Text
I REGULATORY ORMATION DISTRIBUTION SYS (RIDS)
ACCESSION NBR:8402160447 DOC SEDATE: 84/02/08 NOTARIZED:
YES DOCKET FACIL:50 397 I'/PPSS Nuclear Project~
Unit 2i I'lashington Public Powe 05000397 AUTH BYNAME AUTHOR AFFILIATION SORENSENrG>>CD liashington Public Power Supply System RECIP ~ NAME RECIPIENT AFFILIATION SCHNENCERgA ~
Licensing Branch 2
SUBJECT; Mod to 840120 application to amend License NPF-21irevising Tech Specs to allow flexibility to perform more than one diesel generator cold start test per 184 days'ISTRIBUTION CODE:
8001S COPIES RECEIYED:LTR Q ENCL, ~
SIZE:, '3+LQ5 TITLE: Licensing Submittal:
PSAR/FSAR Amdts 8, Related Correspondence'OTES:
RECIPIENT ID CODE/NAME NRR/DL/ADL NRR L82 lA INTERNAL: ELD/HDS2 IE/DEPER/EPB 36 IE/DQASIP/QAB21 NRR/DE/CEB 11 NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB'4 NRR/DHFS/HFEB40 NRR/DHFS/PSRB NRR/DSI/AEB 26 NRR'/DSI/CPB 10 NRR/DSI/ICSB 16 NRR/DS I/PSB 19 NRR/DS I/RSO 23 RGNS EXTERNAL; ACRS 41 DMB/DSS (AMDTS)
LPDR 03
- NSfC, 05 COPIES LTTR ENCl 0
0 1
0 3
3 1
1 1
1 2
2 1
1 1
1
.1 1
1 1
1 1
1 1
1 1
1 3
3 6
6 1
1 1
1 1
1 REC IP IENT ID CODE/NAME NRR LB2 BC AULUCKeR>>
01 IE F ILE IE/DEPER/IRB 35 NRR/DF/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DF/SGEB 25 NRR/DHFS/LQO NRR/DL/SSPB NRR/DSI/ASB
. NRR/DSI/CSB 09 NRR/DSI/METB 12 NR
/RAB 22 EG FIL 04
/ DANI/MIB
BNL(AMDTS ONLY)
FEMA~REP'IV 39 NRC PDR 02 NTIS COPIES LTTR ENCL 1
0 1
1 1
1 1
1 1
0
'1 1
2 2
1 1
1 1
1 1
1 0
1 1
1 1
1 1
1 1
1 1
0 1
1 1
1 1
"TOTAL NUMBER OF COPIES REQUIRED:
LTTR 53 ENCL 46
I
) f
'1 t
g 0 f>>l<<
b
'll
~
I
~
1 1
if"1>>
<I"
~
1
' f ~ '<<ll'X,y 1
>>r c'-
d Ir wrj l
~
'r p 'J 1>>r
<<)P1>>
11(">rill
'1134<
"0 gg Y II r Iirpr II w ~i
~
<<rj'>>>>
I<<I I', i<a(>>1<le,r1<<f )r, Ag,', )
<w.!
<I,)
) ~<l f j 1
rg I" I) I
< Il,
~<>><>>r>
<i <IJ')I<r II e'~>><<
I<II<
II I't IIII 17,<II<II I.1]kC'If~,>>,S w"0jy ','<
I IX I'jr". 1
', (>> IIg rl <<wr<'
>>1r.'P'.13i II I It r.
I
)/'Il,<
I
> Ii
'g
<P
'lj,
!I
>
~'~
II II tI wt w
hi I, >>
'I I
Itl 'w wl
>j,iI l,ll>
Ill I
""(g '<>>',
I
'I
.I
>>I I, j w
Ii 11,<w< g') I, li I I'gw 'r',g II <>>'<j I". I
$ lX ii I
>>1 t
rw
,t r
r Cr' X
T
~
k I,I <g I I!j I<>>>>k j > <<I <<< '(
I g
0 w>> Q
<rt~
.r I>>II ',
I
>>wtg <>>'
ir,
( Ii
'9 ij II
'I; i,
<1,'V f "
Jf t<
Ii,'.
III 'I
", weal",t),l II'f X.y
>>f<'w t
Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 February 8, 1984 G02-84-68 Docket No. 50-397 Director of Nuclear Reactor Regulation Attention:
Mr. A. Schwencer, Chief Licensing Branch No.
2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Schwencer:
Subject:
References:
NUCLEAR PLANT NO.
2 OPERATING LICENSE NPF-21, REQUEST FOR LICENSE AMENDMENT, CLARIFICATION 1)
Letter, G02-84-032, G.
C. Sorensen (SS) to A. Schwencer (NRC), "Operating License NPF-21, Request for License Amendment", dated January 20, 1984 2}
- Letter, G02-84-.65, G.
C. Sorensen (SS) to A.
Schwencer (NRC}, "License Amendment 10 CFR 50.92, Significant Haza} ds Analysis", dated February 8, 1984 Reference l,requested a change to technical specification LCO 3/4.8.1 to allow the flexibilityto perform more than one cold start test of the diesel genera-tors per 184 days as currently prescribed by paragraph 4.8.1.1.2.a.4 (attached).
As discussed in a phone conversation February 7, 1984, between P.
Powell (SS) and Messrs.
R. Auluck and D. Hoffman (NRC),. the staff determined to modify the technical= specification, generically to allow the requested flexibility (see attached}.
Accordingly, the change requested in the reference letter is hereby modified to be the same as the staff's generic resolution.
s4oii~o447 84o2os PDR, ADOCK 05000397 P
l I
]
C
~ h
~
~
0
A. Schwencer Page Two February 8, 1984 REQUEST FOR LICENSE AMENDMENT, CLARIFICATION The significant hazards analysis provided in Reference 2 remains applicable.
This change reduces a possible compromise to plant safety and therefore represents no significant hazard.
The fee for consideration of this license amendment was provided by Reference 1, and since the intent of the original request has not changed, no additional fee is appropriate.
In accordance with 10 CFR 50.91, the State of Washington has been provided a
copy of Reference 1 and this clarification.
Should you have any questions, please contact Mr. P. L. Powell, Manager, WNP-2 Licensing.
Very truly yours, G.
C. Sorensen, Manager Regulatory Programs PLP/tmh Attachment cc:
R Auluck NRC WS Chin
- BPA D
Hoffman -
NRC AD Toth NRC Site N
Lewis EFSEC
STATE OF WASHINGTON
)
)
County of Benton
)
Subject:
I, G.
C.
SORENSEN, being duly sworn, subscribe to and say that I am the
- Manager, Regulatory
- Programs, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made in it are true.
DATE F ] E8
, 1984
- orensen, anager Regulatory Programs On this day personally appeared before me G.
C.
SORENSEN to me known to be the individual who executed the foregoing instrument and acknowledge that he signed the same as his free act and deed for the uses and purposes therein mentioned.
GIVEN under my hand and seal this Q~ day of 1984.
otary u
sc an or t e State of Washington Residing a
~ + 'F) l '
lt l I ~
eF ei Sy g,,
yy i
Ng
~
OFF g
, '0" 0 f gy C 0
6 '
0
~
F 'I p
Illll '(
C F
Fi 0(
flip i=f,
~
r,
~
I >
0 4 III If t
~ >M 4
LP ~
rr, 1
k,F,
,)ijt'")> SF $ ))Q r,
W
'FW y C
~
1 F
I 4
~
- ~
~ggglltilk~ PF~
,y tA \\J ((
~'8 7 CF ~.F.