ML17284A516

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1988 for WPPSS Unit 2
ML17284A516
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/31/1988
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8809160197
Download: ML17284A516 (7)


Text

~

~

t t

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) o oF ACCESSION NBR:8809160197 DOC.DATE: 88 NOTARIZED: NO DOCKET g FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH,.NAME AUTHOR AFFILIATION HUTCHISON,L.B.

Washington Public Power Supply System POWERS,C.M.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Mon crating rept for Aug 1988 for WNP-2.

W 80908 tr.

DISTRIBUTION ODE: IE24D COPIES RECEIVED:LTR ENCL TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

SIZE:

D

'S

, I

. 'ECIPIENT; "

ID CODE/NAME PD5 LA SAMWORTH,R INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 11 NRB/

PB 10 FH 01 EXTERNAL EG&G WILLIAMSI S NRC PDR COPIES LTTR ENCL 1

0 1

0

~

10 10 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA n

ARM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN5 LPDR NSIC COPIES',, (',

LTTR ENCL '

5 1

1 2

2 1

1 1

1, 1

1 1

1 1

A S"

S A

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 31 ENCL'9

N R

OPERATINB DATA REPORT NNP-2 Ol-Sep-88 DOCKET: 50-397 2.

REPORTING PERIOD:

UTILITY CONTACT:

Aug-88 OUTAGE + ON-LINE HOURS LEONARD HUTCHISON (509) 377-2486 744 5.

6.

7.

8.

LICENSED THERMAL POWER (MWt):

NAMEPLATE RATING (GROSS MNe):

DESIGN ELECTRICAL RATING (NET MMe):

MAXIMUM DEPENDABLE CAPACITY (GROSS MNe):

MAXIMUM DEPENDABLE CAPACITY (NET MNe):

DM2D 1200.9 1100 1140 10'P5 9.

IF CHANGES OCCUR ABOVE SINCE LAST, REPORT GIVE REASONS:

10-PONER TO WHICH RESTRICTED'F ANY (NET MWe) ".

11.

REASONS FOR RESTRICTIONS~

IF ANY 12.

13.

14 15.

'6.

17.

18.

19.

20.

21.

22.

23 24 25.

REPORT PERIOD HOURS HOURS REACTOR CRITICAL RX RESERVE SHTDNN HRS HRS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY (MWH)

GROSS ELECTRICAL ENERGY (MNH)

NET ELECTRICAL ENERGY (MMH)

UNIT SERVICE FACTOR UNIT AVAILABILITYFACTOR UNIT CAPACITY FACTOR (MDC NET)

UNIT CAPACITY FACTOR (DER NET)

UNIT FORCED OUTAGE RATE FORCED OUTAGE HOURS MONTH 744 566 2 0.0 566. 1 0.0 1800544 595670 575517 76.1%

76. 1%
70. 6%
70. 3%
14. 1%
92. 7 YEAR CUMULATIVE 5855 32575.2 3733.9 23640.7 0.0 340.4 3576.9'2718.8
0. 0 381 ~ 7 11095478 61478245 3680270 20497410 3552140 19720092 61.1/

69.7/

61. 1/
70. 9%
55. 4/
55. 3/
55. 2/
55. 0/
18. 3/
9. 7/

801.9 2447.0 26 SHUTDQNNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPEvDATEvDURATION).

HQHE

27. 'IF'URRENTLY SHUTDOWN ESTIMATED STARTUP DATEi 8809160197 880831 PDR ADOCK 05000397 R

PDC

4 ~

AVERAGEDAILYUNITPOWER LEVEL DOCKET NO.

ilNl I I'LL DATE 9/1/88 COMPLETED BY LB Hutchl son I

TELEPHONE 509 377-2486 MONTH AUGUST,1988 DAY AVERAGEDAILYPOWER LEVEL (MWe-Net)

'l 1059 DAY AVERAGEDAILYPOWER LEVEL (MWe-Net) 17 1058 18

~ 8 1063 1061 1045 1063 1066 1064 1056 19 20 21 23 24 702 766 868 980 972 558 1058 1062 12 13 15 1039 1056 1058 1059 1060 29 31 INSTRUCTIONS Qn this form, list the average daily unit power level in MWe~Net. for each day in.the reporting month. Compute to the nearest whole megawatt.

'Ihese figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power!evel exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet'should be footnoted to explain the apparent anomaly,

REPCAT. PERIOD

.'AUGUST 19 88

mcnth, year t

II'.

0E TTf'E lVJBh REASIIH hhlEhlCO 88-10P 8/19/88 S

0 H

5 LNIT SUTDOlfNS / REDUCTIONS DOCKET NO. 50-397 UNIT NA}}E DATE 9 1 88 COhiPLETED BY LB HUTCHIS(fH TELEP}}ONE (509)377-2486 lZRR ttt t tttt tttltttt t t RB GONROD REDUCED POWER TO PERFORM A SCHEDULED CONTROL ROD SEQUENCE EXCHANGE 88"11 8/24/88 '. 92.65 D 88-12 8/28/88 S

85. 22 B

88-29 'GI VALVEX PLANT WAS SHUTDOWN WHEN UNIDENTIFIED LEAKAGE IN PRIMARY COHTAIHMENT EXCEEDED TECH SPEC LIMITATIONS. RGIC"V"63 WAS MAJOR SOURCE OF LEAKAGE. VALVE WAS REPAIRED AND RETURNED TO SERVICE. PLANT REMAINED OFF LINE FOR MODIFICATIONS OF RHR CHECK VALVES, MS"SRV/VACUUM BREAKER REPAIR AND DESIGN CHANGE OF CONTROL ROOM VENTILATING SYSTEM. l}NP-2 INCURRED 1 POWER REDUCTION, 1.FORCED OUTAGE AND 1 SCHEDULED OUTAGE IN AUGUST FOR SUhtNAY REASONS STATED ABOVE. TYPE F-Forced S-c}>cd gt t ~ F-Admin G-Oper Error }}-Other A-Ecjuip Failure 0-Maint or Test ~ C-Rr.fue ling D-Re'qulatory Restriction E-Operator Training

h License Examination METHOD l Manual 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEh}

Ec COMPOM.:NT Exhibit F h H Instructions for Preparation -of'ata Entry Sheet Licensee Event Report (LER) File (NUREG-0161)

\\'I ~ lw

~4 ~ ti WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 September, 8, 1988 U.S. Nuclear, Regulator Commission Document Control Desk >lashington, D.C. 20555

Dear,

Sir,:

SUBJECT:

NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for, August 1988 as required by our, Technical Specifications 6.9.1.6. Very Truly Yours, G. M. Powers (M/D 927M) 'l<NP-2 Plant Manager, CMP/1 c Enclosure cc: Mr,. Mr,. Ms. Mr,. Mr,. J. B. Martin C. J. Bosted Dottie Sherman J. T. Hheelock H. H. Lovelace NRC Region V NRC Site Representative (901A) ANI, Farmington CT INPO NRG, Washington D.G.}}