Forwards Draft NRR Input to SALP Rept for Facility Re Util Licensing Activities from Feb 1986 - May 1987,based on Numerous Reviewer & NRR Project Mgt Observations.Category 2 Level Proposed for Overall Performance in Functional Area
ML17279A359
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/26/1987
From: Bradfute J
Office of Nuclear Reactor Regulation
To: Crutchfied D, Holahan G
Office of Nuclear Reactor Regulation
References
TAC-65367, NUDOCS 8707020291
Download: ML17279A359 (4)


Text

~ ~

870702029i 870h26 PDR ADOCK 05000397 p

PDR Docket No.:

50-397 26 JUN 1987 MEMORANDUM FOR:

Dennis M. Crutchfield, Director Division of Reactor Projects - III, IY, V and Special Projects Gary M. Holahan, Assistant Director for Regions III and V

Division of Reactor Projects - III, IV, V and Special Projects DISTRIBUTION NRC 5 Local PDRs JLee PD5 Memo THRU:

FROM:

SUBJECT:

Geo} ge W. Knighton, Director Project Directorate V

Division of Reactor Projects - III, IV, Y and Special Projects John 0. Bradfute, Project Manager Project Directorate V

Division of Reactor Projects - III, IV, V and Special Projects WNP DRAFT SALP REPORT FOR WPPSS (TACO'5367)

Enclosed is the draft NRR input to the SALP Report for WNP-2, covering the Supply System's licensing activities from February 1, 1986 through May 31, 1987.

The report was prepared on the basis of numerous reviewer inputs as well as observations by NRR project management during interactions with the Supply System.

The proposed overall performance of the Supply System in the functional area of Licensing Activities is at a Category 2 level.

Although this rating is the same as the rating given in the previous SALP report, an overall improvement trend is noted.

Your review and comments are requested by COB July 1, 1987.

1 Also provided is a summary matrix of ratings for Licensing Activities as developed by the individual NRR reviewers.

(See Attachment 2)

Contact:

John 0. Bradfute X24679 1

1

~ ~

1 V

pp I

'I

'I J

r,

The NRC SALP Board meeting for WNP-2 is scheduled for July 7, 1987.

George W. Knighton is the SES representative for NRR.

Enclosures:

1.

Summary Tables 2.

Draft NRR SALP Report Orighesl~ gy John 0. Bradfute, Project Manager Project Directorate V

Division of Reactor Projects - III, IV, V and Special Projects cc: