Informs of Pipe Break Analysis Completion,Using Revised Pipe Break Target Evaluation Procedures in Final Assessment of Design Reverification program.Safety-related Cable in post- Accident Sampling Sys Moved Out of Jet Impingement Zone
ML17277B167
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/09/1983
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Schwencer A
Office of Nuclear Reactor Regulation
References
GO2-83-1137, NUDOCS 8312190007
Download: ML17277B167 (6)


Text

REGUI ATORY FORMATION DISTRIBUTION SYM (RIBS)

ACCESSION NBR:8312190007 DOC ~ DATE: 83/12/09 NOTARI'ZED!

NO DOCKET ¹

-FACILt50 397 HPPSS Nuclear Projects Unit 2g Nashington Public Powe 05000397 AUTH'AME AUTHOR AFFILIATION SORENSENgGBC

~

I'Jashington Public Power Supply System RECIP ~ NAME RECIPIENT AFFILIATION SCHHENCERpA ~

Licensing Branch 2

SUBJECT:

- Informs of pipe bleak analysis completionrusing revised pipe break target evaluation procedures in final assessment of desing rever ification program,Safety related cable in post accident sampling sys moved out of jet impingement.hone>

DISTRIBUTION CODE:

BOOIS COPIES RECEIVED:LTR ENCL $

SIZE:.

TITLE: Licensing Submittal:

PSAR/FSAR Amdts 5 Related-Correspondence NQTES:

RECIPIENT ID CODE/NAME; NRR/DL/ADL NRR LB2 LA INTERNALS ELD/HDS?

IE/DEPER/EPB 36 IE/DEQA/QAB 21 NRR/DE/CEB 11 NRR/DE/FQB 15, NRR/DE/MEB 18 NRR/DE/SAB 24 NRR/DHFS/HFEBOO.

NRR/DHFS/PSRB NRR/DS I/AEB 26 NRR/DS I/CP 8 10 NRR/DSI/ICSB 16 NRR/DSI/PSB-19 NRR/DSI/RSB 23 RGN5 EXTERNAL; ACRS 41 DMS/DSS (AMDTS)

LPDR 03 NSlC 05 COPIES LTTR ENCL 1

1 1

1 1

2 1

1 1

1 1

1 1

1 REC IP IENT ID 'CODE/NAME NRR LB?

BC AUI UCKgR ~

01 IE FILE

'E/DEPER/IRB 35 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DSI/ASB NRR/DSI/CSB 09 NRR/DSI/METB 1?

NRR D

AB 22 00 RM/D0AMI/MI8 BNL(AMDTS ONLY)

FEMA>>REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENC 1

1 1

1 1

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 53 ENCI 6

'4 i

II

'4 I

(" I/4 C

4 44( f', I )

4 I N'I 4

I J 4

)4( ga II, 4

!1 4 g!4 i

4!

I"4 $

N Iii I I

i 4

1 I I

It I I

Ii

~ v f)r'

'I

~

N.'l I vq )

Fv M

~

II h

I'<<4

]

~

I 4!vv'>

ll f f '4 fl, v I' Ii'vI g i Nl I << I 4 i)grv )I/Ig(vi ra vvv CN II 1(I I)I I

<<'31 f)i)7 fk a

v'll'(

'I Ii r I

J!'lg )

4 ININI 3 >I I

~ 44 144 I I

pv I

I44 g v4

'P I I I 4! 'l I'I r Cl I)4y i!

vv I 4444 I

4 "1,

4 4

0 J

Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 I

8312190007 831209

(

PDR ADQCK 05000397 A

PDR December 9, 1983 G02-83-1137 Docket No. 50-397 Director of Nuclear Reactor Regulation Attention:

Mr. A. Schwencer, Chief Licensing Branch No.

2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Schwencer:

Subject:

NUCLEAR PROJECT NO.

2 PIPE BREAK ANALYSIS

References:

a)

Design Reverification Program, Final Assessment

Report, September 1983 As committed to in a December 2, 1983 meeting between R. Auluck (NRC) and P.

Powell (SS) regarding the WNP-2 pipe break analysis, the following information is provided.

The pipe break analysis has been completed using the revised pipe break target evaluation procedures discussed in the reference for potential finding report PB-6.

One safety related target has been identified and direction has been implemented to modify the impacted system.

The target is a

cable, associated with the Post Accident Sampling System (PASS).

Corrective action will be to move the cable to a location out of the jet impingment zone.

Presently

-a proposed WNP.-2 licensing condition requires the PASS system to be operational by 5A.power.

The corrective action described above will be completed prior,to 5A power.

In the interim the affected cable will remain de-energized until moved.

Qoo 00<0 0

Qy

~ %

~ I ~

~

~

~ I ~ I w m

~

I ~ I I

~

~

~I

A. 4chwencer Page Two December 9,

1983 PIPE BREAK ANALYSIS In summary the Supply System considers this action to have no impact on the scheduled fuel load for WNP-2.

Should you have any further questions, please contact Mr. P. L.'owell,

Manager, WNP-2 Licensing.