Advises That All TMI Action Plan Equipment Reviewed to Identify Environ Qualification Status.All Equipment Either Qualified or Lack of Qualification Justified,Per Section 3.11.3.1 of Sser (NUREG-0892)
ML17277B074
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/21/1983
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Schwencer A
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-0892, RTR-NUREG-737, RTR-NUREG-892 GO2-83-1083, NUDOCS 8311280166
Download: ML17277B074 (6)


Text

REGULAT I

RMATION DISTRIBUTION~S (RIDS)

ACCBSSlON NBR:8311280166 DOC ~ DATE: 83/11/21 NOTARIZED:

NO DOCKET FACIL:50 397 NPPSS Nuclear Projecti Unit 2i Hashington Public Powe 05000397 AUTH,NAME AUTHOR AFFILIATION SORENSENgG>C, Washington Public Power Supply System

'RECIP~NAME<

RECIPIENT AFFILIATION SCHNENCERiA.

Licensing Branch 2

SUBJECT:

Advises that all TMI action plan equipment reviewed to identify environ qualjfication status,A1'1 equipment either qualified or'ack of qualification Justifiediper Section 3

11 3

1-of SSER <<(NUREG-0892)

~

DI'STRIBUTION CODE!

A048S

'COPIES RECEIVED:LTRj ENCl SIZE e u

TITLEj'OR/Licensing Submittal:

Equipment Qualification'OTES:

REC IP IENT ID CODE/NAME NRA LB2 BC'2 INTERNAL'LO/HDS2 12

"- - IE FILE, 09 ERR/DE/EQB 07 NRA AB 06 FIL 04 COPIES LTTR ENCl "RECIPIENT ID"CODE/NAME AULUCKiA,'1 GC 13 NRR CALVOiJ NRR/DL DIR 10 NRR/DSI/AEB RGN5 COPIES LTTR ENCL 1

1

~

1 1-EXTERNAL! ACRS ARC PDR NTIS-15 02 31=

lPDR NSIC 03 05

,TOTAL NUMBER OF COPIES REQUIRED:

LTTR 25 ENCL 2

i

)(

)sr'Y',i g l

) kissy j Ql

'v~

..",,t'E s ~sA 1'~i'~~

l4 k I hc

)r )" i~p il

~0.,

s fir

- f q(

I cpls 1

'~'~ N + I 1 i0 l

llgq+

I "jg, jf g 'l, i.il'.

lr

<<IAAF>>

'AM E 'r~ts (i.s>>

~1 Pl l

~ '~ q'J f

v:

v's.<l d.]

~

s uS']It u

~

~ n

~

1 ~ <)pi Jcill

~

sJ'f

($ r~l ))9Mg 1

t <4'y 0 s r ask~.'4 s~~ l ps)

'fr)')

< sf',<'>

f l

(

?sl Qte q~r s. art r l~~s".

g~y s>>ar r

> Jpssl,

~scsr tq,or

> r t~,ss,

"~ t~),q~'

l g~

)ip s t g~")r~ f Max4

~ l, s sreis>>

ar srsq r y s

g s r I s s>> r zlgE

)

q>>.

'0 sr crls '""

v. s,.i'.

t a I, c,.

s 1 - 4 k

lly1 s.t s

s

'.sl s'

'-ns sc:

<'s s l

~'s I lll Id'~',I s

n~, r $.,:

s s i l r s~".'- ~

r <>a f r " xs

~.

rsr '~,>r aX'sit:;>>1).

1 l )

F ~

V I I s

I I ) )-

p J>I

~~<

~

-1 "l I >>

I

~" '41 s".~~<i,g <lq.lls

',1,

'les>>~

l,~<"v sh) sly

.JGX~">>~

r

')

1>$

,,~<

". l z ll3 sI

~s.~;-,~~~X s sX~'H

~

5 irk I1 Ii

c. l

~ (II l>>

JwA'-s it w rt 5 I

s ski I

Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 83ii280ih6 83ii2i PDR ADOCK 05000397 PDR November 21, 1983 G02-83-1083 Docket No. 50-397 Director of Nuclear Reactor Regulation Attention:

Mr. A. Schwencer, Chief Licensing Branch No.

2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

NUCLEAR PROJECT NO.

2 TMI ACTION PLAN EQUIPMENT QUALIFICATION

References:

1)

Safety Evaluation Report related to the Operation of Supply System Nuclear Project No. 2, Docket No. 50-397, NUREG-0892, Supplement No. 3, dated May 1983 2)

Letter G02-83-842, G.

C. Sorensen to A. Schwencer, "Environmental Qualification Report for Safety-Related Equipment, September 1983", dated September 16, 1983 At Section

3. 11.3. 1, the reference SSER calls for certain actions by the Supply System for TMI Action Plan Equipment.

This letter responds to the SSER request for action and confirmation.

NRC Concern:

!'.The appl.icant has identified the equipment required by NUREG-0737, "Clarification of TMI Action Plant Requirements",

but the qualification status has not been established for all items.

Before an operating license is granted, the applicant should identify the qualification status for all TMI Action Plan equipment.

For any TMI Action Plan equipment not yet installed and that will not be installed prior to operation, a description of the plans for qualification, including the schedule for completion of qualification, must be submitted.

(911 TMI Action Plan equipment currently installed or that will 5e installed before operation must be qualified, or justifications for interim operation provided before an operating license is issued, in accordance with 10 CFR "0.49.)"

goNF (i

go

OO

~

P N

a r 44@

C>>

(

Mr. A. Schwencer Page Two November,21, 1983 G02-83-1083

~Res ense All TMI Action Plan equipment has been reviewed to identify environ-mental qualification status.

All TMI equipment is either environ-.

mentally qualified, justified, on Table B of the JIO, being purchased qualified for installation prior to fuel load, or in a mild environment.

While we judge that this response, along with Reference 2), addresses th:s SSER concern satisfactorily, we are available to assist your review if necessary.

G.

C. Sorensen, Manager Regulatory Programs KRW/sms cc:

R Auluck -

NRC WS Chin

- BPA A

Toth NRC Site

t 2 t