Responds to NRC Re Violations Noted in Insp Rept 50-397/87-13.Corrective Actions:Review of Documentation Associated w/conditionally-released Matl Performed & Each Case Nonconformance Rept Dispositions Approved
ML17279A385
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/09/1987
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8707150690
Download: ML17279A385 (7)


Text

R ADULATORY INFORMATION DISTRI TION SYSTEM (RIDS) j ACCESSION NBR: 8707150690 DOC. DATE: 87/07/09 NOTARIZED:

NO DOCKET FACIL: 50-397 WPPSS Nuclear Progecti Unit 2i Washington Public Poee 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSENi Q. C.

Washington Public Power Supply System RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to NRC 870610 ltr re violations noted in Insp Rept 50-397/87-13. Corrective actions: review of documentation associated e/conditional)g-released matl performed

8. each case nonconformance rept dispositions approved.

DISTRIBUTION CODE:

IEOID COPIES RECEIVED: LTR J ENCL J SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

RECIPIENT ID CODE/NAME PD5 PD COPIES LTTR ENCL 1

1 REC IP IENT ID CODE/NAME SAMWORTHI R COPIES LTTR ENCL 2

2 INTERNAL:

ACRS DEDRO NRR ROE> M. L NRR/DREP/EPB NRR/DR IS DI R OQC/HDS2 RES DEPY QI XTERNAL:

LPDR NSIC 2

2 1

1 1

1 1

1 1

1 1

1 1

1 AEOD ENF LIEBERMAN NRR/DOE* DIR NRR/DREP/RPB N

S/ILRB FILE RGN5 FILE 01 NRC PDR 1

1 1

1 1

2 2

1 1

1 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 22 ENCL 22

Washington Public Power Supply System 30006eorgeWashington Way P.O. Box968 Richland, Washington99352-0968 (509)372-5000 July 9, 1987 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.C.

20555 NUCLEAR PLANT NO.

2 LICENSE NO.

NPF-21 NRC INSPECTION REPORT 87-13 The Washington Public Power Supply System hereby replies to the Notice of Violation contained in the subject Inspection Report dated June 10, 1987.

Our reply, pursuant to the provisions of Section 2.201, Title 10, Code of Federal Regulations, consists of this letter and Appendix A

(attached).

In Appendix A, an explanation of our position regarding the validity of the violation is provided.

Should you have any questions regarding our

response, please do not hesitate to contact me.

ii8 G. C,<Sorensen, Manager Regulatory Programs GCS/tmh Enclosures cc:

'JB Martin -

NRC RV RT Dodds -

NRC Site

, RB Samworth -

NRC 8707150690 870709 PDR ADOCK 05000397 8

PDR

Appendix A

Page 1 of 2 APPENOIX A During an NRC inspection conducted on May 18-22,

1987, a violation of NRC requirements was identified.

In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C

(1987),

the violation is listed below:

10 CFR 50, Appendix 8, Criterion V, states in part, "Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures or drawings."

Operational

(}uality Assurance Program Description (WPPSS-(}A-004),

Revision 11, dated April 22, 1987, Section 5.2.1 states, "Activities that affect safety-related functions of plant items shall be described by and accompli shed through implementation of documented procedures, instructions, or drawings, as appropriate."

(}uality Assurance/guality Control Instruction No. P(}C-09, Revision 5, dated January 31, 1986, entitled "Receiving Inspection," Section 3.4.3, states in part, that "Receiving inspector...fills out Conditional Release Tag...with the applicable NCR number authorizing conditional release".

Contrary to the above, during the period of August 1985 through January

1987, on four occasions Conditional Release Tags were completed hy the receiving inspector prior to disposition of the applicable NCR' authorizing conditional release.

The conditional release materials were controlled under Purchase Order Nos,

075190, 082262, 085260 and 081961.

This is a Severity Level IV Violation.

Validity of Violation The Supply System acknowledges the validity of this violation.

Corrective Steps Taken/Results Achieved A review of documentation associated with the conditionally-released material was performed and, in each case, the Nonconformance Report dispositions had been approved and the limitations corrected prior to declaration of operability.

As a result, it has been confirmed that this problem was an administrative controls issue in that the conditional release tags were filled out prior to receipt of the approved Nonconformance Report.

Appendix A

Page 2 of 2 Corrective Action to be Taken Plant Procedure 1.3.12, "Plant Problems,"

and Plant

(}C Procedure P(C-09, "Receiving Inspection", will be revised to more clearly explain the existi ng levels of control and approval required for the conditional release of safety-related items.

2.

Plant gC Inspectors, Maintenance Engineers and Technical Engineers who initiate or process conditional releases will be provided training on the conditional release of safety-related items.

Date of Full Compliance October 30, 1987

'