ML17277B694

From kanterella
Jump to navigation Jump to search

Amend 8 to License NPF-21,revising License Condition 2.C(28) to Extend Deadline to 851130 for Environ Qualification of Certain Electrical Equipment Important to Safety
ML17277B694
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/28/1985
From: Harold Denton
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17277B695 List:
References
TAC-56827, TAC-57169, NUDOCS 8504090392
Download: ML17277B694 (5)


Text

~pg Racy, vg UNITED STATES NUCLEAR R EG ULATORY COMMISSION WASHINGTON, D. C. 20555 WASHINGTON PUBLIC POWER SUPPLY SYSTEM DOCKET NO. 50-397 WPPSS NUCLEAR PROJECT NO.

2 AMENDMENT TO FACILITY OPERATING LICENSE License No. NPF-21 Amendment No. 8 1.

The Nuclear Regulatory Comission (the Commission or the NRC) has found that:

A.

The application for amendment filed by the Washington Public Power Supply System (WPPSS, also the licensee) dated January 11 and January 17, 1985 and supplemented on January 30 and March 8, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application as

amended, the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance:

(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, Facility Operating License No.

NPF-21 is amended.

Attachment 2, Paragraph 3.(b) of L.C. 2.C.(16) to the license and License Condition 2.C.(28) are hereby amended as follows:

Attachment 2

Para ra h 3.

b The licensee shall implement (installation or upgrade) requirements of R.G.

1.97 Rev.

2 for flux monitoring prior to startup following the first refueling outage.

(28) Environmental ualification Section 3.11

SER, SSER 83, SSER II4 Prior to November 30, 1985, the licensee shall environmentally qualify all electrical equipment according to the provisions of 10 CFR 50.49.

8504090392 850328 PDR ADOCK 05000397 P

PDR

T~'m

$ (,

0 !"

k

)p". )i )

3 1

I e

S 3.

This amendment is effective as of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Date of Issuance:

hing 28

~g8g

'i 4l'a')30. a>.,

Office of N 'clear Reactor Regulation

L 3.

This amendment is effective as of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION f

oate of Issuance: jsig SI I((

Original signed bV Darrell G. Eiseahut Harold R. Denton, Director Office of Nuclear Reactor Regulation

  • Previous concurrence concurred on by:

LB¹2/DL/PM

  • RAuluck:lb 03/22/85 DD/

DE'

/

/85 LB¹2/DL/LA

  • EHylton 03/22/85 D

NRR 3/Q/85 LB¹2/DL/BC

  • ASchwencer 03/22/85 OELD AD/L/DL D/DL
  • Shields
  • TNovak
  • HThompson 03/22/85 03/26/85 03/27/85

I

/I t

3I g

'I

'q sA

> Wp

~

g p 'l

'gl y 1

~

~,~

II A /

fl<~'

~

"Q ia

',~'\\

g>> ~i VI ',+E 4

~

~

lk

~ ' I'l Q

A f%

F f 0

C

~ w'pi~ L

~ 4 (A$ fa)g$

'1

'I j(

I 1

l

)

\\'

tf