ML17277B141
| ML17277B141 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 12/02/1983 |
| From: | Rajender Auluck Office of Nuclear Reactor Regulation |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8312090093 | |
| Download: ML17277B141 (7) | |
Text
DEC 2 1983 Docket No. 50-397 MEMORANDUM FOR:
A. Schwencer,Chief Licensing Branch No.
2 Division of Licensing FROM:
SUBJECT'ATE 5 TIME:
LOCATION'URPOSE:
R. Auluck, Project Manager Licensing Branch No. 2, DL FORTHCOMING MEETING WITH WASHINGTON PUBLIC POWER SUPPLY SYSTEM (WPPSS)
(Agenda attached)
- Tuesday, December 6, 1983 8:30 AM WPPSS Headquarters 3000 George Washington Way
- Richland, Washington NRC Management Site Visit PARTICIPANTS*:
NRC T. M. Novak F.
H.
Rowsome W. V. Johnston E. L. Jordan D. Ziemann R. T. Dodds A. D. Toth R. Auluck WPPSS D.
W. Mazur 8
Support Staff O~ginai signed by
Attachment:
Agenda cc w/attachment:
See next page R. Auluck, Project Manager Licensing Branch No.
2 Division of Licensing
- Meetings between NRC technical staff and applicants for licenses are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting and Statement of NRC Staff Policy", 43 deral Re ister 28058, 6/28/78.
D B
PM DL:
/BC w
ASchwencer 1 /g /83 12/~3 83i2090093 83i202 PDR ADOCK 05000397 PDR
AGENDA December 6, 1983 Site Tour:
8:30 AN ll:30 AN Afternoon Meeting:
1:00 PN 1.
Status of Plant Construction/Construction History Status of Pre-op tests 2.
WPPSS Organization and Plant Staffing Staff experience Training program/simulator usage 3.
guality Verification Program (following work stoppage) 4.
Design Verification Program 5.
CAT Inspection
.6.
Emergency Preparedness including coordination with DOE (Hanford area) facilities emergency plans and postulated emergencies 7.
Demonstration of randomly selected shift including STA and BWR experienced person (may be licensed operator) for ability to perform and recover from selected emergency events.
8.
Operational gA program 9.
Implementation of TMI requirements 10.
System Reliability Studies ll.
Electrical (cables, etc.) Separation
WNP-2,.
Mr. G. C. Sorensen, Manager Regulatory Programs Washington Public Power Supply System P." 0. Box 968 3000 George Washington Way Richland, Washington 99352 CC:
Nicholas Reynolds, Esquire Debevoise 8 Liberman 1200 Seventeenth
- Street, N.
W.
Washington, D. C.
20036 I
Mr. G. E. Doupe, Esquire Washington Public Power Supply System P. 0.
Box 968 3000 George Washington Way
- Richland, Washington 99352 Nicholas Lewis, Chairman Energy Facility Site Evaluation Council Mail Stop PY-ll Olympia, Washington 98504 P. L. Powell, Licensing Manager Washington Public Power Supply System P. 0.
Box 968
- Richland, Washington 99352 Mr. W. G. Conn, Sr.
N/M Group Supervisor Burns and Roe, Incorporated 601 Williams Boul.evard
- Richland, Washington 99352 Mr. Richard Feil U.S.
NRC Resident Inspector WPPSS-2 NPS P. 0.
Box 69
- Richland, Washington 99352 Dr. G. D. Bouchey, Manager Nuclear Safety 8 Regulatory Programs Washington Public Power Supply System P. 0.
Box 968, MD 650
- Richland, Washington 99352 Mr. J. D. Martin WNP-2 Plant Manager Washington Public Power Supply System P. 0.
Box 968
- Richland, Washington 99352
~'
I I
MEETING NOTICE DlSTRIBOTION:
Date:
DEC 3 1983 Document Control (50=397)
NRC PDR L PDR NSIC PRC LB82 Reading E. Hylton Project Manager R. Auluck H. Denton/E.
Case D. Eisenhut/R.
Purple T.
M. Novak*
B. Youngblood A. Schwencer G ~ Knighton E. Adensam G. Lainas F. Miragl ia J.
P. Knight W. Johnston D. Muller R. Houston L. Rubenstein F. Schroeder M. Ernst D. Ziemann NRR Division Directors*
OELD Attorney W. Paton E. L. Jordan, DE(A:IE J.
M. Taylor, DRP:IE Phillips Building Receptionist"*
ACRS (16)
Region Residen~t nspectnr F. Ingram, PA NRC PARTI CIPANTS:
T. M. Novak R. J. Mattson F.
H.
Rowsome W. V. Johnston
~
J.
M. Taylor D. Ziemann R. T.
Dodds A. D. Toth R. Auluck cc:
Service List
- Only if participant in meeting
- Onlyif meeting held in Bethesda
p