Notification of 860715-18 Site Visit to Permit NRC & Contractor Auditors to Evaluate Organization,Process & Results of Dcrdr.Tentative Agenda Encl
ML17278A922
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/10/1986
From: Bradfute J
Office of Nuclear Reactor Regulation
To: Adensam E
Office of Nuclear Reactor Regulation
References
NUDOCS 8607170369
Download: ML17278A922 (10)


Text

Docket Nos.

50-397 8607170369 860710 PDR ADOCK 05000397 P

PDR July 10, 1986 MEMORANDUM FOR:

Elinor G. Adensam, Director BWR Project Directorate No. 3, DBL FROM:

SUBJECT'ohn

0. Bradfute, Project Manager BWR Project Directorate No. 3, DBL FORTHCOMING SITE VISIT AND EXIT BRIEFING FOR PREIMPLEMENTA-TION OF THE WNP-2 DETAILED CONTROL ROOM DESIGN REVIEW DATE E( TIME:

Site Visit Exit Briefing 9:00 a.m. Tuesday, July 15, 1986 through 12:00 p.m. Friday, July 18, 1986 1:00 p.m. - 3:00 p.m. Friday, July 18,.1986 LOCATION:

PURPOSE:

WNP-2 Plant Site Richland, Washington To permit NRC and contractor auditors to evaluate the organization, process and results of the Supply System's Detailed Control Room Design Review (see attached agenda).

PARTICIPANTS:

NRC D. I. Serig, NRR M. J.

Campagnone, NRR J. 0. Bradfute, NRR J. Stohley, SAIC L. Siu, SAIC M. Good, COMEX Su 1

S stems P. L. Powell G. J.

Freeman R.

G. Davalle H. L. Aeschliman

Enclosure:

Agenda cc:

See next page

/S/

John 0. Bradfute, Project Manager BWR Project Directorate No. 3, DBL D

WD

DBL E d sam y/~c/86
  • Meetings between

'NRC technical staff and licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy", 43 Federal Re ister 28058, 6/28/78.

The Exit Briefing is a meeting between NRC anent e

icensee; however, for security reasons, the faci1ity may not be open to the public.

Interested persons should contact the NRC Project Manager, John 0. Bradfute at (301) 492-9414 at least 2 working days in advance of the meeting.'wD-3.

JBradfute/hmc 7/go /86

'l T

V jH 4

w F

~

1'

Mr. G.

C. Sorensen, Manager Washington Public Power Supply System WPPSS Nuclear Project No.

2 (WNP-2)

CC:

Nicholas S.'eynolds, Esq.

Bishop, Liberman,

Cook, Purcell 5 Reynolds 1200 Seyenteenth
Street, N.W.

Washington, D.C.

20036 Mr. G. E. Doupe, Esquire Washinqton Public Power Supply System P. 0.

Box 968 3000 George Washington Way Richland, Washington 99532 Mr. Curtis Eschels, Chairman Energy Facility Site Evaluation Council Mail Stop PY-ll Olympia, Washington 98504 P. L. Powell, Licensing Manager Washington Public Power Supply System P. 0.

Box 968, MD 956B Richland, Washington 99352 Mr. W. G.

Conn Burns and Roe, Incorporated c/o Washington Public Power Supply System P. 0. Box 968, MD 994E Richland, Washington 99352 R. B. Glasscock, Director Licensing and Assurance Washington Public Power Supply System P. 0.

Box 968, MD 280

Richland, Washington 99352 Mr. C.

M. Powers WNP-2 Plant Manager Washington Public Power Supply System P. 0.

Box MD 927M

'ichland, Washington 99352 Regional Administrator, Region Y

U.S. Nuclear Requlatorv Commission 1450 Maria Lane, Suite ?10 Walnut Creek, California 94596

0

'(~

ENCLOSURE TENTATIVE AGENDA WNP-2 DETAILED CONTROL ROOM DESIGN REVIEW PREIMPLEMENTATION AUDIT

Tuesday, July 15, 1986 AM NRC entry briefing (Serig)

WPPSS presentation on DCRDR a ~

b.

DCRDR status Participation of multidisciplinary review team c.

Coordination with EOP upgrade, Reg.

Guide 1.97,

SPDS, and training d.

Overview of WNP-2 emergency and operating,

'systems Visit control'room Lunch t

PM Audit of system, function, and task analyses, and comparison of,display and control requirements with control room inventory (Stokley, Good)

Audit of HEDs and proposed corrections (Serig, Lam)

Audit team meeting Feedback to WPPSS as necessary Wednesday, July 16, 1986 AM Audit of operating experience (Stokley, Good)

Audit of HEDs'and proposed corrections (Serig, Lam)

Lunch

'I PM Audit of control room survey (Stokley, Good)

Audit of HEDs, and proposed corrections (Serig, Lam)

Audit team meeting I

Feedback to WPPSS as necessary

l'

Thursday, July 17, 1986 AM Audit of HED assessment process (Stokley, Lam)

Audit of SPDS (Serig, Good)

Lunch PM Audit of selection and verification of design improvements (Stokley, Lam)

Audit of SPDS (Serig, Good)

Audit team meeting Feedback to WPPSS as necessary Friday, July 18, 1986 AM Audit team meeting Technical meeting between WPPSS and NRC Audit

'eam Lunch PM Exit briefing (Serig) a.

DCRDR b.

SPDS Audit Team:

Dennis Serig - NRC, human factors engineering John Stokley - SAIC, mechanical engineering Lam Siu - SAIC, human factors engineering Mark Good - COMEX, operations

lj

~

~

, July 10, 1986 MEETING NOTICE DISTRIBUTION J)ocket No: 50-397 NRC PDR Local PDR PRC System BWD ¹3 r/f ORAS PPAS/TOSB H. Denton OPA D. Mossburg

Attorney, OELD E. Jordan B. Grimes J. Partlow Project Manager E. Hylton J. Bradfute NRC Partici ants D. I. Serig M. J.

Campagnone J. Bradfute J. Stohley, SAIC L. Siu, SAIC M. Good, COMEX bcc:

Applicant 8 Service List

T il I

k P'

tl