Forwards SER Finding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at WNP-2 & That Licensee Adequately Addressed Actions Requested in GL-96-05
ML17284A895
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/18/1999
From: Jack Cushing
NRC (Affiliation Not Assigned)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17284A896 List:
References
GL-96-05, TAC-M97119, NUDOCS 9910260051
Download: ML17284A895 (6)


Text

gP,R RECC cN "p

Cy

~.

P

~

0p

~

IVlp Y.

Cy

+C

~O

++*++

~.

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055&4001 October 18, 1999 Mr. J. V. Parrish Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)

Richland, WA 99352-0968 SUBJECT COMPLETION OF LICENSING ACTIVITYFOR GENERIC LETTER 96-05, "PERIODIC VERIFICATIONOF DESIGN-BASIS CAPABILITYOF SAFETY-RELATED MOTOR OPERATED VALVES"FOR WNP-2 (TAC NO. M97119)

Dear Mr. Parrish:

On September 18, 1996, the NRC issued Generic Letter (GL) 96-05 requesting each nuclear power plant licensee to establish a program, or to ensure the effectiveness of its current'rogram, to verify on a periodic basis that safety-related motor-operated valves (MOVs) continue to be capable of performing their safety functions within the current licensing bases of the facility.

On November 7, 1996, Energy Northwest submitted a 60-day response to GL 96-05 notifying the NRC that it would implement the requested MOV periodic verification program at WNP-2.

On March 13, 1997, the licensee submitted a 180-day response to GL 96-05 providing a summary description of the MOV periodic verification program planned to be implemented at WNP-2. In a letter dated May 20, 1998, the licensee updated its commitment to GL 96-05. On June 4, 1999, the licensee provided a response to a request for additional information regarding GL 96-05 forwarded by the NRC staff on March 26, 1999.

The NRC staff has reviewed the licensee's submittals and applicable NRC inspection reports for the MOV program at WNP-2. The staff finds that the licensee has established an acceptable program to verify periodically the design-basis capability of the safety-related MOVs at WNP-2 through its commitment to all three phases of the Joint Owners Group (JOG) program on MOV periodic verification and the additional actions described in its submittals.

As discussed in the attached safety evaluation (SE), the staff concludes that the licensee is adequately addressing the actions requested in GL 96-05. The NRC staff may conduct inspections at WNP-2 to verify the implementation of the MOV periodic verification program is in accordance with the licensee's commitments; this SE; the SE dated October 30, 1997, on the JOG program oh MOV periodic verification; and the SE dated February 27, 1996, on the Boiling Water Reactors Owners'Group.methodology for ranking MOVs by their safety significance.

() Q gl 99i026005i 99i0i8 PDR ADQCK 05000397 P

PDR

1

Mr. J.'V. Parr'ish This closes the staffs efforts in regards to TAC No. M97119. The staff appreciates your efforts in regard to this matter.

Sincerely,

~/

ack Gushing, Project Manager, Section 2 Project Directorate IV& Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-397

Enclosure:

Safety Evaluation cc w/encl: See next page

i'l

Nuclear Project No. 2 CC:

Mr. Greg O. Smith (Mail Drop 927M)

Vice President, Generation Energy Northwest P. O. Box 968 Richland, Washington 99352-0968 Mr. Albert E. Mouncer (Mail Drop 1396)

Chief Counsel Energy Northwest P.O. Box 968 Richland, Washington 99352-0968 Ms. Deborah J. Ross, Chairman Energy Facility Site Evaluation Council P. O. Box 43172 Olympia, Washington 98504-3172 Mr. D. W. Coleman (Mail Drop PE20)

Regulatory Affairs Manager Energy Northwest P.O. Box 968 Richland, Washington 99352-0968 Mr. Paul Inserra (Mail Drop PE20)

Manager, Licensing Energy Northwest P.O. Box 968 Richland, Washington 99352 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower 8 Pavilion 611 Ryan Plaza Drive, S'uite 400 Arlington, Texas 76011-8064 Chairman Benton County Board of Commissioners P.O. Box 69 Prosser, Washington 99350-0190 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 69 Richland, Washington 99352-0069 Mr. Rodney L. Webring (Mail Drop PE08)

Vice President, Operations Support/PIO Energy Northwest P. O. Box 968 Richland, Washington 99352 Perry D. Robinson, Esq.

Winston 5 Strawn 1400 L Street, N.W.

Washington, DC 20005-3502 Mr. Bob Nichols Executive Policy Division Office of the Governor P.O. Box 43113 Olympia, Washington 98504-3113