|
---|
Category:Letter
MONTHYEAR05000186/LER-2024-003, University of Missouri Research Reactor, Specification Deviation from Technical Specification 3.2.g.212024-10-25025 October 2024 University of Missouri Research Reactor, Specification Deviation from Technical Specification 3.2.g.21 ML24281A1322024-10-0404 October 2024 University of Missouri - Notification of NIST Award 60NANB23D160 NEPA Catex ML24270A0992024-10-0101 October 2024 Examination Confirmation Letter No. 50-186/Ol-25-01, University of Missouri - Columbia ML24142A1432024-08-27027 August 2024 Examination Result Letter No. 50-186/OL-24-02, University of Missouri - Columbia ML24142A1422024-08-27027 August 2024 Examination Report Letter No. 50-186/OL-24-02, University of Missouri - Columbia ML24184A1132024-07-0202 July 2024 Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.10.d IR 05000186/20242012024-05-29029 May 2024 The Curators of the University of Missouri - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000186/2024201 05000186/LER-2024-001, Written Communication as Required by by LER 2024-001-00 for University of Missouri Research Reactor Technical Specification 6.6.c(3) Re Deviation from Technical Specification 3.1 0.d2024-05-23023 May 2024 Written Communication as Required by by LER 2024-001-00 for University of Missouri Research Reactor Technical Specification 6.6.c(3) Re Deviation from Technical Specification 3.1 0.d ML24081A1332024-04-0202 April 2024 University of Missouri-Columbia (MURR) – Change of Facility Project Manager ML24044A1162024-03-0101 March 2024 Examination Confirmation Letter No. 50-186/OL-24-02, University of Missouri-Columbia ML24064A1922024-03-0101 March 2024 Federal Funding for the Conversion of the University of Missouri-Columbia Research Reactor from Highly-Enriched Uranium Fuel to Low-Enriched Uranium Fuel ML24059A4412024-02-28028 February 2024 Univ. of Missouri - Columbia - Submittal of Annual Operating Report Technical Specification 6.6.e IR 05000186/20232022023-12-12012 December 2023 The Curators of the University of Missouri - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000186/2023202 ML23198A0222023-08-29029 August 2023 Examination Report Letter No. 50-186/OL-23-02, University of Missouri - Columbia ML23198A0232023-08-29029 August 2023 Examination Result Letter No. 50-186/OL-23-02, University of Missouri-Columbia ML23221A1172023-08-0303 August 2023 Written Communication as Specified by 10 CFR 50.4(b)(4) Regarding the Submittal of the Physical Security Plan for the University of Missouri Research Reactor as a Part of the Process to Renew Amended Facility Operating License R-103 ML23213A0592023-08-0101 August 2023 Written Communication as Specified by University of Missouri Research Reactor Technical Specification 6.6.2(d) Regarding a Permanent Change in the Facility Organization Involving the Executive Director ML23186A2132023-07-31031 July 2023 Examination Confirmation Letter No. 50-186/OL-23-03, University of Missouri - Columbia IR 05000186/20232012023-07-31031 July 2023 The Curators of the University of Missouri – U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000186/2023201 05000186/LER-2023-003, University of Missouri - Columbia Research Reactor, Written Communication as Required Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.2.b2023-06-0606 June 2023 University of Missouri - Columbia Research Reactor, Written Communication as Required Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.2.b ML23124A0422023-05-0808 May 2023 Examination Confirmation Letter 50-186/OL-23-02, University of Missouri - Columbia ML23103A0742023-04-10010 April 2023 University of Missouri, Columbia Research Reactor, Shipment of Radioactive Material Shipment Identifier MURR 23-01 Highway Route Controlled Quantity ML23024A2772023-04-0707 April 2023 Cover Letter for the Security Inspection Report for the University of Missouri (Public) - October 2022 ML23087A1132023-03-29029 March 2023 Examination Report No. 50-186/OL-23-01, University of Missouri-Columbia ML23089A3162023-03-29029 March 2023 Letter Notifying Univ. of Missouri That Us Dept. of Energy Funding Will Not Be Available in Fiscal Year 2023 to Complete the Conversion of MURR to LEU Fuel ML23087A1142023-03-29029 March 2023 Examination Results Letter No. 50-186/OL-23-01, University of Missouri - Columbia ML23055B1372023-02-24024 February 2023 Submittal of Annual Operating Report for the University of Missouri-Columbia Research Reactor as Required by MURR Technical Specification 6.6.e IR 05000186/20222022023-02-23023 February 2023 The Curators of the University of Missouri - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000186/2022202 - Cover Letter and Enclosure ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML23017A2072023-01-13013 January 2023 Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 6.1.f ML22349A0422022-12-0808 December 2022 Written Communication as Specified in 10 CFR 50.54(b)(5) Regarding Changes to the University of Missouri-Columbia Research Reactor Facility Emergency Plan Without Prior Commission Approval Pursuant to 10 CFR 50.54(q)(3) ML22314A2102022-11-0909 November 2022 Written Communication as Required by Technical Specification 6.6.d(2), Other Reports, Regarding a Change in University of Missouri-Columbia Research Reactor Organization Involving the Reactor Facility Director ML22304A0042022-10-27027 October 2022 University of Missouri - Columbia, Shipment of Radioactive Material, Highway Route Controlled Quantity ML22291A0322022-10-14014 October 2022 University of Missouri Written Communication as Required by 10 CFR 73, Appendix G Regarding a Deviation from the MURR Physical Security Plan ML22290A0042022-10-12012 October 2022 University of Missouri-Columbia Research Reactor, Reportable Event Report Pursuant to 20.2201(a)(ii) Regarding Loss of Licensed Material During Shipment IR 05000186/20222012022-06-14014 June 2022 The Curators of the University of Missouri - U.S. NRC Routine Inspection Report No. 05000186/2022201 ML22158A0792022-06-0606 June 2022 Submittal of Revised Annual Operating Report for the University of Missouri-Columbia Research Reactor as Required by MURR Technical Specification 6.6.e ML22097A0592022-04-0707 April 2022 Approval for Spent Nuclear Fuel Highway Route Application - NRC Route No. 182D - Docket Number 050-0186 ML22088A0782022-03-25025 March 2022 Univ. of Missouri, Federal Funding for the Conversion of the Columbia Research Reactor from Highly-Enriched Uranium Fuel to Low-Enriched Uranium Fuel IR 05000186/20212032022-03-0202 March 2022 The Curators of the University of Missouri U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000186/2021203 ML22056A5162022-02-25025 February 2022 Submittal of Annual Operating Report for the University of Missouri-Columbia Research Reactor as Required by MURR Technical Specification 6.6.e ML22038A6012022-02-0808 February 2022 Acceptance for Spent Nuclear Fuel Highway Route Application NRC No. 182D-Docket No. 050-0186 ML22013B1412022-01-21021 January 2022 Examination Confirmation Letter No. 50-186-OL-22-02, University of Missouri-Columbia 05000186/LER-2021-004, University of Missouri Research Reactor, Deviation from Technical Specification 3.2.g.102021-11-23023 November 2021 University of Missouri Research Reactor, Deviation from Technical Specification 3.2.g.10 ML21327A3042021-11-23023 November 2021 Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.2.f.6 ML21298A1972021-10-25025 October 2021 University of Missouri-Columbia Research Reactor - Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.2.g.6 ML21253A2482021-09-23023 September 2021 Examination Confirmation Letter No. 50-186/OL-22-01, University of Missouri Columbia ML21221A3252021-08-0909 August 2021 University of Missouri-Columbia Research Reactor, Written Communication as Required by Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specifications 3.2.a ML21217A2982021-08-0505 August 2021 University of Missouri-Columbia Research Reactor - Reportable Event Report Pursuant to 20.2203(a)(2)(iv) ML21215A4982021-07-0707 July 2021 Univ of Missouri, Submittal of Revised Road Transportation Security Plan for the Shipment of Irradiated Reactor Fuel 2024-08-27
[Table view] Category:License-Operator
MONTHYEARML24270A0992024-10-0101 October 2024 Examination Confirmation Letter No. 50-186/Ol-25-01, University of Missouri - Columbia ML24142A1432024-08-27027 August 2024 Examination Result Letter No. 50-186/OL-24-02, University of Missouri - Columbia ML24142A1422024-08-27027 August 2024 Examination Report Letter No. 50-186/OL-24-02, University of Missouri - Columbia ML24044A1162024-03-0101 March 2024 Examination Confirmation Letter No. 50-186/OL-24-02, University of Missouri-Columbia ML23198A0222023-08-29029 August 2023 Examination Report Letter No. 50-186/OL-23-02, University of Missouri - Columbia ML23198A0232023-08-29029 August 2023 Examination Result Letter No. 50-186/OL-23-02, University of Missouri-Columbia ML23186A2132023-07-31031 July 2023 Examination Confirmation Letter No. 50-186/OL-23-03, University of Missouri - Columbia ML23124A0422023-05-0808 May 2023 Examination Confirmation Letter 50-186/OL-23-02, University of Missouri - Columbia ML23087A1142023-03-29029 March 2023 Examination Results Letter No. 50-186/OL-23-01, University of Missouri - Columbia ML23087A1132023-03-29029 March 2023 Examination Report No. 50-186/OL-23-01, University of Missouri-Columbia ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22013B1412022-01-21021 January 2022 Examination Confirmation Letter No. 50-186-OL-22-02, University of Missouri-Columbia ML21253A2482021-09-23023 September 2021 Examination Confirmation Letter No. 50-186/OL-22-01, University of Missouri Columbia ML21118A9682021-04-28028 April 2021 Examination Confirmation Letter No. 50-186/OL-21-01, University of Missouri-Columbia ML20238C0812020-09-28028 September 2020 Examination Report Letter No. 50-186/OL-20-01, University of Missouri-Columbia ML19304B6022019-11-0606 November 2019 Examination Report No. 50-186/OL-19-02, University of Missouri-Columbia ML19177A2512019-07-0303 July 2019 Examination Confirmation Letter No.50-186/OL-19-02, University of Missouri - Columbia ML19016A3162019-01-16016 January 2019 Examination Report No. 50-186/OL-19-01, University of Missouri - Columbia ML18299A0372018-10-26026 October 2018 University of Missouri - Columbia, Examination Confirmation Letter 50-186/OL-19-01 ML18200A1042018-08-0202 August 2018 Examination Report No. 50-186/OL-18-02, University of Missouri - Columbia ML18110A1212018-05-0101 May 2018 Examination Confirmation Letter No. 50-186/OL-18-02 University of Missouri - Columbia ML17279A8442017-10-11011 October 2017 Examination Confirmation Letter No. 50-186/OL-18-01, University of Missouri - Columbia IR 05000186/20170022017-03-28028 March 2017 Examination Confirmation Letter No. 50-186-17-02, University of Missouri - Columbia ML17034A2392017-02-23023 February 2017 Examination Report No. 50-186/OL-17-01, University of Missouri-Columbia ML16257A0062016-09-14014 September 2016 Examination Confirmation Letter, No. 50-186/OL-17-01, University of Missouri-Columbia ML16082A0372016-03-22022 March 2016 Examination Notification Letter No. 50-186/OL-16-02, University of Missouri-Columbia ML14114A4962014-05-0808 May 2014 Examination Report No. 50-186/OL-14-02, University of Missouri Research Reactor ML14008A2922014-01-0909 January 2014 Examination Notification Letter, 50-186/OL-14-02, University of Missouri Research Reactor ML13316B9482013-11-19019 November 2013 Examination Results Letter No.: 50-186/OL-14-01, University of Missouri-Columbia ML13316B6632013-11-19019 November 2013 Examination Report, No. 50-186/OL-14-01, University of Missouri Columbia ML13295A4102013-10-22022 October 2013 Examination Re-scheduled, No. 50-186/OL-14-01, University of Missouri-Columbia ML13233A0672013-08-27027 August 2013 Examination Notification Letter, No. 50-186/Ol-14-01, University of Missouri - Columbia ML13100A1682013-04-18018 April 2013 Examination Report No. 50-186/OL-13-01, University of Missouri - Columbia ML13100A1852013-04-18018 April 2013 Examination Results Letter No. 50-186/OL-13-01, University of Missouri - Columbia ML12243A1122012-08-30030 August 2012 Examination Report No. 50-186/OL-12-01, University of Missouri-Columbia ML1128404522011-10-18018 October 2011 Examination Results Letter No. 50-186/OL-11-02, University of Missouri Research Reactor ML1034403242010-12-16016 December 2010 Initial Examination Results Letter No. 50-186/OL-11-01, University of Missouri - Columbia ML1024500792010-09-16016 September 2010 Initial Examination Corporate Notification Letter, No. 50-186/OL-11-01, University of Missouri-Columbia ML0907100302009-03-17017 March 2009 Initial Examination Corporate Notification Letter, No. 50-186/OL-09-01, University of Missouri - Columbia ML0823809562008-09-0202 September 2008 Initial Exam Report No. 50-186/OL-08-03, University of Missouri - Columbia Reactor ML0815107122008-06-17017 June 2008 Initial Examination Results Letter No. 50-186/OL-08-02, University of Missouri - Columbia ML0735102192008-01-0202 January 2008 Initial Examination Results Letter No. 50-186/OL-08-01, University of Missouri - Columbia ML0718000682007-07-10010 July 2007 Initial Examination Results Letter No. 50-186/OL-07-02, University of Missouri-Columbia ML0708202942007-03-27027 March 2007 Initial Examination Corporate Notification Letter No. 50-186/OL-07-02, University of Missouri - Columbia ML0619402022006-07-14014 July 2006 Letter to Mr. Ralph A. Butler from Phillip T. Young Initial Examination Corporate Notification Letter No. 50-186/OL-07-01, University of Missouri - Columbia ML0532901702005-12-0606 December 2005 Initial Examination Results Letter No. 50-186/OL-06-01, University of Missouri - Columbia ML0520704042005-07-27027 July 2005 Initial Examination Corporate Notification Letter No. 50-186/OL-06-01, University of Missouri - Columbia, October 17, 2005 ML0506001842005-03-10010 March 2005 Initial Examination Results Letter No. 50-186/OL-05-01, University of Missouri - Columbia ML0433601812004-12-0303 December 2004 Initial Examination Corporate Notification Letter No. 50-186/OL-05-01, University of Missouri-Columbia ML0426705372004-10-0404 October 2004 Initial Examination Results Letter No. 50-186/OL-04-01, University of Missouri - Columbia 2024-08-27
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24270A0992024-10-0101 October 2024 Examination Confirmation Letter No. 50-186/Ol-25-01, University of Missouri - Columbia ML24142A1432024-08-27027 August 2024 Examination Result Letter No. 50-186/OL-24-02, University of Missouri - Columbia ML24142A1422024-08-27027 August 2024 Examination Report Letter No. 50-186/OL-24-02, University of Missouri - Columbia ML24044A1162024-03-0101 March 2024 Examination Confirmation Letter No. 50-186/OL-24-02, University of Missouri-Columbia ML23198A0222023-08-29029 August 2023 Examination Report Letter No. 50-186/OL-23-02, University of Missouri - Columbia ML23198A0232023-08-29029 August 2023 Examination Result Letter No. 50-186/OL-23-02, University of Missouri-Columbia ML23186A2132023-07-31031 July 2023 Examination Confirmation Letter No. 50-186/OL-23-03, University of Missouri - Columbia ML23124A0422023-05-0808 May 2023 Examination Confirmation Letter 50-186/OL-23-02, University of Missouri - Columbia ML23087A1132023-03-29029 March 2023 Examination Report No. 50-186/OL-23-01, University of Missouri-Columbia ML23087A1142023-03-29029 March 2023 Examination Results Letter No. 50-186/OL-23-01, University of Missouri - Columbia ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22013B1412022-01-21021 January 2022 Examination Confirmation Letter No. 50-186-OL-22-02, University of Missouri-Columbia ML21253A2482021-09-23023 September 2021 Examination Confirmation Letter No. 50-186/OL-22-01, University of Missouri Columbia ML21118A9682021-04-28028 April 2021 Examination Confirmation Letter No. 50-186/OL-21-01, University of Missouri-Columbia ML20238C0812020-09-28028 September 2020 Examination Report Letter No. 50-186/OL-20-01, University of Missouri-Columbia ML19304B6022019-11-0606 November 2019 Examination Report No. 50-186/OL-19-02, University of Missouri-Columbia ML19177A2512019-07-0303 July 2019 Examination Confirmation Letter No.50-186/OL-19-02, University of Missouri - Columbia ML18299A0372018-10-26026 October 2018 University of Missouri - Columbia, Examination Confirmation Letter 50-186/OL-19-01 ML18200A1042018-08-0202 August 2018 Examination Report No. 50-186/OL-18-02, University of Missouri - Columbia ML18110A1212018-05-0101 May 2018 Examination Confirmation Letter No. 50-186/OL-18-02 University of Missouri - Columbia ML17279A8442017-10-11011 October 2017 Examination Confirmation Letter No. 50-186/OL-18-01, University of Missouri - Columbia IR 05000186/20170022017-03-28028 March 2017 Examination Confirmation Letter No. 50-186-17-02, University of Missouri - Columbia ML17034A2392017-02-23023 February 2017 Examination Report No. 50-186/OL-17-01, University of Missouri-Columbia ML16257A0062016-09-14014 September 2016 Examination Confirmation Letter, No. 50-186/OL-17-01, University of Missouri-Columbia ML16082A0372016-03-22022 March 2016 Examination Notification Letter No. 50-186/OL-16-02, University of Missouri-Columbia ML14114A4962014-05-0808 May 2014 Examination Report No. 50-186/OL-14-02, University of Missouri Research Reactor ML14008A2922014-01-0909 January 2014 Examination Notification Letter, 50-186/OL-14-02, University of Missouri Research Reactor ML13295A4102013-10-22022 October 2013 Examination Re-scheduled, No. 50-186/OL-14-01, University of Missouri-Columbia ML13100A1852013-04-18018 April 2013 Examination Results Letter No. 50-186/OL-13-01, University of Missouri - Columbia ML13100A1682013-04-18018 April 2013 Examination Report No. 50-186/OL-13-01, University of Missouri - Columbia ML1128404522011-10-18018 October 2011 Examination Results Letter No. 50-186/OL-11-02, University of Missouri Research Reactor ML1034403242010-12-16016 December 2010 Initial Examination Results Letter No. 50-186/OL-11-01, University of Missouri - Columbia ML1024500792010-09-16016 September 2010 Initial Examination Corporate Notification Letter, No. 50-186/OL-11-01, University of Missouri-Columbia ML0907100302009-03-17017 March 2009 Initial Examination Corporate Notification Letter, No. 50-186/OL-09-01, University of Missouri - Columbia ML0823809562008-09-0202 September 2008 Initial Exam Report No. 50-186/OL-08-03, University of Missouri - Columbia Reactor ML0815107122008-06-17017 June 2008 Initial Examination Results Letter No. 50-186/OL-08-02, University of Missouri - Columbia ML0735102192008-01-0202 January 2008 Initial Examination Results Letter No. 50-186/OL-08-01, University of Missouri - Columbia ML0718000682007-07-10010 July 2007 Initial Examination Results Letter No. 50-186/OL-07-02, University of Missouri-Columbia ML0708202942007-03-27027 March 2007 Initial Examination Corporate Notification Letter No. 50-186/OL-07-02, University of Missouri - Columbia ML0619402022006-07-14014 July 2006 Letter to Mr. Ralph A. Butler from Phillip T. Young Initial Examination Corporate Notification Letter No. 50-186/OL-07-01, University of Missouri - Columbia ML0532901702005-12-0606 December 2005 Initial Examination Results Letter No. 50-186/OL-06-01, University of Missouri - Columbia ML0520704042005-07-27027 July 2005 Initial Examination Corporate Notification Letter No. 50-186/OL-06-01, University of Missouri - Columbia, October 17, 2005 ML0506001842005-03-10010 March 2005 Initial Examination Results Letter No. 50-186/OL-05-01, University of Missouri - Columbia ML0433601812004-12-0303 December 2004 Initial Examination Corporate Notification Letter No. 50-186/OL-05-01, University of Missouri-Columbia ML0426705372004-10-0404 October 2004 Initial Examination Results Letter No. 50-186/OL-04-01, University of Missouri - Columbia ML0417303442004-06-24024 June 2004 Initial Examination Corporate Notification Letter No. 50-186/OL-04-01, University of Missouri - Columbia ML0327606992003-10-23023 October 2003 Initial Examination Results Letter, No. 50-186/OL-03-02, University of Missouri - Columbia ML0324103192003-10-0303 October 2003 Retake Examination Results Letter, No. 50-186/OL-03-01R, University of Missouri-Columbia ML0309306442003-04-11011 April 2003 Initial Examination Results Letter, 50-186/OL-03-01, Univ. of Missouri-Columbia ML0301609072003-01-27027 January 2003 Initial Examination Corporate Notification Letter No. 50-186/OL-03-01, University of Missouri-Columbia 2024-08-27
[Table view] |
Text
October 11, 2017 Mr. Ralph Butler, Director Research Reactor Facility 1513 Research Park University of Missouri Columbia, MO 65211
SUBJECT:
EXAMINATION CONFIRMATION LETTER NO. 50-186/OL-18-01, UNIVERSITY OF MISSOURI - COLUMBIA
Dear Mr. Butler:
Arrangements were made with Robert Hudson for the administration of operator licensing examinations at the University of Missouri - Columbia. The written examinations and operating tests are scheduled for the week of December 4, 2017.
To meet this schedule, please furnish the material listed in Enclosure 1, Reference Material for Reactor/Senior Operator Licensing Examinations, in either hard copy to the address below or e-mail to Paulette.Torres@nrc.gov as soon as possible.
ATTN: Paulette Torres M/S O-12 D-20 U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738 , Administration of Written Examinations, describes your responsibilities for conducting written examinations. Enclosure 3, Procedures for the Administration of Written Examinations, describes applicant responsibilities during the administration of the written examination. Please ensure that all applicants are aware of these rules.
Your review of the written examination will be conducted in accordance with the procedures specified in Enclosure 4, Facility Review of Written Examinations.
Signed operator license applications in accordance with 10 CFR 55 Subpart D, Applications, certifying that all applicants have successfully completed the facility licensees requirements to be licensed as an operator or senior operator and that all applicants meet the medical requirements, must be submitted at least 14 days before the start date of the examination. This will allow the chief examiner time to review and process the applications. If this review cannot be completed in time to decide an applicants eligibility, that applicant will not be permitted to sit for the examination. Therefore, it is recommended that license applications be timely provided to ensure an appropriate level of review.
R. Butler The U.S. Nuclear Regulatory Commission (NRC) has posted copies of the application forms, Personal Qualification StatementLicensee (NRC Form 398), and Certification of Medical History by Facility Licensee (NRC Form 396), on the agencys Web site. The forms are in Adobe Acrobat format. https://www.nrc.gov/reading-rm/doc-collections/forms/nrc398.pdf https://www.nrc.gov/reading-rm/doc-collections/forms/nrc396.pdf Paperwork Reduction Act Statement This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB), approval numbers 3150-0018, 3150-0024 and 3150-0090.
The burden to the public for these mandatory information collections is estimated to average 7.45 hours5.208333e-4 days <br />0.0125 hours <br />7.440476e-5 weeks <br />1.71225e-5 months <br /> per combined response for completing the information collections. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.
If you have any questions regarding the examination procedures and requirements, please contact me at (301) 415-5656, or e-mail at Paulette.Torres@nrc.gov.
Sincerely,
/RA J.Nguyen for/
Paulette Torres, Chief Examiner Research and Test Reactors Oversight Branch Division of Licensing Projects Office of Nuclear Reactor Regulation Docket No. 50-186
Enclosures:
- 1. Reference Material for Reactor/
Senior Operator Licensing Examinations
- 2. Administration of Written Examinations
- 3. Procedures for the Administration of Written Examinations
- 4. Facility Review of Written Examinations cc: w/o enclosures: See next page
R. Butler EXAMINATION CONFIRMATION LETTER NO. 50-186/OL-18-01, UNIVERSITY OF MISSOURI
- COLUMBIA DATED OCTOBER 11, 2017.
DISTRIBUTION:
PUBLIC AMendiola AAdams STraiforos JEads ADAMS ACCESSION #:ML17279A844 TEMPLATE #: NRR-079 Office NRR/DPR/PROB/CE NRR/DPR/IOLB/OLA NRR/DPR/PROB/BC Name PTorres ABaxter AMendiola Date 10/03/2017 10/06/2017 10/11/17 OFFICIAL RECORD COPY
University of Missouri-Columbia Docket No. 50-186 cc:
Les Foyto, Associate Director Reactor and Facilities Operations University of Missouri - Columbia Research Reactor Center 1513 Research Park Drive Columbia, MO 65211 Homeland Security Coordinator Missouri Office of Homeland Security P.O. Box 749 Jefferson City, MO 65102 Planner, Dept of Health and Senior Services Section for Environmental Public Health P.O. Box 570 Jefferson City, MO 65102-0570 Deputy Director for Policy Department of Natural Resources 1101 Riverside Drive Fourth Floor East Jefferson City, MO 65101 A-95 Coordinator Division of Planning Office of Administration P.O. Box 809, State Capitol Building Jefferson City, MO 65101 Test, Research and Training Reactor Newsletter P.O. Box 118300 University of Florida Gainesville, FL 32611
REFERENCE MATERIAL FOR REACTOR/
SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS
- 1) Training materials including all substantive written material used to prepare applicants for initial reactor operator and senior reactor operator licensing. The material should include learning objectives, if available, and details presented during lectures, rather than outlines.
Training materials should be identified, bound, and indexed. Training materials should include the following:
(a) System descriptions including descriptions of all operationally relevant flowpaths, components, controls, and instrumentation. System training material should draw parallels to the actual procedures used for operating an applicable system.
(b) Learning objectives, student handouts, and lesson plans (including training manuals, facility orientation manual, system descriptions, reactor theory, thermodynamics).
(c) Complete and operationally useful descriptions of all safety-system interactions and secondary interactions under emergency and abnormal conditions, including consequences of anticipated operator error, maintenance error, and equipment failure.
(d) Training material used to clarify and strengthen understanding of emergency operating procedures.
- 2) Complete Procedure Index (including temporary procedures).
- 3) All administrative procedures as applicable to reactor operation or safety.
- 4) All integrated facility procedures, normal or general operating procedures, and procedures for experiments.
- 5) All emergency procedures, emergency instructions, and abnormal or special procedures.
- 6) Standing orders or procedures changed by reactor supervision and important orders or changes that are safety related and may supersede the regular procedures.
- 7) A list of all reactor facility surveillances, with copies of all COMPLETED surveillances which require the collection of data (e.g., heat balance, rod drop times).
- 8) Fuel-handling and core-loading procedures and initial core-loading procedure (if appropriate).
- 9) Any annunciator/alarm procedures, as applicable.
- 10) Radiation protection manual and radiation control manual or procedures.
Enclosure 1
- 11) Emergency plan and any emergency plan implementing procedures (EPIPs).
- 12) Safety analysis report, technical specifications, and interpretations, if available.
- 13) System operating procedures, including experiments.
- 14) Piping and instrumentation diagrams, electrical single-line diagrams, and flow diagrams.
- 15) Technical data book, and/or facility curve information, as used by operators and facility precautions, limitations, and setpoints.
- 16) Questions and answers specific to the facility training program, which may be used in the written or operating examinations (voluntary by facility licensee).
- 17) Facility modification authorizations, which were authorized since the last revision to the safety analysis report.
- 18) Additional material as requested by the examiners to develop examinations that meet the requirements of the research and test reactor examiner standards and regulations.
The above reference material should be approved, final issues and be so marked. If a facility has not finalized some of the material, the chief examiner should verify with the facility that the most complete, up-to-date material is available and that agreement has been reached with the licensee for limiting changes before the administration of the examination.
ADMINISTRATION OF WRITTEN EXAMINATIONS
- 1) A single room must be provided for administration of the written examination. This room and supporting restroom facilities should be located so as to prevent contact with other facility personnel during the written examination.
- 2) Minimum spacing is necessary to ensure examination integrity. The chief examiner will determine whether the room has adequate area to support minimum spacing between examination applicants to ensure examination integrity.
- 3) The chief examiner will review any arrangements made by the facility to give the applicants lunch, coffee, or other refreshments. These arrangements shall comply with Item 1 above.
- 4) The facility licensee may provide pads of 8.5 by 11-inch lined paper in unopened packages for the applicants use in completing the examination. The examiner will distribute these pads as needed.
- 5) Applicants may bring pens, pencils, calculators, or slide rules into the examination room.
Black ink or dark pencils should be used for writing answers to questions.
- 6) The chief examiner must approve any wall charts, models, training materials, equipment, or reference material present in the examination room.
- 7) The chief examiner will give the facility staff a copy of the written examination with answer key at the beginning of the examination. The facility staff will then have 5 working days to submit formal written comments with supporting documentation regarding written examination questions and answers to the chief examiner.
Enclosure 2
PROCEDURES FOR THE ADMINISTRATION OF WRITTEN EXAMINATIONS
- 1) Verify candidate identity.
- 2) Pass out examinations and handouts. Instruct applicants not to review examination until instructed to do so.
READ THE FOLLOWING INSTRUCTIONS VERBATIM:
- 1) Cheating on the examination means an automatic denial of your application and could result in more severe penalties.
- 2) When you have completed your examination, you must sign the statement at the bottom of the cover sheet. This indicates that the work is your own and you have not received or given assistance in completing the examination.
READ THE FOLLOWING INSTRUCTIONS:
With the start of the examination, you must comply with the following rules. These rules are in effect within the examination area, until the last candidate has handed in his or her examination:
- 1) Restroom trips are limited to only one applicant at a time. You must avoid all contact with anyone outside the examination room to preclude even the appearance of cheating.
- 2) Use black ink or dark pencil only to facilitate legible reproductions.
- 3) Print your name in the blank provided in the upper right corner of the examination cover sheet and each answer sheet.
- 4) Mark your answers on the answer sheet(s) provided.
- 5) The point value for each question is shown in brackets after the question.
- 6) If the intent of a question is unclear, ask questions of the examiner or proctor only.
- 7) There is a time limit of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per section of the written examination. For example, a one-section retake examination has a 1-hour time limit, while a normal three-section initial examination has a 3-hour time limit.
- 8) You must achieve a grade of 70 percent or greater in each category to pass the examination.
- 9) When turning in your examination, assemble the completed examination with examination questions, examination aids, answer sheets, and all scrap paper. Give the proctor your answer sheet(s) along with the signed cover sheet. Take all other material collected with you out of the examination area.
Enclosure 3
- 10) After turning in your examination, leave the examination area. If you are observed in this area while the examination is still in progress, your license may be denied or revoked.
- 11) During the examination you will be evaluated for your actions as if you were the actual watchstander. Please operate the reactor as if you were licensed, with the exception that you should announce your actions, and then pause momentarily to give the operator of record time to correct you or stop you, if necessary, before you actually perform the action.
In addition, the examiner will be observing that you meet all conditions of your license, (e.g., wearing corrective lenses to perform licensed duties).
FACILITY REVIEW OF WRITTEN EXAMINATIONS
- 1. At the option of the appropriate NRC management, the facility may review the written examination up to 2 weeks before its administration. This review may take place at the facility or an NRC office. The chief examiner will coordinate the details of the review with the facility. An NRC examiner will be present at all times during the review. The facility staff may not retain copies of the examination or any written notes. When using this option, the facility reviewers must sign the following statement before being allowed access to the examination.
- a. Pre-examination Security Agreement:
I ______________________ acknowledge that I have acquired specialized knowledge
[Print Name]
concerning the examination scheduled for ____________ at _____________________
[Print Date] [Print Facility Name]
as of the date of my signature below. I agree that I will not knowingly divulge any information concerning this examination to any unauthorized persons. I understand that I am not to participate in any instruction involving those applicants scheduled to be administered the above examination from this date until after the examination has been administered. I further understand that violation of the conditions of this agreement may result in the examinations being canceled and/or enforcement action against myself or the facility licensee by whom I am employed or represent.
Signature/Date In addition, the facility staff reviewers will sign the following statement after the written examination has been administered.
- b. Post-examination Security Agreement:
I _____________________ did not, to the best of my knowledge, divulge any
[Print Name]
Information concerning the examinations administered during the week of
_______ at _________________ or provide any instruction to those applicants
[Print Date] [Print Facility Name]
who were administered the examination from the date I entered into this security agreement until the completion of examination administration.
Signature/Date
- 2. The facility staff will be provided a copy of the examination and the answer key at the beginning of the examination. A copy will be kept of any pen and ink changes made to questions during the examination administration.
Enclosure 4
If members of the facility staff did not review the examination before its administration, they will have 5 working days from the day of the written examination to submit formal comments. If the facility staff reviewed the examination before its administration, they must submit any additional comments before the examiner leaves the facility. The reactor supervisor will address the comments to the chief examiner. The NRC will consider comments submitted after the required period on a case-by-case basis. This may cause delays in grading the examinations.
- 3. The facility licensee should submit comments in the following format:
- list the question section and number and state the comment along with a recommendation for correction (e.g., delete, two correct answers)
- support the comment with a reference and provide a copy of the reference if it was not included in the original reference material submitted NOTES:
- 1) No change to the examination will be made without a reference to support the facility comment. Provide any supporting documentation not previously supplied.
- 2) Comments made without a concise facility recommendation will not be addressed.
- 3) Comments not submitted within the requested time will be included in the grading process on a case-by-case basis as determined by the NRC. Comments not submitted within the requested time will delay the examination grading process.
- 4) NRC policy is to delete a multiple-choice question that has no correct answer or more than two correct answers and to give credit for either response for questions that have two correct answers.