ML17279A231

From kanterella
Jump to navigation Jump to search
Forwards Washington Nuclear Plant 2 Performance Indicator Rept, for Mar 1987 in Response to Request Generated During Meeting in mid-Mar
ML17279A231
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/22/1987
From: Shannon J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Bradfute J
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17279A232 List:
References
NUDOCS 8704290313
Download: ML17279A231 (4)


Text

j REGU ORY INFORMATION DISTRIBUT 3 SYSTEN (RIDS)

ACCESS r/

ON NEBR:

FACIL: 50-397 8704290313 WPPSS DOC. DATE: 87/04/22 0 TAR I ZEO: NO 'OCKET Nuclear Pro Jectl Unit ZI Washington Public Poue,050003'97 8

AUTH. NANE AUTHOR AFFILIATION SHANNONI J. W. Washington Public Power Supply System RECIP. MANE RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards "Washington Nuclear Plant 2 PerFormance Indicator Rept Nar 1987I" in response to request generated during meeting in mid-Nar.

DISTRIBUTION CODE: *QDID COPIES RECEIVED: LTR TITLE: OR Submittal: General Distribution j ENCL ~ SIZE: t +

NOTES:

RECIPIENT COPIES REC IP IENT COPIES ID CODE/MANE LTTR ENCL ID CODE/MANE LTTR ENCL PD5 LA 1 0 PD5 PD 5 5 SAMWQRTHI R 1 1 INTERNAL: ACRS 6 6 ARN/DAF/L'FNB 1 0 NRR/DEBT/ADE 1 1 NRR/DEST/ADS 1 1 NRR/DOEA/TSB 1 1 NRR/P S/ILRB 1 OGC/HDSZ 1 0 FILE 01 1 1 EXTERNAL: EG5G BRUSKEI S 1 1 LPDR NRC PDR 1 1 NSIC TOTAL NUNBER OF COP IES REQUIRED: LTTR 24 ENCL. 21

~,

If I

I If 1 II V,

r a P

~T I

I'f f

  • ft ff

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 April 22, 1987 903>~ 87p422 ADOCK pgpppg9y Docket No. 50-397 PDR Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: John 0. Bradfute

Dear Sir:

Subject:

WNP-2 PERFORMANCE INDICATOR REPORT MARCH 1987 Enclosed is a copy of the WNP-2 Performance Indicator Report for March 1987. This submittal is in response to a .request generated during meet-ings at Washington Public Power Supply System's No. 2 plant in mid-March.

Very truly yours, J. W. Shanno Acting Assistant Managing Director for Operations GHG:lg Enclosure cc: John B. Martin/NRC Region V pp(

II 1

I