Text

ACCELERATED D UTION DEMONSTRATION SYSTEM I

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS).

ACCESSION NBR:9002160139 DOC.DATE: 90/02/02 NOTARIZED: YES DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTHOR AFFILIATION AUTH. NAME SORENSEN,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Application for amend to'icense NPF-21,revising Tech Spec.

L Surveillance Requirement 4.8.1.1.2.d.2.

DISTRIBUTION CODE: A001D COPIES RECEIVED:.LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution S NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 'A PD5 LA 1 1 -PD5 PD 1" 1 SAMWORTH,R 5 5 ,

'D INTERNAL: ACRS 6 6 NRR/DET/ECMB 9H 1 D NRR/DOEA/OTSB11 1 1 NRR/DST 8E2 1 1 NRR/DST/SELB 8D 1 1 NRR/DST/SICB7E 1 1 NRR/DST/SRXB 8E 1, 1 NUDOCS-ABSTRACT 1' S 0 &EM 1 0 OGC/HDS2 1 '

0 REG FILE 01 1 1 RES/DSIR/EIB 1 EXTERNAL: LPDR 1 .1

'1 NRC PDR 1 NSIC 1 R

, D S

A D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WAFfEI CONTACT THE.DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL 25 "*

V 0

)'I U

W

~ i,l l .'

I~ I

WASHINGTON PUBLIC POWER SUPPLY SYSTEM 4

P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 February 2, 1990 Docket No. 50-397 G02-90-016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

NUCLEAR PLANT NO. 2, OPERATING LICENSE NPF-21 REQUEST FOR ANENDNENT TO TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENT 4.8. 1. 1.2.d. 2 (NOD IF I ED)

Reference:

1) Letter, G02-90-004, GC Sorensen (SS) to NRC, same subject, dated January 4, 1990
2) Letter, John A. Zwolinski (NRR) to GC Sorensen (SS),

"Emergency Change to Technical Specification Surveillance Requirement 4.8. 1. 1.2.d.2 for Facility Operating License NPF-21 (TAC No. 75564)", dated January 5, 1990 In Reference 1 the Supply System requested that the WNP-2 Tech. Spec. be amended on an emergency basis to eliminate the subject surveillance requirement and to add a new diesel fuel oil surveillance (ASTH-D2276-78, Method A) in order to ensure that diesel generator operability not be impaired by insoluables in the fuel oil. In Reference 2 the NRC concluded that sufficient information had been submitted to allow them to temporarily waive compliance with Surveillance Requirement 4.8. 1. 1.2.d.2 effective immediately, and to remain effective until completion of their review of the Supply System's January 4, 1990 amendment request.

After considerable discussion with the Staff, the Supply System agrees to modify their amendment request as follows:

1) On page 3/4 8-4, do not delete 4.8. 1.1.2.d.2 as submitted.

Instead, an asterisk will be added at the end of item 4.8. 1. 1.2.d.2 P'DC

,900'Zl 60T39 90'0202 PDR ADOCK 05000397 pP 1I

~

~

February 20, 1990 t

Page Two RE(VEST FOR AMEND. TO TS SURVEILLANCE RE(UIREMENT 4.8.1.1.2.d.2 (MODIFIED)

2) Also on page 3/4 8-4, instead of adding a new insert (paragraph e), the same insert will be slightly modified to be in effect only until May 30, 1990, and annotated with an asterisk to be in effect during that period in lieu of item 4.8. 1. 1.2.d.2.

A modified page 3/4 8-4 is included to reflect the above changes. As this modification does not change the type of test requested or reduce the frequency originally contemplated, the Supply System has determined that the arguments put forth in Reference 1 with respect to this not being an unreviewed safety question nor constituting a significant hazards consideration are still valid.

It is the Supply System's understanding that this change is being approved on a temporary basis with the expectation that our examination of the diesel fuel oil program will lead to broader changes being requested in the form of a subsequent amendment request. As discussed, we expect to be able to submit such a request to the NRC by March 30, 1990. This will require the Staff to expedite their review in order to minimize the impact of the expiration date of May 30, 1990.

Very truly yours, G. C. S rensen, Manager Regulatory Programs HLA/bk cc: JB Martin - NRC RV NS Reynolds - BCP&R RB Samworth - NRC .

DL llilliams - BPA/399 NRC Site Inspector - 901A

J ~

h

'I

STATE OF WASHINGTON)

Subject:

~ Q4'C~/

COUNTY OF BENTON ) 7 5 4'~uzi: Eeq F.P I. ( z.gz I, G. C. Sorensen, being duly sworn, subscribe to and say that I am the Manager, Regulatory Programs, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information, and belief the statements made in it are true.

DATE 1990 G. C. rensen, Manager Regul ory Programs On this day personally appeared before me G. C. Sorensen, to me known to be the individual who executed the foregoing instrument, and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.

GIVEN under my hand and seal this P " day of ~ 1990.