Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/29/1988
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC
References
NUDOCS 8803300329
Download: ML17279A921 (9)


Text

t/

t ACCEMRATED MSZRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8803300329 DOC.DATE: 88/02/29 NOTARIZED: NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.B.

Washington Public Power Supply System POWERS,C.M.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000397

SUBJECT:

Monthly operating rept for Feb 1988.W/880309 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR t

ENCLj SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R INTERNAL: AEOD/DOA ARM TECH ADV NRR/DOEA/EABllE NRR/PMAS/ILRB12 RGN5 EXTERNAL EGGG GROH iM NRC PDR COPIES LTTR ENCL 1

0 1

0 1

1 2

2 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DSP/TPAB NRR/DLPQ/PEB1 1B NRR DREP/RPB10A 01 LPDR NSIC COPIES LTTR ENCL 5

5 1

1 1

1 1

1 1

1 1

1 1

1 880406 A

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 21 ENCL 19

,f

'gC l

l I'

1 V

SS03300329 880229 PDR ADOCK 05000397 DCD HEPCAT PEnICO FEB 1988 men th, year WIT SIIUTDOI'INS / BEOUCTIONS

~ h 1

DOCKET NO 50 397 UNIT I'INIE WNP 2 3/1/88 COIIPLETED DY LB HUTCHISON

,TELEPIIONE (509) 377-2486 HIL IIIA'iiE ~eiE TIIESOTT

~SE TiG 88-04 2/4/88 P

45. 7 G

3 88-05 2/13/88 F

391.1 A

HC iZF7B il ~t mm'.'

1 HF-D Ul 88"03 CD INSTRU PLANT SCRAMMED AT.IOOX POWER DUE TO MSIV ISOLATION CAUSED BY IMPROPER EXECUTION OF A TECH SPEC SURVEILLANCE PROCEDURE.

HT EXCH PLANT WAS SHUT DOWN DUE TO CONDENSER IN-LEAKAGE AND RAPIDLY INCREASING CONDUCTIVITY.

THE OUTAGE WAS EXTENDED BY AN INADVERTENT START OF A REACTOR BUILDING SUPPLY FAN I'IHICH OVERPRESSURIZED THE REACTOR BUILDING CAUSING THE DESIGNED ROOF RUPTURE PANELS TO RELIEVE WITH RESULTANT DAMAGE TO ROOF.

Sit NAY TYPE F-Forced S-chcd A-Equip. Failure 0-hfafnt or Test

~

C-Aefue ling 0-Bey)la tory Des triction E-Operator Training

& License Examination F-lldmin G-Oper Error If-Other llETIIQO l-tkanual 2-hfanual Scrap 3-Otto Scram 4-Continued 43 peduced Load 9-Otfier SYSTEhI & COMPOhCNT Exhibit F & II Xnstructions for Preparation ol'ata Entry Sheet Licensee Event Report (LiEA) File (NUBEG-0161)

f,

AVERAGEDAILYLAZEPOWER LEVEL DOCKET NO.

UNlT~

DATE CDMPUrrZD BY~

TELEpsp~

(509} 377"2486 pNTH FEBRUARY 1988 DAY AVERAGEDAILYPOWER LEVEL (MS~et) 1078 DAY AVI~GEDAILYPOWER LEVEL (MWe-Bet) 0 1084 83 g

2 695 7

874 865 1038 qg 1081 1074 985 734 0

INSTRUCTIONS Qn this fottn, Hst the average daQy unit power level in MFe~Net for each day in the reporting month. Compute to the nearest whole megawatt.

'Qme Qgures will be used to plot a gnph for each report!ng month. LVote that when maximum dependable capacity is used for the net eiecttical nting of the unit, thete may be occasions when. the daily average power!ei4 exc=ds the

!GOfo line (or the resaicted power level line). h such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

OPERATING DATA REPORT NNP-2 01-Mar-88 L.

DOCKET: 50-397 Z.

REPORTING PERIOD:

3..

UTIl ITY CONTACT:

Feb-88 OUTAGE + ON-LINE HOURS LEONARD HUTCHISON (509) 377-2486 LICENSED THERMAL POWER (MNt):

NAMEPLATE RATING tGROSS MNe):

DESIGN ELECTRICAL RATING (NET MNe):

7'.",

MAXIMUM DEPENDABLE CAPACITY (GROSS MNe):

MAXIMUM DEPENDABLE CAPACITY tNET MNe):

IF CHANGES OCCUR ABOVE SINCE LAST REPORT~

GIVE REASONS:

3323 1200. 9 1100 1140 1095 10.

PQNER TO WHICH RESTRICTED'F ANY (NET MWe)

'1.

REASONS FOR RESTRICTIONS~ IF ANY:

12.

13; 14.

15 16.

17" 18..

19'0.

21 ~

22 0 w 23e 24';

25.,

26 MONTH YEAR CUMULATIVE REPORT PERIOD HOURS 696 1440 28160.2 HOURS REACTOR CRITICAL 266 1

975 9 20882 7 RX RESERVE SHTDWN HRS 0 0

0. 0 340. 4 HRS GENERATOR ON LINE 259 2 955 6 2009'7 F 4 UNIT RESERVE SHUTDOWN HOURS 0.0
0. 0 381 ~ 7 GROSS THERMAL ENERGY (MNH) 793067 29420'78 53324865 GROSS ELECTRICAL ENERGY (MWH) 265360 988120 17805260 NET ELECTRICAL.ENERGY (MNH) 256167 954186 17122138 UNIT SERVICE FACTOR 37.2%

66.4/

71 ~ 4/

UNIT AVAILABILITYFACTOR 37 2/

66 4/

72 7/

UNIT CAPACITY FACTOR (MDC NET) 33.6%

60.5/

55.5%

UNIT CAPACITY FACTOR (DER NET)

33. 5%
60. 2/
55. 3%

UNIT FORCED OUTAGE RATE 62 8%

33.6/

9.6%

FORCED OUTAGE HOURS 436. 8 484 ~ 5 2129. 5 SHUTDQNNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE,DATE~DURATION):

REFUELING/MAINTENANCE OUTAGE SCHEDULED FOR 4/25/88 FOR 45 DAYS 27.. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

RL CORCORAN KD. COWAN

. SL WASHINGTON DS FELDMAN GH GODFREY JD HARMON LT HARROLD AD HOSLER LB HUTCHISON 9270 988U 988U 9568 1023 927S 981G 956B 9270 aO E

In'ternal Distribution:

0 Mail Drop:

GJ KUCERA AL OXSEN JF PETERS AJ RAPACZ GC SORENSON DH WALKER OPS FILE 1313.2 CMP/)b 1035 1023 927S 399 280 927S

~F~LE COr v Docket No. 50-,397 March 9,

1988 Director Office of Resource Management U. S. Nuclear Regulatory Commission Washington D. C.

20555 QW

Dear Sir:

SUBJECT:

NUCLEAR PLANT NO.

2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for February 1988 as required by our Technical Specifications 6.9.1.6.

Very Tr uly Yours, C.

M. Powers (M/D 927M)

WNP-2 Plant fianager Cl 1P/1 c Enclosure CC'r.

Mr.

Ms.

Mr.

Mr.

John B.. Mar tin Chris Bosted Dottie Sherman J. T. Wheelock W.

H. Lovelace

- 'RC Region V

NRC Site Representative (901A)

ANI, Farmington CT INPO NRC, Washington D.C.

~g~+

Author:

LB HUTCHISON

For Signature of

CM POWERS gi/a'a ue4 3/g Section:

For Approval of:

Approved:

Date:

W~OT R2 CORCORAN KD CO !AN

~,

~

~