ML17277B203

From kanterella
Jump to navigation Jump to search
Requests Info Re Potential Impact of Util Precarious Financial Situation on Licensing of Unit 3
ML17277B203
Person / Time
Site: Columbia 
Issue date: 10/11/1983
From: Judith Weaver
HOUSE OF REP., INTERIOR & INSULAR AFFAIRS
To: Palladino N
NRC COMMISSION (OCM)
Shared Package
ML17277B201 List:
References
NUDOCS 8312230155
Download: ML17277B203 (2)


Text

I t

c CONGRESS ARIZ., CHAIRMAN LUUIUELLUJAILJR N. MEX DON YOUNG. ALASKA ROBERT J. IAGOMARSINO. CAUF.

DAN MARRIOTT, UTAH RON MARLENEE. MONT.

ISCHARD B. CHKNEY, WYO.

CHARLES PASHAYAN.JIL, CAUS.

lARRYCRAIG, IDAHO HANKBROWN. COLO.

DKNNYSMITH. OREG.

JAMES V. HANSKILUTAH BILLEMERSON, MO.

JOHN McCAIILARQ.

BARBARAVUCANOVCILNEV.

o ~

W

~ ~

p a

NWKTY.GGHTH MORRIS K. UDALI

~

~

PHIlUP SURTOKE CAUF.

ARRAIGN KAREN. JR TEX.

JOHN F. SGSERUNG. OHIO ANTONIO BORJA WON PAT, GUAM JAMES WEAVER, ORKG.

JAMES J. flORIO, NJ.

PHIUP fL SHARP, WD.

EDWARD J. MARKEY, MASS.

BALTASARCORRADA, P.R.

AUSTW J. MURPHY. PA.

NICK JOE RAHALLR, W. VIL BRUCE F. VKNTO, MWIL JERRY HVCKASY, LA.

JKRRY M. PATTERSON, CAUF RAY KOGOVSEIL COLO.

DALE E. KRDEE, MCH.

TONY COElHO. CAUF.

BEVERLY B. BYRON. MD.

RON DE LOGO, VA SAMUEL GEJDENSON. CONN.

WIUJAM PA'TMAN, TEX.

PETKR H. KOSTMAYUI,PA.

JAMES MOODY. VAS.

ALANB. MOLLOHAN.W. VA.

JAMES McCLURE CLARKE N.C.

JAMES F. McNULTY,JRARIZ.

RCHARD H. LEHMAILCAUF.

COMMITTEE ON INTERIOR AND INSULAR AFFAIRS U.S. HOUSE OF REPRESENTATIVES WASHINGTON, D.C. 20515 October ll, 1983 STANLEY SCOVILLE STAFF DIRECTOR AND COUNSEL ROY JONES ASSOCIATE STAFF DIRECTOR LEE MC ELVAIN GENERAL COUNSEL TIMOTHYW. GLIODEN REPUBUCAN COUNSEI Nunzio Palladino, Chairman U.S. Nuclear Regulatory Commission 1717 H Street, N.W.

Washington, D.C.

20555

Dear Mr. Palladino:

Last month the House Energy and Commerce Subcommittee on Energy Conservation and Power asked NRC to determine what impact the precarious financial situation of the Washington Public Power Supply System (WPPSS) might have on licensing of WPPSS 3, for which WPPSS is presently seeking an operating license.

NRC personnel, however, believed that this request pertained to licensing of WPPSS 2, which is now ostensibly 100% complete and commencing its start-up and testing phase.

As noted by the press throughout the Pacific Northwest, NRC spokesmen stated that NRC was already researching the impact of WPPSS financial problems on the licensing of WPPSS 2.

The NRC representative for Region V told the press:

We'e researching it.

We need to address this issue.

We need to be assured if there was a signifi-cant problem they would have the resources to deal with it.

I.am relieved that NRC has taken the initiative to investigate this matter and believes that such an investigation is necessary.

Please contact the Subcommittee

Counsel, Daniel Meek, at (202) 225-1661, and provide him with a status report on this effort as soon as possible.

Thank you very much.

Since el SGIRRSOISS BSXROT PDR"ADOCK 05000397 U

PDR JIM WEAVER, Chairman Subcommittee on Mining, Forest, Management, and the Bonneville Power Administration

h P

1 V

k