ML17277A992
| ML17277A992 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 11/03/1983 |
| From: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| References | |
| GO2-83-1012, NUDOCS 8311090066 | |
| Download: ML17277A992 (6) | |
Text
REGULATORY 'RMATION DISTRIBUTION SYS i (RIDS)
~t' ACCESSION NBR:8311090066 DOC ~ DATE: 83/11/03 NOTARIZED:
NO DOCKET FACIL:50-397 NPPSS Nuclear Projectr Unit 2r liashington Public Powe 05000397 AUTH BYNAME AUTHOR AFFILIATION SORENSENrG<C,
'l<ashington Public Power Supply System REC IP. NAME RECIPIENT AFFILIATION'CHNENCERrA.
Licensing Branch 2
SUBJECT:
Forwards change to "FSAR Chapter 11 '
Section, 11.4 <<sys description of portable solid radwaste solidifaction sysr per NRC telcon request>Final submittal will be included in next FSAR amend, DISTRIBUTION CODE:
8001S COPIES RECEIVED:LTR
- ENCL, SIZE+
/
I TITLE: Licensing Submittal:
PSAR/FSAR Amdts 8 Related Correspondence NOTES:
RECIPIENT IO CODE/NAME NRR/DL/ADL NRR LB2" LA INTERNAL: ELD/HDS2 IE/OEPER/EPB 36 IE/DEQA/QAB 21 NRR/OE/CEB 11 NRR/DE/EQB 13 NRR/OE/MEB 18 NRR/DF/SAB 24 NRR/OHFS/HFEB40 NRR/DHFS/PSRB NRR/DS I/AEB 26 NRR/DSI/CPB 10 NRR/OS I/ICSB 16 NRR/DSI/PSB 19 NRR/OS I/RSB 23 RGN5 EXTERNALS ACRS 41 OMB/DSS (Af'1DTS)
LPOR
" 03 NSIC 05 COPIES LTTR ENCL 1
0 0
0 3
3 1
1 1
1' 2
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
3 3
6 6
1 1
1 1
1 1
REC IP IENT ID CODE/NAME NRR LB2 BC AULUCKrR~
IE F ILE IE/DEPER/IRB 35 NRR/DE/AEAB NRR/OE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DSI/ASB NRR/DSI/CSB 09 NRR/DSI/METB 12 N
RAB 22 EG FILE 04 AMI/MI8 BNL(AMDTS ONLY)
FEMA"REP DIV 39 NRC PDR 02 NTIS COPIES
'TTR ENCL 1
0 1
1 1
1 1
1 1
0 1
1 2
2 1
1 1
1 1
1 1
0 1
1 1
1 1
1 1
1 1
0 1
1 1
1 1
1 1
1 TOTAL NUMBER OF COP1ES REQUIRED; LTTR 53 ENCL 46
I wii W
e
~
" ~ ""
Af 4 Ww<<>>
~ J r vw iflfwwfr wiw f.f IVw,w
.>>>f >nf W
ft f i>>,Wkr w
iwr
>>1 f
Wik>>i
>>i'W f)
Wf WW W
r i
Il "i i' W
lid i'1 f
'W 1
<<<<<<e
~ <<<<e <<>>
~: 4t,rc.
,') f~'WR i
A
'>>W w) W>
l
, 'V 1 W, W
W'4 Wl'4 n
4 W
~
W ii f
>>'4',
4$
Jt 44 T il
~
W fi I
W 4
iW, il W
~
R WX Ii Qi'I r
(
vl 7
44
,7i
,4
Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 November 3, 1983 G02-83-1012 Docket No. 50-397 Director of Nuclear Reactor Regulation Attention:
Mr. A. Schwencer, Chief Licensing Branch No.
2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Schwencer:
Subject:
Reference:
NUCLEAR PROJECT NO.
2 SOLID WASTE MANAGEMENT SYSTEM FSAR CHAPTER 11, SECTION 11.4 Letter, G02-83-907, G.
C. Sorensen (SS) to A.
Schwencer (NRC), same subject, dated October ll, 1983 The reference letter transmitted the FSAR Section 11.4 system description of the Portable Solid Radioactive Waste Solidification System.
A telephone request by C. Miller (NRC} was made to clarify a statement in the text of FSAR Section. 11.4.2.
Attached is a copy of the change.
Final submittal of this change will be made in the next amendment of the FSAR.
If there are any questions, please contact Mr. P. L. Powell, Manager, WNP-2 Licensing.
Very truly yours, G. C. Sorensen, Acting Manager Nuclear Safety and Regulatory Programs BDP/tmh Attachment cc:
R Auluck -
NRC WS Chin BPA AD Toth NRC Site 83ii090066 83ii03 PDR ADOCK 05000397 A
J
'd f,
WNP-2 AHENDNEMT NO.
33 November 1983 1 1. 4. 2 SYSTEM DESCRIPTION The system description which fol.lows concerns the permanent WNP-2 Solid Waste
'1anagement System.
The equipment for this system is presently oeing stored at the site and installation is scheduled for sometime after commercial operations.
In the 'nterim period, from fuel loacl until. the permanent
. ystem is installed, a mobile solid waste managen!ent system will be utilized by WNP-2.
The mobile solid waste management sy.tern !rill be supplied and operated by Chem-Nuclear Systems Inc.
(CHSI) per the reauire-ments of -'heir NRC approved topical report CNSI-2 (4313-01354-01P-A)
Revision 2.
This topical report was approved by the NRC on April 11,
- 1983, and WNP-2 will util'ize the system as c'.escribed in the report witnout deviation.
The types and quanti ties of waste to ne processed will be the sa!ne as described
'oelow
. It 's anticipated that CNSI Type 6-80 <<nd 14-195?! shipping casks and associated liners wil). be g'Splat&
System operation will. be closely mc~n'.tored hy Supply System personnel.
'!'he vendor wi 11 be required to submi t for rev! ew and approval a Process Control Program which interfaces with and meets the intent of the program clescribed in section 11.4.3.
Temporary piping connecting the WHP-2 pl,ant radwaste subsys-tems is shown on Figures Ll.4-la ancl
- 1).4-1'o.
Th<<~ tc'mporary pipir!a is installed per Regulatory Guide 1.143 requirements,.
.).e mo'oile system will be set on a curbed concrete pad ad ja-cent to the Radwaste Building as shown in r iaure '. 4-2
~
The curbed pad an<i sump a
e suf ficiently sized to contain a spi).1 "ron.
a fu11 I incr.
Should s::"h
<<~
pi 1.1 occu the contan in-ated liquid wi 11 flow into tne
- sump, whici! is isolated.
Ti<<c.
contents of the s
mp can then be pumped bark to the radwaste system for processina using a portable sump pump connecteci to "he mob le system plant return lin The sump contain" an isolat ion valve wl!ich, by ac'.mini str <<tive !~rocec)urc.,
is c!osed t in!e the mobi.! e system is processing radioactive>>aste.
Al'he radioactive mobile system ver!ts ar'. routed;-ack to th~ ra<<)waste buildinq
) VPC system where they c<<an be fi ltered a>>di moni tored.
Accident analysis for the
) i ner
..pill can be founcl in the CNSI topical report.
Use of the rncni 1 e solic'.i f icat'.on sys "em me'lrls tha" he tems described in sections l.l.-'..2.6 ancl 1).4.2.7 for d
- o. concentratec, wastes and resin slurr'es:.re b"oasseci k
sys-L s'posa as
f~
I 0
'E