REGULATORY i ORMATION DISTRIBUTION SYS
~ (RIDS)
ACCESSION NBR:8402160449 DOC,DATE: 84/02/08 NOTARIZED:
NO DOCKET FACIL:50-397 WPPSS Nuclear Projects Unit 2r Washington Public Powe 05000397 AUTH BYNAME AUTHOR AFFILIATION SORENSENrG.CD washington Public Power Supply System
'RECIP ~ NAME 'ECIPIENT AFFILIATION 4,
SCHWENCERrA ~
Licensing Branch 2
SUBJECT:
Submits final summary of induction heating stress impr ovement 'rogr amiper Rev 1 to NUREG-0313 8 util 830914 l tr
~ Total of 214 welds in reactor r ecir cul ation 8
RHR l'ev I ewed>>
DISTRIBUTION CODE:
BOOIS COPIES RECEIVED:LTR ENCL Q
SIZE:
CPL TITLE: Licensing Submittal:
PSAR/FSAR Amdts S Related Cerrespendence NOTES:
RECIPIENT ID CODE/NAME NRR/DL/ADL NRR LB2 LA INTERNAL: ELD/HDS2 IE/DEPER/EPB 36 IE/DQASIP/QAB21 NRR/DE/CEB 11 NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB 24 NRR/OHFS/HFEB40 NRR/DHFS/PSRB NRR/DSI/AEB 26 NRR/DSI/CPB 10 NRR/DSI/ICSB 16 NRR/DSI/PSB 19 NRR/DSI/RSB 23 RGN5 EXTFRNAL: ACRS 41 DMB/DSS (AMDrS)
LPDR 03 NSIC 05 COPIES LTTR ENCL 1
3 1
1 2
1 11' 1
1 1
1 6
1 1
RECIPIENT ID CODE/NAME NRR LB2 BC, AULUCKiR~
01 IE FILE IE/DEPER/IRB 35 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DSI/ASB NRR/DSI/CSB 09 NRR/DSI/METB 12 NRR RAB 22 04 OAMI/MIB BNL (AMDTS ONlY)
FEMA REP DIV 39 NRC POR 02 NTIS COPIES LTTR ENCL 1
1 1
1 1
1 2
c 1
1 1
1 1
1 1
1 1
(
1 1
1 1
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 53 ENCL
W II' 1,
f
)
I jj 5 f I IjiiW W
)cw<<,c W
lr f WI,'i ~
f PW4 II il k W lt l!',5l >I I}
I l
W Ir
'lc<<> P W'
I CiiM
~ f,l rl f
'k I i<<),Ill jlllrhf 4 Jkl
<ll f
'g I'5 br<<ill I nfl'"'
I'>>
k
I+'.
W "Ir'<<I f'fI'l lfff pg f5 5'1 wf tl)0 WI j'9 Irljf r 'I i ff
)lcj y t ~
&F5 wr
<<<<e <<A<<<<ma<<-ps+
~I ";k W W f i I j 5, F5 I, P Ig <<'0
,IV,"',; lgr j
II I
I j,I"lil,,'Wll, w>I"lfI II r5, II '5,'ll<< <<5 l,j
', 3g j
f
'o'a fI'p H'I I
f w'illl'
+ f i,t ~
i'W II n<<
l,gih I rjf/
I i,' j fc,k II '
')f'l J (l
$ 5 ll<<
I I)lf r j I)f+'j J
I lf 1WW>>
)
j h<<I l'hi'l I, JC' fC JI f,t Jf.
'if
)II, fl j II+
5r I 1}C,
'f I'!W,,
I, C'j<<P.
I/ifi ISA
( Wf.),',I i, ) lj
.'FI)I fj,
'l,l(
'i gh g e, 1
Pi'.
I/51 j W
'c
<<<<i W
r 1
I 1
Washington Public Power Supply System P.O. Box 968 3000George Washington Way Richland, Washington 99352 (509) 372-5000 G02-84-67 February 8, 1984 Docket No. 50-397 Director of Nuclear Reactor Regulation Attention:
Nr. A. Schwencer, Chief Licensing Branch No.
2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555 8402ih0449 840208 PDR ADOCK 05000397
'P PDR
Dear Nr. Schwencer.:
Subject:
Reference:
NUCLEAR PLANT NO.
2 UPDATE ON IMPLEMENTATION OF NUREG-0313, REVISION 1 Letter, G02-83-833, G.
C. Sorensen (SS) to A. Schwencer (NRC),
same subject, dated September 14, 1983 The reference letter forwarded an update of the Supply System response to NUREG-0313, Rev.
1.
The letter described the Induction Heating Stress Improvement program initiated to augment the Supply System position.
The IHSI program has been completed.
The final program summary is as follows:
o Originally 204.welds in the Reactor Recirculation (RRC) and Residual Heat Removal (RHR}'ystems, were identified for review.
On completion, 214 welds (including 10 RPV discharge nozzle to safe end welds not originally reported) were reviewed.
o Thirty-eight (38} welds.were originally found to be properly treated for protection from IGSCC and classified as conforming.
On completion, a
total of, 50,.welds were classified as conforming.
(Ten RPV discharge nozzle to safe end welds not originally reported were classified as conforming, plus 2 welds originally considered non-conforming were reevalua'ted and..reclassified as conforming.)
h
A. Schwencer
~ Page Two February 8, 1984 UPDATE ON IMPLEMENTATION OF NUREG-0313, REVISION 1 o
One hundred and fifteen (115) welds were originally classified as non-conforming and scheduled for treatment.
The 2 welds discussed above were reclassified leaving 113 welds treated on completion of the program.
The program has been completed with no fur ther changes to the program described in the referenced letter.
Should you have any questions, please contact Mr. P. L. Powell, Manager, WNP-2 Licensing.
Very truly yours, G.
C.
- orensen, Manager Regulatory Programs PLP/tmh cc:
R Auluck -
NRC
=WS Chin
F