ML17279A369

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting on 870706 in Region V Ofc.Mgt Meeting Agenda Encl
ML17279A369
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/29/1987
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML17279A368 List:
References
NUDOCS 8707080081
Download: ML17279A369 (3)


Text

~gg AE'g~C 1p0 n )t**~4 l o UNITED STATES NUCLEAR REGULATORY COMMISStON REGION V 1450 MARIALANE.SUITE 210 WALNUTCREEK, CALIFORNIA94596 June 29, 1987 NOTICE OF SIGNIFICANT LICENSEE MEETING Name of licensee:

Washington Public Power Supply System Name of Facility:

WNP-2 Docket Number:

50-397 Date and Time of Meeting:

Location of Meeting:

NRC Attendees:

Licensee Attendees:

July 6, 1987, 12:00 noon Region V Conference Room, Walnut Creek, California J.

B. Martin, Regional Administrator D. F. Kirsch, Director, Division of Reactor Safety and Projects R. A. Scarano, Director, Division of Radiation Safety and Safeguards G.

W. Knighton, Director, Project Directorate V,

NRR A. E. Chaffee, Deputy Director, Division of Reactor Safety and Projects P.

H. Johnson, Chief, Reactor Projects Section 3

R. T. Dodds, Senior Resident Inspector, WNP-2 R. B. Samworth, Licensing Project Manager, NRR C. J. Bosted, Resident Inspector, WNP-2 J. 0. Bradfute, Project Engineer, NRR C.

W. Caldwell, Project Inspector D.

W. Mazur, Managing Director, J.

W. Shannon, Deputy Managing Director R.

G. Glasscock, Director, Licensing and Assurance C.

H. McGilton, Manager, Operational Assurance Program D. S.

Feldman, Manager, Plant guality Assurance C.

M. Powers, Plant Manager J.

W. Baker, Assistant Plant Manager NOTE:

Attendance at this meeting by'RC personnel other than those listed above should be made known by July 1, 1987 via telephone call to P. Johnson, FTS 463-3745.

CC '-

NRC Participants Listed Above D. M. Crutchfield, NRR G. Holahan, NRR B. H. Faulkenberry, RV G.

N. Cook, RV S. A. Richards, RV 8707080081 870629 PDR ADOCK 05000397 P

PDR

MANAGEMENT MEETING WASHINGTON PUBLIC POWER SUPPLY SYSTEM July 6, 1987 AGENDA 1.

Opening

Remarks, Purpose of Conference J.

B. Hartin, Regional Administrator, and D.

W. Hazur, Supply System Managing Director 2.

Presentations by Supply System Management Reactor scram and reactor vessel overfill of March 22, 1987 (including discussion of root cause analysis program)

Procedural compliance program gA/gC involvement in operations Significant activities during 1987 refueling outage SALP improvement program Update of actions in response to August 1986 enforcement conference 3.

Issues of current NRC interest Restoration of equipment to service following maintenance/testing Radiation Protection staffing during refueling outages Process for changing licensing basis documents (FSAR/Tech Specs) 4.

Other topics of interest 5.

Closing remarks

~ ~

'