ACCZLZRATZD DISHUBUTION DEMONSTRA ON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSXON NBR:8803030270 DOC.DATE: 88/01/31 NOTARIZED: NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.B.
Washington Public Power Supply System POWERS,C.M.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION DOCKET g
05000397
SUBJECT:
Monthly operating rept for Jan 1988.W/undated forwarding ltr.
DISTRXBUTION CODE:
IE24D COPXES RECEIVED:LTR EN SIZE:
TITLE: Monthly Operating Report (per Tech Specks NOTES:
RECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R INTERNAL: AEOD/DOA ARM TECH ADV NRR/DOEA/EAB11E NRR/PMAS/ILRB12 RGN5 EXTERNAL: EG&G GROH,M NRC PDR COPIES LTTR ENCL 1
0 1
0 1
1 2
2 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DSP/TPAB NRR PQ/PEB11B
/D P/
B10A G FILE 01 LPDR NSIC COPIES LTTR ENCL 5
5 1
1 1
1 1
1 1
1 1
1 1
1 8
A TOTAL NUMBER OF COPIES REQUIRED:
LTTR 21 ENCL 19 88031 0
OPERATINB DATA REPORT WNP-2 01-Feb-88 1.
DOCKET: 50-397 2.
REPORTINB PERIOD:
3.
UTILITY CONTACT:
Jan-88 OUTAGE + ON-LINE HOURS LEONARD HUTCHISON (509) 377-2486 4.
LICENSED THERMAL POWER (MWt):
5.
NAMEPLATE RATING (GROSS MWe):
6.
DESIGN ELECTRICAL RATING (NET MWe):
7.
MAXIMUM DEPENDABLE-CAPACITY (GROSS MWe):
8.
MAXIMUM DEPENDABLE CAPACITY (NET MWe):
~>&23 1200. 9 1100 1140 1095 9.
IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:
10.
POWER TO WHICH RESTRICTED, IF ANY (NET MWe):
ii. REASONS FOR RESTRICTIONS'F ANY~
12.
REPORT PERIOD HOURS 13.
HOURS REACTOR CRITICAL 14.
RX RESERVE SHTDWN HRS 15.'RS GENERATOR ON LINE 16'NIT RESERVE SHUTDOWN HOURS 17.
GROSS THERMAL ENERGY (MWH) 18.
GROSS ELECTRICAL ENERGY (MWH) 19.
NET ELECTRICAL ENERGY (MWH) 20.
UNIT SERVICE FACTOR 21.
UNIT AVAILABILITYFACTOR 22.
UNIT CAPACITY FACTOR (MDC NET) 23.
UNIT CAPACITY FACTOR (DER NET) 24.
UNIT FORCED OUTAGE RATE 25.
FORCED OUTAGE HOURS MONTH 744 709. 8 0.0 696. 4 0.0 2149031 722760 698019
- 93. 6/
- 93. 6/
- 85. 7/
- 85. 3/
- 6. 4/
- 47. 6 YEAR CUMULATIVE 744 27464.2 709 8 20616.6 0 ~ 0 340. 4 696. 4 19838. 2
- 0. 0 381. 7 2149031 52531798 722760 17539900 698019 16865971 93.6/
72.2X 93.6%
73.6/
- 85. 7X
- 56. 1X
- 85. 3/
- 55. 8X
- 6. 4/
- 7. 9X
- 47. 6 1692. 7 26.
SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE,DURATION):
REFUELING AND MAINTENANCE OUTAGE SCHEDULED FOR 4/25/88 FOR 45 DAYS 27.
IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:
8808030270 880131 PDR ADOCK 05000397 R
...,,, 3t 9 rgZC
(
v
'll III
~ ~
~
~<,
~
a DOCKET NO.
50-397 REPORT PERIOD JAN 19 88 men th, year NIT SIOTDOL'lNS / REDUCTIONS UNIT NAlLE DATE COMPLETED OY L'lNP"2 2/2/88.
LB Hutchison TELEPlLONE 509 377-2486 Htl.
li>n E '>>>>.'H>n~
~csDH si&liU 88-01P 1/5/88 S
0 H
5 88-02 1/18/88 F
40.8 A
c RB CONROD REDUCED POWER TO PERFORM A SCHEDULED CONTROL ROD SEQUENCE EXCHANGE.
HC HTEXCH.
PLANT WAS SHUTDOWN TO CORRECT A CONDENSER TUBE IN-LEAKAGE PROBLEM.
-PLUGGED SEVERAL LEAKING TUBES AND RETURNED UNIT TO SERVICE.
88-03 1/20/88 F
6.8
'H HA INSTRU GENERATOR WAS REMOVED FROM GRID TO RECALIBRATE TURBINE DEH AUTO STOP OIL PRESSURE S'LIITCHES.
I SUl'f'fARY I LlNP-2 INCURRED ONE POL(ER REDUCTION AND TWO SHUTDOLINS IN JANUARY AS DESCRIBED ABOVE F-Forced S-ched A-Equf.p Failure 0-Maint or Test
~
C-Ref ue ling 0-Regulatory Res triction E-Operator Training 8 License Examination F-Acfmin G-Oper Error H-Other hfETlf00 l-Manual 2-Manual Scram 3-Auto Scram 4-Continued 54lnduced Load 9-Other SYSTEM h COMPOM:NT Exhibit F h H Instructions for Preparation of'ata Entry Sheet Licensee Event Report (LER) File (NUAEG-0161)
l t
AVERAGEDAILYUNITPOWER U."VIH.
DOCKET NO.
DATS~
CDMPIZIED BY~
TELEPHONE
( 09) 377-248 MONTH DAY AVE!RAGEDAILYPOWER LEVEL (MWe-Net) 1 1
6'058 1036 1032 656 747 DAY AVERAGEDAILYPOWER LEVEL (MWe-Net)
'j1 1079 407 19 130 822 804 882 1008 1081 1029 1081 1083 12 13 15 1B 1089 1095 1095 1057 1068 1072 1076 2S.
1083 1088 1087 1073 1085 1084 PISTRUCHONS On this form, list the average daily unit power level in MWe~Net for each day in the r porting month. Compute to the nearest ~hole megawatt.
these Qgures will bc used to plot a graph for each reporting month. Note that when nuximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when. the daily average power!evcl exc. ds the 100Fo line (or the restricted power level line). In such cases, the average daily unit power'output sheet should be footnoted to explain thc apparent anomaly.
ai WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968
~ 3000 George Washington Way
~ Richland, Washington 99352 Docket No. 50-397 Director Office of Resource Management U. S.
Nuclear, Regulatory Commission Washington D. C.
20555
Dear,
Sir,,:
SUBJECT:
NUCLEAR PLANT NO.
2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for January 1988 as required by our, Technical Specifications 6.9.1.6.
Yery Truly Yours, C.
. Powers (M/D 927M)
WNP-2 Plant Manager CMP/lc Enclosure ygs J QQQTg) ORI pIGXNhh Centi<<<<B C r ifieasy ger-1giea BZ cc:
Mr,. John B. Martin Mr,. Chris Bosted Ms. Dottie Sherman Mr.. J. T. Wheelock Mr.
W.
H. Lovelace '-
NRC Regi on Y
NRC Site Representative (901A)
ANI, Farmington CT INPO NRC, Washington D.C.
0
,N