Monthly Operating Rept for Jul 1989 for WNP-2
ML17285A661
Person / Time
Site: Columbia 
Issue date: 07/31/1989
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8908170602
Download: ML17285A661 (7)


Text

ACCELEBRATED D1 BUTION DEMONSTR ON SYSTEM 4;4 REGULATORY INFORMATXON DISTRIBUTION SYSTEM (RIDS)

FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFXLXATION HUTCHISON,L.B.

Washington Public Power Supply System POWERS,C.M.

Washington Public Power Supply System RECIP.NAME RECXPIENT AFFILXATXON DOCKET 05000397

SUBJECT:

Monthly operating rept for Jul 1989 for WNP-2.

890808 DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR $ ENCL f SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R XNTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 10 NRR/DREP/RPB 10 01 EXTERNAL: EGGG SIMPSON, F NRC PDR COPIES LTTR ENCL 3

3 1

1 10 10 1

1 1,

1 1

1 1

1 1

1 1

RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA IRM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN5 LPDR NSIC COPIES LTTR ENCL 1

1 1

1 2

2 1

1 1

1 1

1 1

1 1

1 TOTAL NUMBER OF COPIES REQUIRED:

LTTR

=29 ENCL 29

)i

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968

~ 3000 George Washington Way

~ Richland, Washington 99352 Docket No. 50-397 August 8, 1989 U.S.

Nuclear, Regulatory Commission Document Control Desk Washington; D.C. 20555

Dear,

Sir,:

SUBJECT:

NUCLEAR PLANT NO.

2 MONTHLY OPERATING REPORT Transmitted herewith is the Nonthly Operating Report for, July 1989 as required by our, Technical Specifications 6.9.1.6.

Very Truly Your,s, C.

N. Powers (N/D 927M)

WNP-2 Plant Manager, CNP/lc Enclosur,e cc:

Nr,.

Nr,.

Ms.

Mr..

Nr,.

J.

B. Mar,tin C. J.

Bosted Dottie Sherman J. T. Wheelock W.

H. Lovelace NRC Region V

NRC Site Representative (901A)

ANI; Farmington CT INPO NRC, Washington D.C.

8908170602 890731 PDR ADOCK 05000397 PDC

r

GPERATINB DATA REPORT WNP-2 08/01/89 dckte i.

DOCKETs 50-397 2

REPGRTINB PERIOD gJJJ $~$ g.

OUTAGE + ON-LINE HOURS 744 3.

UTILITY CONTACTs LEONARD HUTCHISON (509) 377-2501 EXT-2486 4.

Se 6.

7 1 8

LICENSED THERMAL POWER

<MWt) s NAMEPLATE RATING (GROSS MWe)

DESIGN ELECTRICAL RATING (NET MWe) s MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) s MAXIMUM DEPENDABLE CAPACITY (NET MWe) s IF CHANGES OCCUR ABOVE SINCE LAST REPORT~

GIVE REASONSs JSSF 3323 1200.9 10.

POWER TO WHICH RESTRICTED'F ANY (NET MWe) s 11.

REASONS FGR RESTRICTIONS~ IF ANYs NONE 12.

REPORT PERIOD HOURS 13.

HOURS REACTOR CRITICAL 14.

RX RESERVE BHTDWN HRB 15.

HRS GENERATOR ON LINE ih. UNIT RESERVE SHUTDOWN HOURS 17-GROSS THERMAL ENERGY (MWH) 18.

GROSS ELECTRICAL ENERGY

<MWH) 19.

NET. ELECTRICAL ENERGY (MWH) 20.

UNIT SERVICE FACTOR 21.

UNIT AVAILABILITYFACTOR 22.

UNIT CAPACITY FACTOR (MDC NET) 23.

UNIT CAPACITY FACTOR (DER NET) 24.

UNIT FORCED OUTAGE RATE 25 FORCED OUTAGE HOURS MONTH 744 730.42 0

716+/

2 274 937 748 400 720 732 96.3X 96.3%

88.47K 88.07K O.OX 0.0 YEAR 5087 2528.lk 229M5 9 0.

9 QLBR9 3 929 QZO 2 9+6 gg.4 Z

66,81K 53,25%

53.01%

2.40K 83.64 CUMULATIVE RQ.49lM 29.J3S~

BCEUF 28.W2 Qj ZBL2 2.G.MS Zf5 26.J22 67M 25.J29 492 ZO.MX 2,1.~

$6.MX 56 29%

8,86K 2775.22 26.

SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE DATE DURATION)s NONE 27.

IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATEs

VERAGE DAILY UNIT POWER LEVEL tlONTH JULY DAY AVERAGE DAILY POWER LEVEL (MwE-Net) 17.

OCKET NO.~

UNIT WNP-2 DATE 8/1/89 COMPLETED BY LB HUTCHISON TELEPHONE (509)377-2486 DAY AVERAGE DAILY POWER LEVEL (h!wE-Net)

'h 1058 2.

3.

4.

5.

6.

7.

8.

9 10.

12.

13.

14.

15.

16.

391 840 687 846 945 1031 1042 1066 1063 1064 1057 1053 1074 1054 1060 18.

19.

20.

21.

22.

23.

24.

25.

26.

27.

28.

29

'0.

31.

1057 1050 1052 1051 1067 1058 1055 1055 1050 1032 1063 1062 1051 1053 INSTRUCTIONS On this form, list the average daily unit power level in t!We-Net for each day iq the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month.

Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100 line (or the restricted power level line).

In such

cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

DOCKET NO.

50-397 AEKAT PEAIGO JULY 19~8

mmth, year LAIT Sf UTD01'fNS / AEDUCTIONS UNIT NNfE DnTE 8/I/89 COMPLETED OY LB HUTCHISON TELEPlfONE (509)377-2486 Fin.

li>n E TVii'K>n~ m/i%a>>ilà 89-08 6/30/89 S

27.47 B

4 IZCVB=

Y 'I 4 olOT G<<r-E

'A NECFUN CONCLUDED OUTAGE FOR OVERSPEED TESTING OF TURBINE AND SCRAM TINE TESTING WHICH FOLLOWED REFUELING OUTAGE.

I SUhWJNY l WNP 2 ENTERED MONTH SHUTDOWN.

SUBSEQUENTLY RETURNED TO FULL POWER OPERATION FOR REMAINDER OF MONTH.

TYPE F-Forced S-Scl>ed A-Equi.p Failure 0-Maint or Test

~

C-AefueI jng 0-Aegula tory Aes triction E-Operator Training ft License Examination F-lldmin G-Oper Error l3-Other 1-Manual 2-Manual Scram 3-Iluto Scram 4-Continued 5 fleeced Load 9-Other SYSTEhf k COMPOhCHT Exhibit F fthm H Instructions f'r Preparation of'ata Entry Sheet Licensee Event Report (LER) File (fNAEG-0161)