ML17277B151
| ML17277B151 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 12/05/1983 |
| From: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| References | |
| GO2-83-1116, NUDOCS 8312130230 | |
| Download: ML17277B151 (9) | |
Text
REGULATORY e'ORMATION OISTRISUTION SYQM (RIOS)
AGCESSI ON NBR: 8312130230 DOC, DATE: 83/12/05 NOTARIZED:
NO DOCKET ¹ FACIL:50 3'97 WPPSS Nuclear Pr'ojectr Unit '2r Washington Public Powe 05000397 AUTHs NAME AUTHOR AFF IL'IATION SORENSENrG ~ CD Washington Public Power Supply System RECIP ~ NAME RECIPIENT AFFILIATION SCHHENCERgA, Licensing Branch 2
SUBJECT!
Forwards Justification for addi equipment not.seismically qualified by fuel'load, DISTRIBUTION CODE:
A008S COPIES RECEIVED:LTR ENCL SIZE:.
TITLE: OR/Licensing Submittal:
Equipment Qualification NOTES:
RECIPIENT Ik CODE'/NAME NRR LB2 BC 12 INT'ERNAL: ELD/HDS2 12 IE FILE 09 NRR/DE/EQB 07 RAB 06 REG FILE>>
04 EXTERNALG ACRS 15.
NRC PDR 02'TIS3f
'COPIES
, LTTR ENCL 1
0 1
1 2
1 1
1 1
8 8
1 1
LPDR NSIC 03 05 RECIPIENT ID CODE/NAME AULUCKrR~
01 GC 13 NRR CALVOiJ NRRIDL DIR 1<
NRR/DS I/AEB RGN5 COPIES LT'TR ENCL 1
1 1
1 1
1 1
1 1
1 1
TOTAL NUMBER OF COPIES REQUIRED; LTTR 25 ENCL 2'
M H
0
)
M
'W'H I
H
=HH H
I H
H
~
I, 1H
~
.M f IH W I
'H HWgWW' ll Il W
fl M
H II
- I.'4WWH
Washington Public Power Supply System P.O. Box968 3000George Washington Way Richland,'Washington 99352 (509) 372-5000 8312130230 831205 PDR ADOCK 05000397 A
PDR December 5, 1983 G02-83-1116 Docket Ho. 50-397 Director of Nuclear Reactor Regulation Atter tion:
Mr. A. Schwencer, Chief Licensing Branch No.
2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Schwencer:
Subject:
NUCLEAR'PROJECT 2
EQUIPMENT SEISMIC QUALIFICATION
Reference:
G02-83-1023, G.
C. Sorensen to A. Schwencer, same subject, dated November 4, 1983, Attached fi'r)d a.justification for further equipment that will not be seismically qualified by fuel load.
You will note that'you have already considered this equipment in the Environmental Justification for Interim Operation.
Very truly yours, G.
C. Sorensen, Manager Regulatory Programs KRW/sms Attachment cc:
R Auluck -
NRC WS Chin
- BPA A
Toth NRC Site
~ 4 lj P'
g
~
~
JIO-S-10 EPN:
SW-M-187A, -187B, -188A, -188B SW->10-187A,
-187B, -188A, -188B
==
Description:==
Fuel pool cooling heat exchanger Service water valve Motor operators and motors Safety Function:
Fuel pool cooling Justification:
See attached justification from Environmental qualification Report which addresses the A'eries motor operators but also applies to the other'EPNs listed above.
1
~
Sy
E IPNENT JUSTIFICATION 819 1.0 COMPONENT IDENTIFICATION'PN:
SW+0-187A,188A
==
Description:==
Standby Service Water System Valve Motor Operator Component Type:
Motor Operator Nanufactur er/Model:
Limitor que Corp./SNB-00 2 0 ACCIDENT CONDITIONS Accident Profile:
Use Code:
Operability Time:
Radiation Zone:
Zone Dose:
Tem erature f4 4320 Hours 1.5x105 Rads Relative Hurri dit 821X 3 0 COMPONENT SAFETY FUNCTION SW+0-187A and 188A provide alternate cooling to the Fuel Pool Cooling (FPC) System heat exchangers under abnormal plant conditions when the Reactor Building Closed Cooling Water (RCC) System is unavailable.
SW40-187A and 188A open valves SW-V-187A and 188A to provide Standby Service Water (SW) System cooling to FPC-HX-lA.
4.0 ALIFICATION STATUS 4.1 Sugar of uglification Status The motor operators were purchased qualified; however, unqualified motors were inadvertantly used.
The vendor is scheduled to provide qualified replacement motor>-
The following justification for interim operation is provided in the event that the motor operators are not replaced prior to fuel load.
- 4. 2 Parameters Re uirin Justification Temperature,
- pressure, humidity and radiation dose.
7183f/1
5.0 JUSTIFICATION FOR INTERIM OPERATION Alternate cooling water is provided to FPC-HX-lA through valves SM-V-187A and SM-V-188A.
Although fuel pool cooling is not required until the first refueling outage, the valves must remain closed in the interim so'hat operation of the Standby Service Mater System would not be degraded.
The aotor operators will be qualified prior to the first refueling outage.
Currently the motor operator s Review of the construction of oper ators with similar motors that would cause the operator are fully qualified except for the motors.
the operator and limitorgue test data on identifies no failure mode of the motor to open the valve.
6.0 CONCLUS ION Interim operation is justified on the following basis:
SM-NO-187A and 188A are not required to operate post-accident since fuel pool cooling is not needed prior to the first refueling outage.
2.
There is no failure mode of the motor that would cause SMNO-187A and 188A to open their associated valves to an undesirable position.
7183f/2
t4
~
~
~ I~