ML17277A995

From kanterella
Jump to navigation Jump to search
Forwards Info in Response to NRC Concerns Identified in 830413 Fire Protection Site Audit.W/Seven Oversize Drawings. Aperture Cards Are Available in PDR
Date released: 06/27/2018 Download: ML17277A995


Diesel Generator Building Pre-Action System 83.
ML17277B006
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/18/1983
From:
Sentry Automatic Sprinkler Co..
To:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
CON-74-00083, CON-74-83
Download: ML17277B006 (1)
Diesel Generator Building Pre-Action System 81.
ML17277B005
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/18/1983
From:
Sentry Automatic Sprinkler Co..
To:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
CON-74-00081, CON-74-81
Download: ML17277B005 (1)
Diesel Generator Building Pre-Action System 79.
ML17277B003
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/18/1983
From:
Sentry Automatic Sprinkler Co..
To:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
CON-74-00079, CON-74-79
Download: ML17277B003 (1)
Diesel Generator Building Plan & Hgr Iso Sys 79 & 81.
ML17277B001
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/18/1983
From:
Sentry Automatic Sprinkler Co..
To:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
CON-74-00079, CON-74-79
Download: ML17277B001 (1)
Diesel Generator Bldg System 79 Thru 84 Alarm Bell Piping & Hanger Isometric.
ML17277A999
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/13/1983
From:
Sentry Automatic Sprinkler Co..
To:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
CON-74-00079, CON-74-79
Download: ML17277A999 (1)
Diesel Generator Plan & Support Isometric:Systems 79,80, 81,82,83 and 84.
ML17277A998
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/13/1983
From:
Sentry Automatic Sprinkler Co..
To:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
CON-74-00079, CON-74-79
Download: ML17277A998 (1)
Diesel Generator Support Isometric (Sys 79,81 & 83).
ML17277A997
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/17/1983
From:
Sentry Automatic Sprinkler Co..
To:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
CON-74-000079, CON-74-79
Download: ML17277A997 (1)
Hanford 2 Power Generation Control Complex (Pgcc) Floor Plate Design.
ML17277A996
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/09/1983
From: Artigas R, Hart C, Spencer E
GENERAL ELECTRIC CO.
To:
References
Download: ML17277A996 (49)
Forwards Info in Response to NRC Concerns Identified in 830413 Fire Protection Site Audit.W/Seven Oversize Drawings. Aperture Cards Are Available in PDR
ML17277A994
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/28/1983
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: SCHWENCER A
Office of Nuclear Reactor Regulation
References
Download: ML17277A994 (4)