r ACCEISMTED DISl HURON DEMONSTR ON SYSTEM REGULATORY INFORMATXON DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8804150401 DOC.DATE: 88/03/31 NOTARIZED: NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILXATION HUTCHISON,L.B.
Washington -Public Power Supply System POWERS,C.M.
Washington Public Power Supply System RECXP.NAME RECIPXENT AFFXLIATION DOCKET 05000397
SUBJECT:
Monthly operating rept for Mar 1988.W/880408 ltr.
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL 'IZE:
TXTLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB ll RR/'DREP-B 10 E~g E Ol EXTERNAL: EGGG GROH,M NRC PDR COPIES LTTR ENCL 1
0 1
0 10 1
1 1
1 1
1' 1
RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 NRR/PMAS/ILRB12 RGN5 LPDR NSIC COPIES LTTR ENCL 5
5 1
1 2
2 1
1 1
1 1
1 1
1 1
1 j
A
~ 'A TOTAL NUMBER OF COPIES. REQUIRED:
LTTR 31 ENCL 29
gl
,F g
~
]4'/
'I
OPERATING DATA REPORT WNP-2 01-Apr-88 1.
DOCKET: 50-397 2.
REPORTING PERIOD:
UTILITY CONTACT:
OUTAGE + ON-LINE, HOURS LEONARD HUTCHISQN (509) 377-2486 4
LICENSED THERMAL POWER (MWt):
5.
NAMEPLATE RATING (GROSS MWe):
6.
DESIGN ELECTRICAL RATING (NET. MWe):
7.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
8.
MAXIMUM DEPENDABLE CAPACITY (NET MWe):
9.
IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS'32M 1200.9'100 1140 1095 10.
POWER TO WHICH RESTRICTED IF ANY (NET MWe):
1 i.
REASONS FQR RESTRICTIONS>>
IF ANY:
12.
REPORT PERIOD HOURS 13.
HOURS REACTOR CRITICAL 14.
RX RESERVE SHTDWN HRS 15.
HRB GENERATOR ON LINE 16.
UNIT RESERVE SHUTDOWN HOURS"','7.
GROSS THERMAL ENERGY (MWH) 18.
GROSS ELECTRICAL ENERGY (MWH) 19.
NET ELECTRICAL ENERGY (MWH) 20.
UNIT SERVICE FACTOR 21.
UNIT AVAILABILITYFACTOR 22.
UNIT CAPACITY FACTOR (MDC NET) 23.
UNIT CAPACITY FACTOR (DER NET) 24.
UNIT FORCED OUTAGE RATE 25.
FORCED OUTAGE HOURS MONTH 744 544. 3, 0.0'19. 2 0.0 1497600 509490 491111 69.8/
- 69. 8/
60.3/
- 60. 0/
- 30. 2/
224. 8 YEAR CUMULATIVE 2184 28904.2 1520 2 21427 '
- 0. 0 340. 4 1474.8 20b16.6 0.0 381.7 4439698 54822465 1497610 18314750 1445297 17613249
- 67. 5/
- 71. 3/
- 67. 5/
- 72. 6/
, 60. 4/
- 55. 6/
60.2/
55.4X-32.5X 10.2X
'09.3 2354.3 26.- SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE>>DATE>>DURATION)".
45 DAY REFUELING/MAINTENANCE OUTAGE SCHED~Q Q} $QQQ /PIUS g5 ~93 27-IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE-eeo4150401 eeo331 PDR ADOCK 05000397 R
\\P 4
F ~
c
'J k
t 4
8 t
h t
HEPCAT PERHO
'MARCH 3.988
- mcnth, year LNIT Sf UTD01'fNS / REDUCTIONS
~
~i DOCKET NO.
50-397 I
UNIT NN 1L WNP-2 DATE 4-1-88 COhiPLETED DY LB HUTCHISON TELEPf GNE (509) 377"2481 FTO.
DAE TIP'GlIR5 AZKKII ~t. IIII 88-05 2-13-,88 F
138. 3 A
4
~Yi
.l lWI'8-07 HC HT EXCH CONCLUDED EXTENDED OUTAGE FOR ROOF REPAIR 88-06 2-23-88 F
86.5 A
HC HT EXCH PLANT WAS SHUT DOWN DUE TO HIGH CONDUCTIVITY AS A RESULT OF A CONDENSER IN"LEAKAGE PROBLEM.
REPA WERE PERFORMED AND UNIT RETURNED TO SERVICE I
SUhtf~Y I
WNP-2 CONCLUDED AN EXTENDED OUTAGE FOR ROOF REPAIRS AND INCURRED ONE SHUTDOWN IN MARCH, AS DESCRIBED ABOVE.
TYPE F-Forced S-Scl>cd A-Equip Failure 0-hfaint or Test
~
C-Hefue ling 0-Aegula tory Iles triction E-Operator Trafning h License Examination F-Admin G-Oper Error I)-Other HETff00 1-Manual 2-manual Scratn 3-Auto Scram 4-Continued 53 f)educ ed Load 9-Other SYSTEM 14E COMPOhCNT Exhibit F h H Instructions for Preparation of'ata Entry Sheet Licensee Event Report (LER) File (NUAEG-016l)
~
~
~
AVERAGEDAILYUNITPOWER LEVEL DOCKET NO.
WNP"2
~AIR~
COMPLETED gy LB HUTCHISON TELEPHONE 509 377-2486 MONTH MARCH 1988 DAY AVERAGEDAILYPOWER ~(EL (Meet) 1 0
DAY AVIBMGEDAILYPOWER LEVEL fMWe-Net) 1075 17 10 13
~4 55 709'67 917 1015 1065 1081 1020 1061 1075 1076 18 19 1001 1058 1048 1061 1055 750 205 840 779 828 923 INSTRUCTIONS Qn this form, list the average daily unit power level in MFe~Met for each day in the reporting month. Compute to the nearest whole megawatt.
'Ihese Qgures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net e?ecaical rating of the. unit, there may be occasions when. the daily average power?evel exc..ds the 100fo line (or the restricted power level line). h such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968
~ 3000 George Washington Way
~ Richland, Washington 99352 Docket No. 50-397 April 8; 1988 U.S. Nuclear Regulatory Commission Document Control Desk Washington; D.C. 20555
Dear,
Sir:
SUBJECT:
NUCLEAR PLANT NO.
2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for March 1988 as required by our, Technical Specifications 6.9.1.6.
Very Truly Yours,'.
M. Powers (M/D 927M)
WNP-2 Plant Manager,.
CMP/sl Enclosure cc: Mr.
Mr,.
Hs.
Hr.
Mr.
J.
B. Hartin C. J.
Bosted Dottie Sherman J. T. Wheelock W.
H. Lovelace NRC Region V
NRC Site Representative (901A)