ML17284A882

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-397/99-09 on 990725-0904.Three Violations Identified & Being Treated as Noncited Violations
ML17284A882
Person / Time
Site: Columbia 
Issue date: 09/24/1999
From: Brockman K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17284A883 List:
References
50-397-99-09, NUDOCS 9909300161
Download: ML17284A882 (10)


See also: IR 05000397/1999009

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CCESSION NBR:9909300161

DOC.DATE: 99/09/24

NOTARIZED: NO

CIL:50-397

WPPSS Nuclear Project, Unit 2,,Washington Public

Powe

AUTH.NAME

AUTHOR AFFILIATION

BROCKMAN,K.E.

Region

4 (Post

820201)

RECZP.NAME

RECIPIENT AFFILIATION

PARRISH,J.V.

Washington Public Power Supply System

SUBJECT:

Forwards insp rept 50-397/99-09

on 990725-0904.Three

violati'ons identified

Ec being treated

as noncited

violations.

1

DISTRIBUTION CODE: IE01F

COPIES

RECEIVED:LTR 4 ENCL

SIZE:

TITLE: General

(50 Dkt)-Xnsp Rept/Notice of Violation Response

NOTES:

DOCKET ¹

05000397

+/r

RECIPIENT

ID CODE/NAME

LPD4-2

COPIES

LTTR ENCL

1

1

RECIPIENT

ID CODE/NAME

CUSHING,J

COPIES

LTTR ENCL

1

1

INTERNAL: ACRS

DEDRO

NRR/DIPM/IIPB

NRR/DRIP/REXB

OE

RGN4

FILE

01

2

2

1

1

1

1

1

1

1

l.

1

1

AEOD.

C

FILE CENTER

NRR/DZPM 0

NUDOCS-ABSTRACT

OGC/RP

1

1

1

.

1

1

1

1

1

1

1

ERNAL: LMZTCO MARSHALL

NRC PDR

1

1

1

1

NOAC

NUDOCS FULLTEXT

1

1

1

1

NOTE TO ALL'RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE

WASTETH

TO HAVE YOUR NAME ORORGANIZATION REMOVED FROM DISTRIBUTION LIST

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION

CONTACT THE DOCUMENT CONTRO

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

18

ENCL

18

~gn ng~o

(4

C~

0

Cy

O0

~O

~>>*~~

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZADRIVE, SUITE 400

ARLINGTON,TEXAS 76011-8064

SCP

2C l999

Mr. J. V. Parrish (Mail Drop 1023)

Chief Executive Officer

Energy Northwest

P.O. Box 968

Richland, Washington

99352-0968

SUBJECT:

NRC INSPECTION REPORT NO. 50-397/99-09

Dear Mr. Parrish:

This refers to the inspection conducted on July 25 through September 4, 1999, at the WNP-2

facility. The enclosed report presents the results of this inspection.

During the inspection period, your conduct of activities was generally characterized by

safety-conscious

operations, sound engineering and maintenance practices, and careful

radiological work controls.

Based on the results of this inspection, the NRC has determined that three Severity Level IV

violations of NRC requirements occurred.

Some of the violations were comprised of multiple

examples.

These violations are being treated as noncited violations, consistent with

Appendix C of the Enforcement Policy. The noncited violations are described in the subject

inspection report.

With respect to the 10 CFR Part 50, Appendix B, Criterion III (Design Control) violation, we

have documented three design-related problems concerning the accuracy and fidelityof your

Technical Specifications.

We have also noted during the past 18 months that four similar

issues were previously documented

in NRC Inspection Reports 50-397/99-07 and -98-15.

In

all, we have noted seven instances where your Technical Specifications, Bases, or

implementing procedures were inappropriate to the circumstances.

Considering the relatively

small focus that we put into these activities, we are concerned because

the overall fidelityof

your Technical Specifications appears suspect.

You have acknowledged this potential trend

and plan to address it further through your corrective actions program. We willassess

the

results of your review during a future inspection.

If you contest the violations or severity level of the noncited violations, you should provide a

response within 30 days of the date of this inspection report, with the basis for your denial, to

, the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-

0001, with copies to the Regional Administrator, U.S. Nuclear Regulatory Commission,

Region IV, 611 Ryan Plaza Drive, Suite 400, Arlington, Texas 76011; the Director, Office of

Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001;

and the NRC Resident Inspector at the WNP-2 facility.

990930016f

990924

PDR

ADOCK 05000397

8

PDR

Energy Northwest

-2-

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its

enclosure, and your response,

if requested,

willbe placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we willbe pleased to discuss them

with you..

Sincerely,

e

re

K n E. B

c

ar+irectcr

wision of Reactor Projects

Docket No.:

50-397

License No.:

NPF-21

Enclosure:

NRC Inspection Report No. 50-397/99-09

cc w/enclosure:

Chairman

Energy Facility Site Evaluation Council

P.O. Box 43172

Olympia, Washington

98504-3172

Mr. Rodney L. Webring (Mail Drop PE08)

Vice President, Operations Support/PIO

Energy Northwest

P.O. Box 968

Richland, Washington

99352-0968

Mr. Greg O. Smith (Mail Drop 927M)

Vice President, Generation

Energy Northwest

P.O. Box 968

Richland, Washington

99352-0968

Mr. D. W. Coleman (Mail Drop PE20)

Manager, Regulatory Affairs

Energy Northwest

P.O. Box 968

Richland, Washington

99352-0968

Energy Northwest

Mr. Albert E. Mouncer (Mail Drop 396)

Chief Counsel

Energy Northwest

P.O. Box 968

Richland, Washington

99352-0968

Mr. Paul Inserra (Mail Drop PE20)

Manager, Licensing

Energy Northwest

P.O. Box 968

Richland, Washington

99352-0968

Perry D. Robinson, Esq.

Winston 8 Strawn

1400 L Street, N.W.

Washington, D.C. 20005-3502

Mr. Bob Nichols

State Liaison Officer

Executive Policy Division

Office of the Governor

P.O. Box 43113

Olympia, Washington

98504-3113

Energy Northwest

-4-

SEp 2z js99

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

DRS Director

.

Branch Chief (DRP/E)

Branch Chief (DRP/TSS)

R. Wise, Allegations Coordinator

Resident Inspector

RIV File

.

RITS Coordinator

Senior Project Inspector (DRP/E)

DOCUMENT NAME: R:QWN2<WN909RP.GDR

To receive co

of document. Indicate In box: "C" = Co

without enclosures

"E" = Co

with enclosures "N = No co

RIV:SRI

GDRe

lo le*

Sl:DRS/EM

PAGoldber

C:DRS/EM

DAPowers*

C:DRS/PS

6MGood*

C:DRP/E

LJSmith L

09/20/99

E-LJS

09/21/99

E-LJS

09/21/99

D:DRP

09/20/99

E-LJS

09/

99

KEBrockman

09"

9

  • Previously Concurred

09/ /99

09/ /99

09/ /99

OFFICIALRECORD COPY

09/ /99

Energy Northwest

-4-

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

DRS Director

Branch Chief (DRP/E)

Branch Chief (DRP/TSS)

R. Wise, Allegations Coordinator

Resident Inspector

RIV File

RITS Coordinator

Senior Project Inspector (DRP/E)

DOCUMENT NAME: R:5 WN2>WN909RP.GDR

To receive co

of document, Indicate in box: "C" = Co

without enclosures

"E" = Co

with enclosures "N" = No co

RIV:SRI

GDRe

lo le

09/20/99

E-LJS

D:DRP

KEBrockman

t

/..

09/',"

9

Previously Concurred

SI:DRS/EM

PAGoldber

09/21/99