Notification of 870113-15 Meetings W/Util in Richland,Wa to Review & Inspect Fire Protection Program.Meeting Agenda & Summary of NRC Fire Protection Concerns Encl
ML17278B157
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/06/1987
From: Bradfute J
Office of Nuclear Reactor Regulation
To: Adensam E
Office of Nuclear Reactor Regulation
References
NUDOCS 8701090058
Download: ML17278B157 (10)


Text

87010'70058 870106 I PDR ADQCK 05000397 PD~

January 6,

1 Docket No. 50-397 MEMORANDUM FOR:

Flinor G. Adensam, Director BWR Project Directorate No.

3 Division of BWR Licensing FROM:

SUBJECT:

Date

& Time Location:

Purpose:

John 0. Bradfute, Project Manager BWR Project Directorate No.

3 Division of BWR Licensing FORTHCOMING MEETING WITH WASHINGTON PUBLIC POWER SUPPLY SYSTEM (WPPSS)

ON FIRE PROTECTION PROGRAM AT WNP-2 Tuesday through Thursday, January 13 - 15, 1987 8:00 a.m to 5:00 p.m.

WNP-2 Plant Facilities Richland, Washington To review and inspect the Fire Protection program at WNP-2 (See Attached Agenda)

Participants:

NRC W. Houston E.

Adensam G.

Hulman K. Campe J. Ridgely J. Bradfute D. Kirsch S. Richards C.

Ramsey R.

Dodds SUPPLY SYSTEM C.

Powers G. Sorensen P.

Powell

/s/

cc:

See next page John 0. Bradfute, Project Manager Project Directorate No.

3 Division of BWR Licensing

  • Meetings between NRC technical staff and applicants for licenses are open for interested members of the public, petitioners, intervenors or other parties to attend as observers pursuant to "Open Meeting'Statement of NRC Staff Policy."

42 ~Fd 1

2 1

28858, 6/28/18.

$8%

JBradfute/vag 01/5 /87 D:

1 -

.WBL EA am 01/t /87

R r

, ~

I I ~

F R'lf I Rll'FR" fl

'I r, Irh ~

k" Il F

R Il R

I<< ll ~ ~

l rl(q r'&I1'4-Ra f

1 h

~

I hi r,,

R I

~ 1 Ih I

R 'rh hl rh I

R ~

Fh f I I ~ '

'I Ik

~ ~

Mr. G.

C. Sorensen, Manager Washington Public Power Supply System WPPSS Nuclear Project No.

2 (WNP-2)

CC:

Nicholas S. Reynolds, Esq.

Bishop, Liberman, Cook, Purcell II Reynolds 1200 Seventeenth

Street, N.W.

Washington, D.C.

20036 Mr. G. E. Doupe, Esquire Washington Public Power Supply System P. 0. Box 968 3000 George Washington Way Richland, Washington 99532 Mr. Curtis Eschels, Chairman Energy Facility Site Evaluation Council Mail Stop PY-11 Olympia, Washington 98504 P. L. Powell, Licensing Manager Washington Public Power Supply System P. 0.

Box 968, MD 956B Richland, Washington 99352 Mr. W. G.

Conn Burns and Roe, incorporated c/o Washington Public Power Supply System P. 0.

Box 968, MD 994E Richland, Washington 99352 R. B. Glasscock, Director Licensing and Assurance Washington Public Power Supply System P. 0.

Box 968, MD 280 Richland, Washington 99352 Mr. C.

M. Powers WNP-2 Plant Manager Washington Public Power Supply System P. 0.

Box MD 927M Richland, Washington 99352 Regional Administrator, Region V

U.S. Nuclear, Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596

~ ~

~

~

l 8

4 II C

'lU

AGENDA WNP-2 SITE VISIT re: Fire Protection 13 - 15 January 1987

Tuesday, 13 January 8:00 a.m Supply System presentation to NRC:

What constitutes the WNP-2 Fire Protection Program What are fire'rotection safety issues from SS perspective What are SS plans and programs for modifications Why plant is safe to operate Identify and clarify specific concerns as identified in attached outline I

Scope activities for Begin walk downs and resolving NRC concerns insp'ections of identified NRC concerns Wednesday, 14 January 8:00 a.m.

Complete walk downs and inspections

Thursday, 15 January 8:00 a.m Exit interview with -Supply'ystem

'I I

II )4

~ ~

C)V,A

= e,

/) ~ ~ '

t II '1

~ g 1

t

+et II t yI

>. I'I I

~

,J I

1 II

)l I

)i I

)Il I

SUMMARY

OF NRC FIRE PROTECTION CONCERNS AT WNP-2 Issues to Discuss with the Supply System and to Inspect at WNP-2:

Verification that the current control room evacuation procedure has the appropriate modifications implemented Review the time requirements to initiate ADS operation Inspect the adequacy of the Division I and ADS transfer switches "Ring out" two circuits and "walk down" each of the two cables Inspect the transfer switches for the SM-8 cabinets Review the results of the high impedance fault analysis which was scheduled for completion January 1,

1987 Review the licensee's "best efforts" to have the fire water line modifications complete prior to restart following the next refueling outage I

Walk down the fire water lines and the locations of the proposed modifications Review the NFPA opinion on the fire line under the diesel generator building Walk down the locations of the MCCs for the RHR-V-8 and RHR-V-9 valves and the pressure interlocks Evaluate the fire loading in the control room Walk through the plant with Supply System personnel identifying the locations of new and previously existing emergency lighting Review the status of overall program for upgrading emergency lighting Review the status of the fire protection evaluation by the Supply System's contractor with specific reference to the locations of smoke detectors

hl lrh

~ T Th ~ 4'y n

II 1

I II I

Irr I'

h It/

'I'I I

h I

II

',I

<<>>4 h

I T'

~

rr'y h

I'

'I f 'If h.

r'l hl t

I r hit Ill h

I e'

Jan<<Q',

1987 y ~

MEETING NOTICE DISTRIBUTION Docket No.(s,),:,

50=397 ~

NRC PDR Local PDR PRC System BWD 83 r/f ORAS PPAS/TOSH H. Denton OPA D. Mossburg

Attorney, OGC E. Jordan B. Grimes J. Partlow Receptionist (Only if meeting is held in Bethesda)

Project Manager J.

Brad E. Hylton NRC Partici ants W. Houston E. Adensam G. Hulman K. Campe J. Ridgely J. Bradfute D. Kirsch S. Richards C.

Ramsey R.

Dodds bcc:

Applicant

& Service List

~ ~