ML17277B190

From kanterella
Jump to navigation Jump to search
Amend to Application for Ol,Changing Tech Specs to Increase Unit Reliability by Allowing for Warmup Period Prior to Loading
Date released: 06/27/2018 Download: ML17277B190


Marked-up Proposed Tech Spec Changes Re Limiting Condition for Operation of Electrical Power Sys
ML17277B191
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/13/1983
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
References
Download: ML17277B191 (5)
Amend to Application for Ol,Changing Tech Specs to Increase Unit Reliability by Allowing for Warmup Period Prior to Loading
ML17277B189
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/13/1983
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: SCHWENCER A
Office of Nuclear Reactor Regulation
References
Download: ML17277B189 (4)