing.Reattached Affected Tubing & Inspected Other TIP Tubing
05000397/LER-1998-009, :on 980606,nuclear Steam Supply Shutoff Sys Group 3 & 4 Isolations During Testing Was Noted.Caused by Procedural Deficiency.Counseled Individuals Involved in Preparation1998-07-0101 July 1998
- on 980606,nuclear Steam Supply Shutoff Sys Group 3 & 4 Isolations During Testing Was Noted.Caused by Procedural Deficiency.Counseled Individuals Involved in Preparation
ML17284A6731998-07-0101 July 1998 LER 98-009-00:on 980606,nuclear Steam Supply Shutoff Sys Group 3 & 4 Isolations During Testing Was Noted.Caused by Procedural Deficiency.Counseled Individuals Involved in preparation.W/980701 Ltr GO2-98-119, Monthly Operating Rept for June 1998 for WNP-21998-06-30030 June 1998 Monthly Operating Rept for June 1998 for WNP-2 ML17284A6751998-06-30030 June 1998 Ro:On 980617,flooding of RB Northeast Stairwell with Consequential Flooding of Two ECCS Pump Rooms.Caused by Inadequate Fire Protection Sys Design.Pumped Out Water from Affected Areas to Point Below Berm Areas of Pump Rooms 1999-09-30
[Table view] |
Text
ACCELERATED D STPJBUTION DEMONSTPATION SYSTEM
'REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9005160350 DOC.DATE: 90/04/30 NOTARIZED:
NO DOCKET g
FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.B.
Washington Public Power Supply System POWERS,C.M.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Apr 1990 for WPPS Nuclear Plant Unit 2.W/900505 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R INTERNAL: ACRS AEOD/DSP/TPAB N
Q/ PEB10 EG FI 01 EXTERNAL EGGG STUARTiV A NRC PDR COPIES LTTR ENCL 3
3 1
1 10 10 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA IRM TECH ADV NRR/DOEA/OEAB11 RGN5 LPDR NSIC COPIES LTTR ENCL 1
1 1
1 2
2 1
1 1
1 1
1 1
1 pqg pe ~ds7a NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WAS'ONTACTTHE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 27 ENCL 27
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968
~ 3000 George Washington Way
~ Richland, Washinglon 99352 Docket No.
50-397 May 5, 1990 U. S.
Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555
Dear Sir:
SUBJECT:
NUCLEAR PLANT NO.
2 MONTHLY OPERATING REPORT APRIL 1990 Transmitted herewith is the Monthly Operating Report as required by our, Technical Specifications 6.9.1.6.
Vel.y Truly Youl s, C.
M. Powers (M/D 927M)
WNP-2 Plant Manager CMP/lc Enclosure cc: Mr.
Mr.
Ms.
Mr.
Ml.
J.
B. Martin-C. J. Bosted-Dottie Sherman J. T. Wheelock W.
H. Lovelace NRC Region V
NRG Resident Inspector (901A)
- ANI, Farmington GT
" INPO
- NRG, Washington D.C.
p~PP>>6P~:,p
~
RDR ADOC<
ppypp P5ppp3~~
F'DC P 7@3 god S7$
e
AEPCAT PEAIOO A'PRIL 19 90 men th, year
'NIT SIOTDONNS / AEDUCTIONS
~
~
DOCKET HO.
50-397 UNIT l'Nl)E DME 5
1 90 COMPLETED DY LB HUTCHISON TELEPI GlC (509) 377-24B6 FRI.
DRK 'f7'IKIIIh m*iigigl ~Ilia 90-02 4/21/90 S
239.5 C
1
~W ttlWIEw~.
1 H
RC FUEL XX;'lant shutdown as scheduled for refueling outage R-5 WRP-2 operated routinely in APRIL, completing the end of cycle on a fuel coastdown.,
Plant was shutdown on 21st for scheduled refueling outage.
F-Forced S-SchKI A-Equi.p Failure 0-Maint or Test
~
C-Aefue1 jng 0-Aequlatory Aes triction E-Operator Training h License Examination F-hdmin 0-Oper Error H-Other MFAf00 I-Manual 2-Manual Scratch 3-Iluto Scram 4-Continued I lie~iced Load 9-Other SYSTEM k COWPOM:.NT Exhibit F h H Instructions f'r Preparation ol'ata Entry Sheet Licensee Event Aepnrt (LEA) Filo (NUAEG-0161)
OPERATING DATA REPORT WNP-2 01-May-90 1.
DOCKET: 50-397 2.
REPORTING PERIOD:
Apr-90 3.
UTILITY CONTACT:
OUTAGE + ON-LINE HOURS LEONARD HUTCHISON (509) 377-2486 719 4.
LICENSED THERMAL POWER (MWt):
5.
NAMEPLATE RATING (GROSS MWe):
6.
DESIGN ELECTRICAL RATING (NET MWe):
7.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
8.
MAXIMUM DEPENDABLE CAPACITY (NET MWe):
9.
IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:
3323 1200.9 1100 1140 1095 10.
POWER TO WHICH RESTRICTED, IF ANY (NET MWe):
ll. REASONS FOR RESTRICTIONS, IF ANY:
None 12.
REPORT PERIOD HOURS 13.
HOURS REACTOR CRITICAL 14.
RX RESERVE SHTDWN HRS 15.
HRS GENERATOR ON LINE 16.
UNIT RESERVE SHUTDOWN HOURS 17.
GROSS THERMAL ENERGY (MWH) 18.
GROSS ELECTRICAL ENERGY (MWH) 19.
NET ELECTRICAL ENERGY (MWH) 20.
UNIT SERVICE FACTOR 21.
UNIT AVAILABILITYFACTOR 22.
UNIT CAPACITY FACTOR (MDC NET) 23.
UNIT CAPACITY FACTOR (DER NET) 24.
UNIT FORCED OUTAGE RATE 25.
FORCED OUTAGE HOURS MONTH 719 493.8 0.0 479.5 0.0 1397909 461570 439296
- 66. 7>o 66.74
- 55. 8~o
- 55. 5>o 0.04 0.0 YEAR CUMULATIVE 2879 47143.2 2653.8 35729.1 0.0 340.4 2639.5 34487.4 0.0 381.7 8233337 96577777 2739380 32143330 2640193 30926336 91 '~o 73 '+o 91.74 74.04 83.74 59.9%
83.4~o 59.64 0.0<
- 8. 0>o 0.0 2996.2 26.
SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, DURATION):
- 27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:
6/5/90
t r l
~ ~
AYERAGE GAILY UNIT PURER LEVEL~
DOCKET NO.
UNIT WNP-2 DATE 5/1/90 MONTH APRIL 1990 DAY AVERAGE DAILY POWER LEVEL (MwE-Net) 923 17.
COMPLETED BY LB HUTCHISON TELEPHONE (509) 377-2486 DAY AVERAGE DAILY POWER LEVEL (MwE-Net) 918 2.
3.
4, 5.
6.
7.
8.
9.
10.
12.
13.
14.
15.
16.
957 958 953 950 946 940 937 937 932 922 928 926 933 924 920 18.
19.
20.
21.
22.
23.
24.
25.
26.
27
'8.
29 ~
30.
31.
916 909 719 INSTRUCTIONS On this form, list the average dai'ly unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month.
Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100 line (or the restricted power level line).
In such
- cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
t~
C g ~
Jt
~
Ilb