ACCESSION NBR:8311150309 DOC ~ DATE: 83/11/04 NOTARIZED:
NO DOCKET FACIL:50 ~%97 WPPSS Nuclear Projects Unit 2i Washington Public Powe 05000397 AUT~GAME.
AUTHOR AFFILIATION SORENSENiG ~ CD Washington Public Power Supply System
-RECIPGNAME RECIPIENT AFFILIATION SCHWENCERgtII ~
Licensing Branch
?
SUBJECT:
Forwards info providing status of.response to Generic Ltr 83 28i "Required Actions Based on Generic Implications of Salem ATWS Events,"
Response. will be mai'led on 831118
'ISTRIBUTION CODE:
B003S COPIES RECEIVED:LT'R, ENCL 6 SIZEG TITLE: Licensing Submittal: Anticipated Transients Without 'Scram"(ATWS)
NOTES'ECIPIENT IO CODE/NAME'RR LB2 BC 05 INTERNAL: ELO/HDS2 NRR/DHFS DEPY08 NRR/DSI/ADCPS06 NRR/OSI/CPB 07 NRA/DST/GIB 09 COPIES LTTR ENCL-1 1'
1 1
1 1
1 RECIPIENT ID CODE/NAME
1 1
1 1
1 1
1 1
1 EXTERNALG ACRS NRC PDR NTIS 0?,
5.
5 1
1 1
1 LPOR NSIC 03 06 1
1 1
1 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 21 ENCL 20
'I. I l"
~i'} 4 lt f
~
( 'f p,>yf, Xr
~ },
r~ f >1 e }.
I 1'}4 I },
)'I ~.g' I Ic}g}t ixj41'<
'} r I
~ J 'I i}I I I "I
fI ) f}i ~
I ll jg I'
yif>
I 4qg f,a
> I '}gp f
('h f e ti~
Ql
~ }'}
Ip s>>~
q J
I p
] Ei
'}'I t;}f 4 }f}~ } I
(}44
'}<>> }P )e~'} }
~() P}6}r,f)flfgllfvo}} ')F<}r c'.Ia q } I 4 4 0 Irl<) I i}},)f },}f9'}0'}~I 0'} I)')cI'foal c~f}a>> 4 ).)}} 4'>'} f i}f) 1 "'"I, I }8 f}v I}}frf,l '} } f I f.q }aria.qe;} 4 ".",I >v }.'}f 4 " 4a I)s',)(,I", Pjy f }) )I f! }f }'}J,g}}ll} ~ I ~ 'II>}lI. 4~ ~} <0 rl~ ~Sr}eren<~a I ~Sr'.I'i>r If}>4.'} f 4 r,l ~4~ } f}r~f}'>>f I: } II I I H ~ p It l T "hit'IJ ) 3}I < -A..,~ }<,,} ) t'> ~ '" i '>>>>I I'4}f4 <<',.-0 I'I } 4 <)I"'II'f> r I )1 }l ) i } PS I,f.,.A I}I .I > X' ~4' <<,'(fggyI f (.'") X"I ~}4 I I I x" y'II" f) ~}e',"3,) < I 4< X I ~,'4} ~ l I,)XI, l }X <<l~}X ~ R ~ X } I}. jA,', F, l wllI I I ,jul;.4' ) ia Ii, ' I I x vlf g , ~,'l}gA I, I} ] 'l 4 v tl pt
Washington Public Power Supply System 3000 George Washington Way P.O. Box 968 Richiand, Washington 99352-0968 (509)372-5000 Docket No. SO-397 November 4, 1983 G02-83-1021 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D. C. 20S55
Dear Mr. Schwencer:
Subject:
NUCLEAR PROJECT NO. 2
RESPONSE
TO GENERIC LETTER 83-28
References:
2) Letter to D. Mazur, Supply System, from A. Schwencer, NRC, "Clarification of Required Actions Based on Generic Implications of Salem ATWS Events", October 25, 1983 Letter to D. G. Eisenhut, NRC, from G. C. Sorensen, Washington Public Power Supply System, "Request For Extension For Response to Generic Letter 83-28", September 6, 1983 Your letter of October 25, 1983 (Reference
- 1) which we received on November 1,
- 1983, denied our request (Reference
- 2) for an extension of the time to respond to NRC Generic Letter 83-28.
You requested our
- response, to the extent practical, by November 5, 1983.
Although most of the information necessary to give you current status and implementation schedules for the items in Generic Letter 83-28 exists, a significant effort is required to put it into narrative form to respond to your request. We advised Dr. Auluck, on November 3, that our response will be mailed on November 18, 1983. To aid your staff in planning their reviews, the enclosed information is provided. Very truly yours, G. C. Sorensen, Manager Regulatory Programs GCS/CVH/mm cc: R Auluck - NRC WC Chin BPA AD Toth NRC Site 83ii150309 83ii04 PDR ADOCK 05000397 A PDR
1 II I) t
Generic Letter 83-28 Status of Res onse GL 83-28 Items Comment/Status All of items 1, 2 and 3 except 2.2.2. 2.2.2 4.1, 4.2, 4.3 and 4.4 Statement of status, description of program, and implementation schedules to be included in letter of ll/18/83. It is our intent to incorporate the results of the INPO Nuclear Utility Task Action Committee (NUTAC) review in this area. The results are expected to be available for our approval in February 1984. We.under-stand that agreement has been reached between the NUTAC and NRC on the accept-ability of this schedule. Not applicable to BWR's. No further com-ments or submittals. 4.5 Statement of status, description of program and implementation schedule to be provided 11/18/83.
0 +A ~ << r}}