Forwards Rev 1 to, Hanford Site Evacuation Time Assessment Study. Study Provides Technical Basis for Info Included in Emergency Preparedness Plan
ML17277A422
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/18/1983
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML17277A423 List:
References
GO2-83-049, GO2-83-49, NUDOCS 8302030346
Download: ML17277A422 (4)


Text

R EGULATORY OFORMATION OISTRIBUTION SYQM (RIBS)

ACCESSION NBR ~ 8302030346 DOC eDATE 83/01/18 NOTARIZED NO e DOCKET FACIL:50-397 NPPSS Nuclear Project< Unit 2F 1lashington Public Powe 05000397 AUTH, NAME AUTHOR AFFILIATION BAUCHEY<G,D, Nashington Public .Power Supply "'System RECIP,NAME RECIPIENT AFFILIATION SCHNiENCERFAB Licensing Branch 2

SUBJECT:

Forwards "Manford Site Evacuation Time Assessment Study f Rev 1,Study provides technical basis for info included in emergency preparedness plan, DISTRIBUTION CODE: 8001S COPIES RECEIVED:LTR ENCL X~ SIZE:,

TITLE: Licensing Submittal:,PSAR/FSAR Amdts L Related Correspondence NOTES:

RECIPIENT COPIES REC IP IENT COP IES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL NRR/DL/ADL 1 0 NRR L82 BC 1 0 NRR L82 LA 1 0 AUI UCKFR ~ 01 1 1 INTERNAL: ELD/HDS2 1 0 IE FILE 1 1 IE/DEP EPDS 35 1 1 IE/DEP/EPLB 36 Y3 3 NRR/DE/AEAB 1 0 NRR/DE/CEB 11 1 1 NRR/DE/EQB 13 2 2 NRR/DE/GB 28 2 2 NRR/DE/HGEB 30 1 1 NRR/DE/MEB 18 1 1 NRR/DE/MTEB 17 1 1 NRR/DE/GAB 21 1 1 NRR/DE/SAB 24 1 1 NRR/DE/SEB 25 1 1 NRR/DHFS/HFEB40 1 1 NRR/DHFS/LQB 32 1 1

.NRR/DHFS/OLB 34 1 1 NRR/DL/SSPB 1 0 NRR/DS I/AE8 26 1 NRR/DS I/ASB 1

'4 1

NRR/DSI/CP8 10 1 NRR/DSI/CSB 09 1 1

~

NRR/DSI/ICSB 16 1 1 NRR/DS I/METB 1'2 1 NRR/DSI/PSB 19 1 1 D RAB 22 1 1 NRR/DSI/RSB 23 1 1 REG F 1 1 RGN5 3 MI/Ml8 1 0 EXTERNAL: ACRS 41 6 6 BNL(AMDTS ONLY) 1 1 DMB/DSS (AMDTS) 1 1 FEMA"REP DIV 39 1 1 LPDR 03 1 1 NRC PDR 02 1 NSIC 05 1 1 NTIS 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 53 ENCL 46

A j(A "v

iilV (A VVIV V<iVI

~C ~ >>AA>>A ~ ."<~1 A il It (i L (I '(A i

g',

,(h

Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 January 18, 1983 G02-83-049 Docket No. 50-397 Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Schwencer:

Subject:

NUCLEAR PROJECT NO. 2 HANFORD SITE EVACUATION TIME ASSESSMENT STUDY Enclosed are sixty (60) copies of the Hanford Site Evacuation Time Assess-ment Study. This study provides technical basis for information included in the Emergency Preparedness Plan (EPP).

Very truly yours, W~ Ap Manager, Nuclear Safety and Regulatory Programs jca Enclosure cc: R WS Auluck Chin -