ML17285A772

From kanterella
Jump to navigation Jump to search
Forwards LER 89-038.Event Began Early in Calendar Yr.Initial Plant Compliance Engineer Evaluation Classified Event Not Reportable.Subsequent Review Revealed Four Addl Valves & Event Reportable
Date released: 06/27/2018 Download: ML17285A772


LER 89-038-00:on 890913,plant Equipment Operators Discovered Two Small 3/8 Inch Valves Which Should Have Been Included on Primary Containment Integrity Verification Surveillance. Caused by Inadequate procedures.Walk-down Planned
ML17285A773
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/06/1989
From: Fies C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
References
Download: ML17285A773 (7)
Forwards LER 89-038.Event Began Early in Calendar Yr.Initial Plant Compliance Engineer Evaluation Classified Event Not Reportable.Subsequent Review Revealed Four Addl Valves & Event Reportable
ML17285A771
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/06/1989
From: Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML17285A771 (2)